Appendix I – UUT and Sub-Component Test Specifications

Rev C

T.O.’s

1. F101 MEC, 6J3-4-109-3

2. F108 MEC, 6J3-4-113-3

3. F110-100 MEC, 6J3-4-131-3

4. F110-129 MEC, 6J3-4-120-3

5. F118 MEC, 6J3-4-119-3

Distribution authorized to the Depart of Defense and U.S. DoD contractors only.

Tool and Fixture Information

All tools and fixturing required for testing subcomponents and full MEC assemblies shall be provided, however duplicates are not required. Nevertheless, the Contractor shall adopt a worst case scenario approach when analyzing the tooling/fixtures to be provided. For example, WT108031 is used on multiple MEC’s including the F101 and the F118, however only 1 is required for the F101 while 2 are required for the F118. Contractor shall provide a minimum of 2.

Nominal number of ‘WT’ MEC tools required: 105

Nominal number of ‘WT’ subcomponent tools required: 50

Note that all required tooling/fixtures do not necessarily have a ‘WT’ prefix. Other required tooling/fixtures may include items such as needle valves and regulators.

*Copies of the T.O.'s in Appendix I are available on request from the Contracting Officer upon receipt of the Contractor’s DD Form 2345 (Militarily Critical Technical Data Agreeement).

Information regarding the DD Form 2345 and certification for Contractor’s who wish to obtain access to unclassified technical data is available at http://www.disa.dla.mil/jcp http://www.disa.dla.mil/jcp