Amendment_0001.doc

DOC document 42 KB Posted

Attached to
Non-Destructive Inspection (NDI) Maintenance Support Federal contract opportunity
Solicitation number
FA8125-13-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Non-Destructive Inspection (NDI) Maintenance Support, newest first.
File Type Posted
NDI_PWS_-31_Oct_2012.doc DOC document
APPENDIX_C_11-77.pdf PDF
Wage_Determination_(13_June_12).pdf PDF
NDI_PWS_(04_Oct_2012).pdf PDF
Solicitation.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

The following items are applicable to this modification:

PWS REVISIONS

The purpose of this amendment is to incorporate a revised Performance Work Statement (PWS) dated 31 October 2012 and replaces the previous PWS dated 04 October 2012 in its entirety.

FIRST: Performance Work Statement (PWS) paragraph 1.5.6 has hereby been revised as seen below.

FROM: The contractor shall provide onsite (organic) probe repair capability with a turnaround time of no more than ten (10) working days. Probes that can not be organically repaired shall be repaired by an approved vendor with a turnaround time of no more than forty-five (45) working days.

TO: The contractor shall provide onsite (organic) probe repair capability with a turnaround time of no more than ten (10) working days. Probes that can not be organically repaired shall be repaired by an approved vendor with a turnaround time of no more than sixty (60) working days.

SECOND: Performance Work Statement (PWS) paragraph 1.9.1 has hereby been deleted in it’s entirety.

1.9.1 The contractor shall have the capability to perform upgrades at the request of the equipment listed in Appendix A. This requirement shall be a separate, unfunded CLIN until such time the CO/COR submits a request for proposal cost is negotiated by the CO and the contract modification is approved.

THIRD: The closing date for this solicitation is hereby extended as seen below.

FROM: 05 November 2012, 4pm CST

TO: 09 November 2012, 4pm CST

File details come from the government source that posted it. Updated .