PWS for Portable Swager Repair.pdf
PDF 247 KB Posted
- Attached to
- Portable Swager Repair
- Solicitation number
- FA8125-26-Q-0060
About this file
This is a Performance Work Statement (PWS) for Portable Swager Repair services under contract number Serv C26-010, prepared by OC-ALC/OBCA on 16 April 2026.
The contractor shall provide all labor, tools, equipment, test equipment, materials, parts, quality control, transportation, and inspection services necessary to repair portable swagers (OEM repair Code RCCDIM) for the Oklahoma City–Air Logistics Complex. The contract is structured as a five-year Indefinite Delivery Indefinite Quantity (IDIQ) agreement with one base year and four one-year options. The minimum initial order requires repair of three portable swagers, with estimated annual usage of eleven repairs and a contract maximum of one hundred repairs (twenty per year maximum). All repairs must meet OEM specifications and restore equipment to full operational capability. The contractor shall provide Test, Teardown, and Evaluation (TT&E) on each part and submit an evaluation report within one business day, including testing information, repair recommendations, required parts and part numbers, proposed delivery schedule, and proposed firm fixed price broken down by labor hours, material costs, other direct costs, and return shipping. Upon notification of equipment malfunction, the technician shall arrive on-site within two business days domestically or five business days if overseas. The Contracting Officer must authorize all repair actions in writing before parts are ordered or repairs commence. The contractor shall use only new parts and materials unless otherwise authorized and must provide a comprehensive Service Report upon completion, including labor cost breakdown, materials used, and verification that a performance check confirmed operational status. Repaired equipment must be returned within five business days after repair completion using the fastest and most traceable shipping method with FOB Destination to Tinker AFB, Oklahoma. The contractor shall establish a Contract Manager fluent in English with full authority to act on all contract matters and must demonstrate familiarity with swagers, access to technical drawings, and proof of experience repairing pneumatic cable swagers. Work shall be performed Monday through Friday, 0600 am to 1400 pm, and the contractor must provide written environmental certification that repaired equipment is cleaned and purged of hazardous contaminants and fluids before return to Tinker AFB.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Equipment List.pdf | ||
| FA8125-26-Q-0060.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
For
Portable Swager Repair
Serv C26-010
PREPARED BY:
OC-ALC/OBCA
16 April 2026
Commanders Safety Intent: The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precaution to prevent accidents and preserve the health/safety of each contractor and government employee.
Section One
Description of Services
1.1 Scope: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform the repairs of Portable Swagers (OEM repair Code RCCDIM) on the Equipment list for the Oklahoma City– Air Logistics Complex (OC-ALC).
1.1.1 The Contractor shall be responsible for insuring all services, parts and Original
Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS.
1.2 Requested Services: The Government requires the following services to be provided under an five (5) year Indefinite Delivery Indefinite Quantity (IDIQ) contract (one-base year with four (4) one-year options) as follows:
a) Minimum initial order – repair of three (3) portable swagers.
b) Estimated annual usage – repair of eleven (11) portable swagers.
c) Contract maximum – repair of one hundred (100) portable swagers (twenty (20) per year maximum).
d) The Contractor shall provide repair services for items within the Equipment List.
All repairs must meet OEM specifications and restore the equipment to full operational capability.
1.3 Evaluation Report: The Contractor shall accomplish Test, Teardown, and Evaluation
(TT&E) on each part to be repaired and provide in person, by fax or by e-mail an evaluation report on a contractor devised form to the Government Point of Contact (GPOC) and the Contracting Officer (CO) within (1) business day. As a minimum, the information cited on the evaluation report shall include:
• date of evaluation
• testing information
• repair recommendation
• required parts and part numbers
• proposed delivery schedule
• proposed firm fixed price for repair
1.3.1 The proposed firm fixed price for repair shall be broken out into the following categories:
• firm fixed price labor rate multiplied by number of labor hours proposed
• material costs
• other direct costs (if applicable)
• return shipping costs for parts to be repaired and parts that cannot be repaired
1.4 Over and Above (O&A): O&A is defined as work discovered during the course of performing the repair efforts that is within the scope of the contract and necessary in order to satisfactorily complete the contract. The Contractor shall complete O&A requirements In Accordance With (IAW) Defense Federal Acquisition Regulation Supplement (DFARS) 252.217-7028. PGI 217.77.
