WEMS_SOW__Item_Description,_Final_Phase.pdf

PDF 157 KB Posted

Attached to
WEMS Final Phase Federal contract opportunity
Solicitation number
FA8126-18-R-0005
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Item Description/SOW

View the file

Other files for this federal contract opportunity

Other files attached to WEMS Final Phase, newest first.
File Type Posted
redacted_J&A.pdf PDF
solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW/Item Description

WEMS Prototype Industrial Equipment Monitoring

Provide and install the necessary components to allow for the collection of data on Depot Industrial

Plant Equipment (DIPE) in real-time. This data will be gathered and transferred to the Honeywell EBI front end servers as used with the Energy Savings Project Contract (ESPC) ongoing at Tinker AFB. It is required that this data will be in such a format to be readily available for download to the FEM equipment data management system in use at Tinker AFB. This is the final phase of a pilot program that could be duplicated for future expansion.

1. This work will be performed on 40 pieces of Depot Industrial Plane Equipment (DIPE) in B3001, this equipment is located in the Plasma Spray Coating area located around post I77; and 12 pieces of Depot Industrial Plane Equipment (DIPE) in B3221 around post M2, and this equipment is located in the Plasma Spray Coating area, Tinker AFB. See equipment list included with this SOW.

2. Vibration data will be gathered and reported on these equipment. This activity will be reportable in real time while the equipment is in operation.

3. Run Time data will be recorded and reported at the end of equipment on/off cycle.

4. Run status information will also be provided from the system back to FEM for the purpose of observing operation status from remote locations.

5. Power consumption information shall be provided as part of the data gathering process for the purpose of potential energy savings.

6. Develop and provide a graphic interface to display operational status of the equipment from a remote location, provide real time vibration data, run time data, run status information and power consumption information.

7. Standard commercial warranty shall be provided.

8. Output data to the FEM system shall be in such a format as to be automatically imported with no user input.

9. Software coding shall be written by others for the purpose of importing data from Honeywell EBI front end servers imported into the FEM data system.

10. The vendor will provide training for the day to day use of the system in addition to management functions of the system such as system diagnostic and any access requirements for use.

11. Vendor shall provide and install the following:

(1) Honeywell 1/2 Panel with back-plane and lockable door

(1) Honeywell CPO-PC-6A Plant controller, additional unit may be required depending upon controller capacity.

DEPARTMENT OF THE AIR FORCE

OKLAHOMA CITY AIR LOGISTICS COMPLES (OC-ALC)

TINKER AIR FORCE BASE OKLAHOMA

(1) Veris E50H5 Power Meter with BACnet and Data Logging

(3) Kele SCT-1250-200 Current Transformers rated for up to 200 Amps

(1) Kele 120V – 24V 100VA Power Supply

(1) Balmac 140T Vibration Sensor

(1) Graphics page in EBI to display previously mentioned data points

(1) All materials required to connect data gathering to the Honeywell EBI front end server

(1) All materials required to connect power to components that require it

Summary

The purpose of this effort is to record the data points as gathered in Items 2, 3, 4 and 5 listed above. This information will be available for viewing in real time at a computer monitor station through our FEM system.

