Bldg. 680 Asbestos Report

View the file

Other files for this federal contract opportunity

Other files attached to Bldg. 680 Construct Classroom Addition, newest first.
File Type Posted
B680_Solit__Amend_02.docx DOCX document
Final_Contractor_Q_and_A_B680 _31May2016r1.docx DOCX document
Final_Contractor_Q_and_A_B680 _31May2016r1.docx DOCX document
IMG_0535.JPG JPG image
IMG_0537.JPG JPG image
IMG_0545.JPG JPG image
IMG_0528.JPG JPG image
IMG_0530.JPG JPG image
IMG_0540.JPG JPG image
IMG_0546.JPG JPG image
IMG_0538.JPG JPG image
IMG_0548.JPG JPG image
IMG_0543.JPG JPG image
IMG_0544.JPG JPG image
IMG_0534.JPG JPG image
IMG_0549.JPG JPG image
Bldg._680_Amend_01.docx DOCX document
IMG_0531.JPG JPG image
IMG_0533.JPG JPG image
IMG_0550.JPG JPG image
IMG_0529.JPG JPG image
IMG_0536.JPG JPG image
Bldg_680_-_Site_Visit_Attendance_Record_-_19_May_2016.pdf PDF
IMG_0541.JPG JPG image
IMG_0539.JPG JPG image
IMG_0547.JPG JPG image
IMG_0532.JPG JPG image
IMG_0542.JPG JPG image
TAB_K__1_Aug_11.pdf PDF
Storm_Water_Pollution_Prevention_Plan_Building_680_KRSM_152043.pdf PDF
H680K152043_Design_Analysis_Final.pdf PDF
APPENDIX_C_MASTER_ON_or_OFF_BASE_UPDATED_March_2015.docx DOCX document
UT104.txt TXT text file
Drawing_Schedule_Building_680_KRSM_152043.doc DOC document
Drawings_Building_680_KRSM_152043.pdf PDF
BLDG_680_SECTION_J.docx DOCX document
Specifications_Building_680_KRSM_152043.pdf PDF
BASE_FACILITY_DESIGN_STANDARD.docx DOCX document
Specifications_Table_of_Contents_Building_680_KRSM_152043.pdf PDF
Bldg-680_WO58149_Lead_Paint.xlsx XLSX spreadsheet
BLDG_680_Solicitaion_r4.docx DOCX document
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

DEPARTMENT OF THE AIR FORCE
75 CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
LIMITED ASBESTOS INSPECTION REPORT,HILL AFB BUILDING, 680
CONSTRUCT TRAINING ROOMS EAST SIDE
Date Requested:December 2015Re-Inspection Date:21 March 2016
Requester:Terry HessInspector:Traver Andreasen (Utah Certified Asbestos Inspector ASB#-4397)
Organization:309 AMXG/EN
Location & Building:HILL AFB BUILDING, 680
Work Order:58149
Affected Area:East Break Room and Exterior.
Statement of Work:Construct new classroom east of break room.
Remove existing exterior doors, tie into new structure once constructed.
Excavate for footings/foundation/utilities.

This inspection was performed in accordance with the Utah Division of Air Quality (DAQ) requirements as found in the Utah Air Quality Rule R307-801-10. This inspection report is required to be on site during all abatement, renovation, and demolition activities. Samples referenced in this report were analyzed by polarized light microscopy (PLM) utilizing method 600R-93-116 by The Science and Engineering laboratory at Hill Air Force Base, Utah.

Civil Engineering personnel also reviewed previous asbestos inspection reports of suspect asbestos containing building materials (ACM) that could potentially be encountered in this area. The information gathered from all current and previous inspections is shown below by homogenous area.

SUMMARY OF ASBESTOS CONTAINING MATERIALS FOUND

MATERIAL TYPEASBESTOSFRIABILITY (During Removal)**RACM *Category I *Category IIQUANTITY*LOCATIONS FOUND
Buried pipes, cables, and conduitsAssumedFriable and/or Non FriablePotential, RACMUnknownEast of existing facility: Underground
*Per UDAQ definition.
RACM: Regulated Asbestos-Containing Material (RACM)" means friable ACM, Category I non-friable ACM that has become friable, Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation project operations.
Category I Non-Friable ACM: Asbestos-containing packings, gaskets, resilient floor coverings, or asphalt roofing products containing more than 1% asbestos as determined by using the method specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM).
Category II Non-Friable ACM: Any material, excluding Category I non- friable ACM, containing more than 1% asbestos as determined by using the methods specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM) that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
Locations found: Locations of building materials as described in this report indicate where they were found, but do not necessarily mean that these are the only locations where these materials may be encountered during the project.
Summary of materials containing ≤1% was identified via "Point Counting". ≤1% is not considered to be an asbestos containing material, but special handling/packaging requirements are necessary per OSHA 29CFR 1926.1101 and 29CFR 1910.1001
MATERIAL TYPEASBESTOSQUANTITY*LOCATIONS FOUND
N/AN/AN/AN/A