1.5 Malfunction and Notification Process: Upon occurrence of an equipment or system malfunction, the GPOC will contact the Contractor by telephone, email, or fax and provide information below. If the GPOC notifies the Contractor via telephone, the GPOC will provide a written copy of the request by email or fax.
• the equipment identification number (ID#)
• a brief description of the malfunction
• location of equipment
• name and telephone number of the Point of Contact (POC)
1.5.1 Upon notification of the system malfunction, the technician shall arrive on site at the equipment location within two (2) business days or if overseas five (5) business days.
1.6 Equipment Evaluations: The Contractor shall provide a written Estimate Repair Report to the GPOC by fax or email no later than (NLT) one (1) business day after the completion of the inspection. As a minimum, the information cited on the Estimate Repair Report shall include:
• the equipment ID#
• date of evaluation
• description of findings and recommendations
• required parts and part numbers (P/N)
• cost of parts
• number of parts needed
• estimated labor hours required to complete the repair
1.6.1 Any recommendations cited shall consider:
• the priority of the requested service
• available source for obtaining new parts
• the availability of the new parts
• shipping and delivery schedules of parts
• other factors which may be peculiar to the specific repair requirement
1.7 Authorizations for Repair Actions: Only the Contracting Officer (CO) can authorize repair actions. The GPOC will coordinate any repair actions with the Government Subject Matter Expert (SME) and the CO in order to obtain the approval to proceed. The Contractor shall ensure all repair actions have the documented CO approval, in writing, before initiating any repair or ordering parts. The Contractor shall demonstrate to the Government SME that the repairs have been completed.
1.7.1 Once the authorization for repair action has been received from the CO, the Contractor shall order any required parts within two (2) business days and notify the GPOC, in writing, of the estimated arrival date of the parts. Upon the receipt of the parts, the Contractor shall perform the repair within five (5) business days. The GPOC will verify the receipt of the parts with the Contractor to ensure the repair is performed in a timely manner.
1.8 Parts and Materials: The Contractor shall provide and use only new parts and material in performance of this PWS unless otherwise authorized by the CO.
1.9 Service Report: Immediately upon completion of the maintenance support services and before leaving the OC-ALC, the Contractor shall provide a written Service Report to the Government SME. When necessary the Government SME will forward the service report to the Government POC within two (2) business days of receipt. The Contractor shall provide, by fax or email, the final service report within five (5) business days to the Government POC. As a minimum, the final service report shall contain the following information:
• name of the company
• requested service date
• contract number
• equipment ID#
• description of services provided
• additional services recommended (if any)
• printed name and signature of technician who performed the services
• printed name and signature of on-site Government SME or Government POC
• start and completion dates
• complete breakdown of the labor cost (hours and rate)
• materials and parts used
• details of any other charges
• printed name and signature stating only new parts and materials were used
• written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order.
1.10 Off-Site Repair: Repair of the equipment shall be completed at a Contractor designated repair facility. The Contractor shall not remove from the premises any system, sub-system or peripheral at any time in order to affect repair without the written consent of the Government.
1.10.1 The Contractor shall provide written documentation via email which supports a request to remove from the premises any system, sub-system or peripheral. Said written documentation and request shall include, as a minimum, the information listed below.
• contract number
• part number, OC #, S/N, as applicable
• description of the part, OC #, S/N, as applicable
• corresponding estimate repair report number
1.10.2 When determined necessary by the Government POC to ship items to the Contractor’s off-site facility for repair, the Contractor shall arrange for the scheduling, repair of the failed item and provide the appropriate shipping data to the Government POC. The Government POC will process the required shipping documents and arrange for transportation of the items listed within the Equipment List to the appropriate shipping bay for packaging, shipment, and transporting to the designated off-site facilities Free on Board (FOB) destination.