Equipment List Asset ID # Description Location

OC21694 COLLECTOR, DUST PLASMA BOOTH 1 (NORTH) 3001J70

OC20453 COLLECTOR, DUST PLASMA BOOTH 10 3001H72

OC20454 COLLECTOR, DUST PLASMA BOOTH 11 3001H72

OC12329 COLLECTOR, DUST PLASMA BOOTH 12 (S20) 3001H71

OC19290 COLLECTOR, DUST PLASMA BOOTH 13 (OUTSIDE W. OF H.T.) 3001

OC14757 COLLECTOR, DUST PLASMA BOOTH 14 3001J4

OC19204 COLLECTOR, DUST PLASMA BOOTH 15 (OUTSIDE WEST OF HEAT TREAT) 3001

OC19653 COLLECTOR, DUST PLASMA BOOTH 16 (OUTSIDE W. OF H.T.) 3001

OC17285 COLLECTOR, DUST PLASMA BOOTH 17 3001J4

OC19344 COLLECTOR, DUST PLASMA BOOTH 18 (OUTSIDE W. OF H.T.) 3001

OC19341 COLLECTOR, DUST PLASMA BOOTH 19 (OUTSIDE W. OF H.T.) 3001

OC21698 COLLECTOR, DUST PLASMA BOOTH 2 (SOUTH) 3001J71

OC23127 COLLECTOR, DUST PLASMA BOOTH 25 3001I75

OC12335 COLLECTOR, DUST PLASMA BOOTH 3 (N3E15) 3001I71

OC12333 COLLECTOR, DUST PLASMA BOOTH 4 (N15 E15) 3001I71

OC12331 COLLECTOR, DUST PLASMA BOOTH 5 (N25 E15) 3001I71

OC12334 COLLECTOR, DUST PLASMA BOOTH 6 (S20 E15) 3001I73

OC12332 COLLECTOR, DUST PLASMA BOOTH 7 (S10E15) 3001I73

OC12325 COLLECTOR, DUST PLASMA BOOTH 8 (N3 E15) 3001G72

OC12326 COLLECTOR, DUST PLASMA BOOTH 9 (S10 E15) 3001G71

OC19202 PLASMA SPRAY AUTOMATED SYSTEM #15 3001H71

OC21693 PLASMA SPRAY, AUTOMATED SYSTEM #1 (NORTH) 3001J70

OC20437 PLASMA SPRAY, AUTOMATED SYSTEM #10 3001H72

OC20438 PLASMA SPRAY, AUTOMATED SYSTEM #11 3001H72

OC14905 PLASMA SPRAY, AUTOMATED SYSTEM #12 (15 SOUTH) 3001H71

OC19289 PLASMA SPRAY, AUTOMATED SYSTEM #13 (SOUTH BOOTH) 3001K11

OC14756 PLASMA SPRAY, AUTOMATED SYSTEM #14 (HVOF) 3001K10

OC19292 PLASMA SPRAY, AUTOMATED SYSTEM #16 (NORTH BOOTH) 3001K11

OC15711 PLASMA SPRAY, AUTOMATED SYSTEM #17 (HVOF) 3001D75

OC21697 PLASMA SPRAY, AUTOMATED SYSTEM #2 (SOUTH) 3001J71

OC20432 PLASMA SPRAY, AUTOMATED SYSTEM #25 3001I75

OC14604 PLASMA SPRAY, AUTOMATED SYSTEM #3 (5 NORTH) 3001I71

OC19340 PLASMA SPRAY, AUTOMATED SYSTEM #3/19 AP0723 HVOF (NW BOOTH) 3001K11

OC14605 PLASMA SPRAY, AUTOMATED SYSTEM #4 (20 NORTH) 3001I71

OC19343 PLASMA SPRAY, AUTOMATED SYSTEM #4/18 AP0723 HVOF (SW BOOTH) 3001K11

OC14606 PLASMA SPRAY, AUTOMATED SYSTEM #5 (30 SOUTH) 3001I73

OC14899 PLASMA SPRAY, AUTOMATED SYSTEM #6 (20 SOUTH) 3001I73

OC14900 PLASMA SPRAY, AUTOMATED SYSTEM #7 (5 SOUTH) 3001I73

OC14607 PLASMA SPRAY, AUTOMATED SYSTEM #8 (30 SOUTH) 3001H73

OC14609 PLASMA SPRAY, AUTOMATED SYSTEM #9 3001H71

OC19238 COLLECTOR DUST PLASMA BOOTH 22 3221M4

OC12883 COLLECTOR, DUST PLASMA BOOTH 21 3221M4

OC14917 COLLECTOR, DUST PLASMA BOOTH 20 3221M2

OC12884 COLLECTOR, DUST PLASMA BOOTH 23 3221

OC20851 COLLECTOR, DUST PLASMA BOOTH 26 3221M2

OC20852 COLLECTOR, DUST PLASMA BOOTH 27 3221M2

OC14906 PLASMA SPRAY, AUTOMATED SYSTEM #20 (25 NORTH) 3221J1

OC14907 PLASMA SPRAY, AUTOMATED SYSTEM #21 (10 NE) 3221J1

OC19237 PLASMA SPRAY, AUTOMATED SYSTEM #22 (HVOF) 3221M4

OC14610 PLASMA SPRAY, AUTOMATED SYSTEM #23 (10 SW) 3221M4

OC20040 PLASMA SPRAY, AUTOMATED SYSTEM #26 3221J5

OC20039 PLASMA SPRAY, AUTOMATED SYSTEM #27 3221I5