The following is a list of the "Suspect Materials" that were sampled as part of this inspection:

12" Floor Tile, Grey/Adhesive yellowDrywall/Joint Compound Wall System
2'x4' Ceiling Tile, Wormygrooves/Pinholes, White2'x4' Ceiling Tile, Pockmarks/Pinholes, White
Ceiling Tile Batt Insulation, WhiteWall Batt Insulation, White
Wall Board Insulation, White/YellowThermal System Pipe Insualtion, Foil/Yellow
Thermal System Pipe Insualtion, White/YellowThermal System Pipe Fitting Insulation, White/White
Pipe Insualtion Lagging, White
A total of37samples reference the11suspect materials assesses as part of the inspection.
The following table summarizes the sampling data.
Homogenous Building Material, Description, Location, Quantity.Sample #Sample LocationResults
12" Floor Tile, Grey over Adhesive Yellow, 1,000 Square FeetGM131300Southwest, Room 102None-Detected
GM131301Southeast, Room 101None-Detected
GM131302Southwest, Room 108None-Detected
Drywall/Joint Compound Wall System, 5,000 Square FeetGM131308Southwest, Exterior, Room 124None-Detected
GM131309Northwest, Room 123None-Detected
GM131310Southwest, Room 102None-Detected
GM131311Southeast, Room 120None-Detected
GM131312West Center, Room 121None-Detected
GM131313South Center, Room 108None-Detected
GM131314Northeast, Room 121None-Detected
2'x4' Ceiling Tile, Wormygrooves/Pinholes Pattern, White, 25 Square FeetGM131321Northwest, East Office HallwayNone-Detected
2'x4' Ceiling Tile, Pockmarks/Pinholes Pattern, White, 1,500 Square FeetGM131325Southwest, Room 102None-Detected
GM131326Center, Room 103None-Detected
GM131327Northwest, Room 108None-Detected
GM131328Center, East Office HallwayNone-Detected
GM131329Northeast, Room 101None-Detected
Ceiling Tile Batt Insulation, White, 400 Square FeetGM131335West Center, Room 120None-Detected
GM131336West Center, Room 121None-Detected
GM131337East Center, Room 121None-Detected
Wall Batt Insulation, White, 1,000 Square FeetGM131338North Center, HangarNone-Detected
GM131339Northwest, West MezzanineNone-Detected
GM131340Northwest, East MezzanineNone-Detected
Wall Board Insulation, White over Yellow, 500 Square FeetGM131341Northeast, HangarNone-Detected
GM131342Northwest, HangarNone-Detected
GM131343Southeast, HangarNone-Detected
Thermal System Pipe Insulation, Foil/Yellow, 50 Linear FeetGM131344North Center, West MezzanineNone-Detected
GM131345Northwest, Room 106None-Detected
GM131346West Center, Dock E-4None-Detected
Thermal System Pipe Insulation, White over Yellow, 1,000 Linear FeetGM131347Southeast, East MezzanineNone-Detected
GM131348Northeast, Room 106None-Detected
GM131349West Center, Dock E-4None-Detected
Thermal System Pipe Fitting insulation, White over WhiteGM131350West Center, Room 106None-Detected
GM131351South Center, East MezzanineNone-Detected
GM131352West Center, HangarNone-Detected
Pipe Insulation Lagging, White, 200 Linear FeetGM131353East Center, Dock E-3None-Detected
GM131354Southeast, East MezzanineNone-Detected
GM131355West Center, Dock E-1None-Detected

Per EPA requirements, all materials analyzed as containing ≤10% asbestos are point counted utilizing EPA method 600/R-93/116.

POTENTIAL FOR ADDITIONAL MATERIALS:
This inspection report only encompasses the areas/materials designated within this report. Should the scope of the project be altered in any way or any materials found that are not identified in this report shall require additional assessment. This report cannot be used for any other projects within the building.
This report was inspected by:
Traver Andreasen (Utah Certified Asbestos Inspector ASB#-4397)
of the 75 CES/CEOHA Asbestos/LBP Shop.
Any questions or concerns regarding this inspection report or if any new suspect asbestos containing material (ACM) is encountered, stop work and contact the personnel listed below for further assistance.

CONTACT INFORMATION

Asbetsos/LBP Shop 75 CES(CEOHA)

Supervisor: Nickolas King:DSN: (801)586-7094Asbestos/LBP Shop (801)777-8006
Cell: (801)430-4785

Building: 680

Construct addition for training.WO#: 58149
&P21 march 2016

1000 Hours

Sheet2

Traver Andreasen (Utah Certified Asbestos Inspector ASB#-4397)
Chase Johnson (Utah Certified Asbestos Inspector ASB#-5645)
Nickolas King (Utah Certified Asbestos Inspector ASB#-2257)
Raudel Arteaga (Utah Certified Asbestos Inspector ASB#-5863)