1.11 Return of Equipment: Upon completion of the approved repair, the Contractor shall conduct a performance check on the repaired equipment to verify it is restored to operational condition. The Contractor shall provide documentation that the performance check has been completed and the equipment is in working order IAW paragraph 1.8, Service Report, of this PWS.
The Contractor shall return the repaired equipment to the Government within the timeframe identified on the Estimate Repair Report.
1.12 Delivery: The Contractor shall ship all repaired and non-repairable equipment by the fastest and most traceable method in order to arrive within five (5) business days after the repair completion date.
1.13 Shipping: The Contractor shall provide to the Government POC, the date equipment was shipped out, shipment identification information and include contract number on the shipping paper work with a Free On Board (FOB) Destination. The ship to address is listed below.
ATTN: SURVEILLANCE GPOC #/Contract No: _____________
OC-ALC/OBC
Bldg. 3001 .
Tinker AFB, OK 73145-3052
1.14 Quality Assurance: According to the contract’s inspection clause, the Government will evaluate the Contractor’s performance under this contract. The GPOC will participate in the administration of this contract. Any matter concerning a change to the scope, prices, terms, or conditions of this contract shall be referred to the CO. All services to be performed by the Contractor during the period of this contract will be subject to review by the CO or GPOC.
1.15 Corrective Action Report (CAR)/Complaint Contractor Response Time: The Contractor shall provide a written response within two (2) business days which addresses the root cause, corrective action, and preventive actions in relation to the submitted CAR or Customer Complaint.
1.16 Continuation of Essential Department of Defense (DoD) Contractor Services During Crisis: This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DFARS 252.237-7023.
1.17 Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 0600 am to 1400 pm. If work hours are required outside the hours stated, the Contractor shall contact the GPOC for approval from the CO. Upon approval from the CO, the Government Subject Matter Expert (SME) or GPOC must be present with the Contractor.
These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.
1.18 Special Qualifications: The Contractor shall provide personnel with the following special qualifications:
1.18.1The Contractor shall provide at time of quote a statement showing that they are familiar with the swager and have access to the technical drawings in order to repair. No specific standard from ASME/ISO is required.
1.18.2The Contractor shall provide at time of quote proof of experience in repairing pneumatic cable swagers.
1.19 Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and Government POC, in writing, within ten (10) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air Force Base (AFB). The Contractor shall provide a CM who can read, write, speak, and understand English fluently.
1.20 Environmental Certification: The Government will ensure the part or equipment is clean, drained and purged before it is transferred to the Contractor for repair. The Government will provide written certification of such to the Contractor prior to shipment or pick up of the part or equipment. Certification will be on letterhead with a statement which specifies the part or equipment is certified to be clean, drained and purged. In addition, as a minimum, said letter will contain description of the part or equipment, make, model, serial number, and OC number (if applicable). This certification will be provided to the GPOC three (3) business days prior to the pick-up or shipment of the part or equipment. The GPOC will, in turn, provide it to the Contractor within two (2) business days prior to the pick-up or shipment of the part or equipment.
1.20.1 The Contractor shall ensure and provide written certification that the repaired swager is cleaned to remove all hazardous contaminants, dirt, shavings, oil, or grease, and drained and purged to remove all fluids, oils and liquids before returning to Tinker AFB. Certification shall be on company letterhead with a statement which specifies the part or equipment is certified to be clean, drained and purged. In addition, as a minimum, said letter shall contain description of part or equipment, make, model, serial number, and OC number (if applicable). This certification shall be provided to the GPOC two (2) business days prior to the return of the part or equipment.
1.21 Forms, Technical Orders (T.O.), AFI, Air Force Material Command Instructions (AFMCI), and Publications: The Contractor shall obtain the forms and publications expressly required to perform the work in this contract via the internet at www.e-publishing.af.mil. In the event a form or publication is not available online, the GPOC will provide the form, instruction, or publication to the Contractor upon the Contractor’s written request (e-mail is acceptable). In the event, laws, regulations, T.O.’s, AFI’s, or AFMCI’s change during the term of this contract, the Contractor shall be required to comply as the changes come into effect. Contractors delivering or handling official United States Air Force (USAF) records shall comply with the applicable records management regulations in AFI 33-322, Chapter 3, in its entirety.
