About this file

Draft SOW

View the file

Other files

File Type Posted
FA820218R1005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense (DoD) and U.S. DoD Contractors only

(administrative or operational use) 1 Aug 2015. Other requests for a copy of this document shall be referred to

AFLCMC/WWA.

AIR FORCE LIFE CYCLE MANAGEMENT CENTER

(AFLCMC)

A-10 DIVISION (WWA)

HILL AIR FORCE BASE, UTAH

STATEMENT OF WORK (SOW)

for

A-10 Onboard Oxygen Generating System

(OBOGS)

Group B Kit Assemblies

19 APRIL 2018 REV 2

Prepared by:

A-10 Division

Ogden Air Logistics Complex Hill Air Force Base, Utah, 84056

1385280722C Draft

REVISION CONTROL

Revision Date Description Pages

- 2 August 17 Initial Release 5

Rev 1 14 Nov 17 Rev 1 5

Rev 2 RvRe

19 Apr 18 Rev 2 5

Table of Contents

1. Scope

2. Applicability

3. Background

4. Program Objectives

5. Period of Performance

6. Supply Point:

7. Packaging, Marking and Shipping

8. Definitions

9. Attachments

1. Scope

This Statement of Work (SOW) establishes the Contractor activities required to support efforts to integrate the Onboard Oxygen Generating System (OBOGS) on the A-10. The scope of this SOW is to deliver seventy (250) OBOGS Group B kit (NSN 1560K0106065BFJ) assemblies and sixteen (16) Leak Chamber sets (NSN 6636-01-528- 9316).

2. Applicability

A/OA-10C

3. Background The purpose is to retrofit the A-10 aircraft by removing the present liquid oxygen system and installing the OBOGS. Due to its cryogenic nature, liquid oxygen systems require special handling precautions which adversely impact maintenance costs and increase downtime between sorties. The OBOGS mitigates the constraints of liquid oxygen by utilizing engine bleed air as the source of breathing oxygen and eliminates the maintenance costs and sortie delays the liquid oxygen system incurs.

4. Program Objectives The primary objectives of the tasks provided within this SOW are:

1) Contractor shall deliver complete sets of Group B kits to the location specified in paragraph 6 below.

OBOGS Group B kit to consist of the following:

a.

NOMENCLATURE

Concentrator

PART NUMBER

3261124-0201

NSN

1660-01-473-3547

b. Regulator 3260050-0205 1660-01-473-3549

c. Oxygen Monitor 3270063-0601 1660-01-619-3225

d. REOS 3261130-0401 NSL

e. Plenum, 250 3261134-0201 NSL

f. Water Separator 3261179-0101 NSL

2) Contractor shall deliver sixteen (16) Leak Chamber Sets to locations specified in the contract.

5. Delivery Schedule

The contractor shall deliver the initial quantity of seventy (70) OBOGS B kit assemblies and six (6) Leak Chamber Sets no later than 12 months after award of contract. All other deliveries shall be within 12 months of additional quantity award.

6. Supply Point:

All OBOGS B kit assemblies and Leak Chamber Sets are to be shipped to:

FB2029

DDHU Hill Facility Central Receiving, Bldg 849 W 5851 F Ave Hill AFB, UT 84056-5713

Mark For: Stock

(Make sure the Kit NSN is put on the packaging)

7. Packaging, Marking and Shipping

Items 1-6 (below) must be shipped as a ship-set (A-10 OBOGS B-Kit). Each ship-set will be clearly marked with kit number 1560K0106065BFJ. A ship-set includes one each of the following:

NOMENCLATURE PART NUMBER NSN

1. Concentrator 3261124-0201 1660-01-473-3547

2. Regulator 3260050-0205 1660-01-473-3549

3. Oxygen Monitor 3270063-0601 1660-01-619-3225

4. REOS 3261130-0401 NSL

5. Plenum, 250 3261134-0201 NSL

6. Water Separator 3261179-0101 NSL

The Leak Chamber Sets will be shipped separately to units identified in the contract.

The contractor shall package and ship using MIL-STD-2073-1D, Standard Practice for Military Packaging.

DoD Documents:

A. MIL-STD-130N, 17 Dec 2007 Identification Marking of U.S. Military Property B. MIL-STD-2073-1D, Standard Practice for Military Packaging Government

Shipping shall be F.O.B. Destination. The contractor shall be responsible for all associated shipping costs for delivery to the government facility. Shipping costs are to be included in the price of each kit.

Inspection and Acceptance of Deliverables: Inspection and Acceptance shall be conducted at origin in accordance with MIL-I inspection through DCMA. Invoices shall be submitted IAW clause 52.247-48, F.O.B. Destination, Evidence of Shipment.

8. Definitions

Component. An item below the assembly level that may be repairable or non-repairable.

Data. Information generated for the requirements listed in the Data Item Description (DID).

End Item. An item having all accessories and components comprising a piece of equipment and suitable for Government storage and issue.

Military Standard: used to help achieve standardization objectives by the U.S.

Department of Defense.

Ship-set: the full complement of what is needed to complete a kit assembly

NSL: not stock listed

9. Attachments