1.22 Foreign Nationals: The Contractor shall notify the GPOC before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.
1.23 Safety and Health off Government Installations: While performing work under this contract the Contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. During the execution of the contract, the Contractor shall notify the CO, GPOC, and Government Contract Administrator (CA) within one (1) business day of any damage to Government property in which the dollar value exceeds $500,000.00 and within two (2) work days, for any damage to Government property less than $500,000.00.
1.23.1 Mishap notifications shall contain, as a minimum, the following information:
• Contract, Contract Number, Name and Title of Person(s) Reporting
• Date, Time and exact location of accident/incident
• Brief Narrative of accident/incident (Events leading to accident/incident)
• Cause of accident/incident, if known
• Estimated cost of accident/incident (material and labor to repair/replace)
• Nomenclature of equipment and personnel involved in accident/incident
• Corrective actions (taken or proposed)
• Other pertinent information
1.23.2 If requested by the designated CO, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.
1.24 Combating Trafficking in Persons: IAW DFARS PGI 222.17, the GPOC shall pursue, as appropriate, the following methods of monitoring the Contractor’s performance regarding trafficking in persons such that non-compliances with FAR clause 52.222-50 are brought to the immediate attention of the Contracting Officer:
a. Keep the lines of communication open with the Contractor. At the Post-Award conference, remind the Contractor of his contractual responsibilities to notify the government if the Contractor receives notification of any alleged violations to this policy or if actions have been taken against the Contractor employees, subcontractor’s or subcontractor employees pursuant to the clause.
b. When appropriate, encourage Contractor to complete Human Trafficking Awareness Training.
c. Encourage the Contractor to take steps to investigate and eliminate slavery and human trafficking in their supply chains and to publish information for consumer awareness.
d. Periodically access the Department of State’s Trafficking in Person (TIP) website for updates and to view the latest reports. http://www.state.gov/g/tip
1.25 Speak Up for Safety: Safety surety is an integral part of our overall goal of establishing a world class safety and health program. Our “Speak Out for Safety” initiative ensures a partnership with contractors and government employees to further enhance safety to ensure we are looking out for all our partners and empowers all employees to actively participate in each other’s safety.
a. A safe workplace is everyone's business. As part of the contract team, military, civilian and contractor personnel are empowered to Speak Out for Safety (S.O.S.) when they observe an unsafe act.
b. Government personnel are empowered to intercede in events that pose imminent danger to personnel or catastrophic damage to property.
Section Two Reserved
Section Three
3.0 Government Furnished Property and Services
3.1 Government Furnished Property (GFP).
3.1.1 Government Property Repair/Maintenance (or Similar Requirement) On-Base.
Not Applicable.
3.1.2 GFP - Repair/Maintenance/Calibration Off-Base (same as Off-Site).
The Contractor shall ensure all GFP is secured at the close of each workday. The Government retains title to all GFP, until the Government properly disposes of the GFP as authorized by law or regulation. This GFP shall not be used for the performance of any other contract. The applicable Government Property contract clauses will be cited in the solicitation/contract. The GFP is identified in the Equipment list.
3.1.2.1 GFP Shipment to Contractor’s Facility. In accordance with PWS Section One.
3.1.2.2 GFP Return Shipment to Government. In accordance with PWS Section One.
3.1.2.3 Loss of Government Property. In accordance with the Government Property contract clauses.
3.1.2.4 GFP Identification Labels. When applicable, the Contractor shall clearly label (without damaging) GFP to distinguish it from Contractor Furnished Property IAW with the contract terms and conditions and this PWS.
3.2 Government Furnished Services (GFS).
Not Applicable.
3.3 Government Property Incidental to the Government Installation or Site.
Note: Formerly termed Shared Property of the Government.
Not Applicable.
3.4 Intangible Government Property.
Not Applicable.
3.5 Contractor Acquired Property (CAP), Time & Material (T&M), Labor Hour (LH), Cost (includes Travel) Contract Line Item Numbers (CLINS).
Not Applicable.
File details come from the government source that posted it. Updated .