CDRLs_F108_PMC.pdf

PDF 121 KB Posted

Attached to
F108 Power Management Control Federal contract opportunity
Solicitation number
FA812217R0017
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

F108 CDRLS

View the file

Other files for this federal contract opportunity

Other files attached to F108 Power Management Control, newest first.
File Type Posted
DID_DI_NDTI_80809B.pdf PDF
Transportation.pdf PDF
DID_DI_PSSS_81995.pdf PDF
DID_DI_MGMT_81324C.pdf PDF
DID_DI_MGMT_80503.pdf PDF
Packaging.pdf PDF
DID_DI_MGMT_81634C.pdf PDF
DID_DI_ALSS_81535.pdf PDF
PWS_F108_PMC.pdf PDF
BID_SHEET.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F108 / Power Management Control (PMC)

E. CONTRACT / PR NO.

FD20301600909

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Commercial Asset Visibility AF (CAV AF) End Item Reporting

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS/SOW

6. REQUIRING OFFICE

421 SCMS/GUMBA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 01 DEC 2015DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 421 SCMS/GUNA in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 848 SCMG/SRM, (405) 734-7171.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC)will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

OC-ALC 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

03 DEC 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SANTIAGO.LOURDES.1239719976

421 SCMS / GUMBA 405-734-3471 / 884-3471

J. DATE

03 DEC 2015

Page 1 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 29 Jun 2017

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F108 / Power Management Control (PMC)

E. CONTRACT / PR NO.

FD20301600909

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Production Report

3. SUBTITLE

N/A

4. AUTHORITY

DI-PSSS-81995

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMBA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

MTHLY

11. AS OF DATE

SEE BLOCK 16

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 02 DEC 2015DATE:

Manual Report:

Ref Block 11, 12, and 13

The report will be prepared using the TABLE I in DID DI-PSSS-81995 as of the last working day of the month and forwarded by email to Lourdes.Santiago@us.af.mil, or original mail service NLT the fifth working day of the month during which the contracts assets are received. Reports will continue to be forwarded unless terminated by the 421 SCMS/GUMBA Production Management Specialist (PMS). The last report will be annotated "Final Report".

Complete address for distribution:

421 SCMS/GUMBA

3001 Staff Drive, Suite 2AG1 105E Tinker AFB, OK 73145-3033

Commercial phone number: (405) 734-3471

Email preferred: Lourdes.Santiago@us.af.mil

CONTRACTOR FORMAT ACCEPTABLE UNLESS OTHERWISE DEFINED BY APPLICABLE DATA ITEM

DESCRIPTION (DID).

DID Requirements are NOT tailored.

Delivery CANNOT be deferred.

COORDINATORS:

421 SCMS/GUMBA 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

03 DEC 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SANTIAGO.LOURDES.1239719976

421 SCMS / GUMBA 405-734-3471 / 884-3471

J. DATE

03 DEC 2015

Page 2 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 29 Jun 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F108 / Power Management Control (PMC)

E. CONTRACT / PR NO.

FD20301600909

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Comprehensive Engine Management System (CEMS) Reporting

3. SUBTITLE

CEMS

4. AUTHORITY

DI-MGMT-81324C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LPZC CEMS PMO

7. DD 250 REQ

N/A

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 02 DEC 2015DATE:

Block D: NSN: 2915-01-139-6619PN and 2915-01-286-5565PN P/N ~ R/N: 7084M61G06 and 7157M61P06

Blocks: 10, 11, 12, & 13:

Contractor shall provide CEMS reporting for all Engines and/or Parts that have been identified as CEMS serially tracked items.

1. (U.S.) Contractor reporting responsibilities are described in T.O. 00-25-254-1 and update requirements are described in T.O. 00-25-254-2.

(a) CEMS reporting should be accomplished by contractor no later than Close of Business of the next business day following the date/time of the occurrence.

(b) Contractor shall obtain AF Portal and CEMS access. The contractor shall complete the forms required to obtain CEMS access per the New Contractor CEMS Access Process. All forms and instructions are located on the CEMS web page: https://my.af.mil/gimmsprod/cpmo/.

(c) Once access is granted, the contractor shall update all serially tracked assets whether repaired or new production into

CEMS.

(d) THE PRIME CONTRACTOR IS RESPONSIBLE FOR PROCESSING SECURITY INVESTIGATION

PACKAGES FOR SUBCONTRACTOR PERSONNEL.

2. (Foreign Military Sales) Contractor shall e-mail or fax an AF Form 1534 (CEMS CDB Report), or a spreadsheet with the pertinent data to CEMS.PMO.Helpdesk@us.af.mil for fax to 405-734- 3807. All forms and documents are located on the CEMS web page: https://my.af.mil/gimmsprod/cpmo/.

CII: LF10811 and LF08A11

COORDINATORS:

AFLCMC/LPZC

CEMS Program Management Office

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

03 DEC 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SANTIAGO.LOURDES.1239719976

421 SCMS / GUMBA 405-734-3471 / 884-3471

J. DATE

03 DEC 2015

Page 3 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 29 Jun 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F108 / Power Management Control (PMC)

E. CONTRACT / PR NO.

FD20301600909

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Deficiency Report (DR)

3. SUBTITLE

DR

4. AUTHORITY

DI-ALSS-81535

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMBA

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 17 OCT 2013DATE:

Block 11, 12, 13: As defined by T.O. 00-35D-54, submit a report whenever a material or quality deficiency occurs using SF 368 or equivalent.

Changes to office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

COORDINATORS:

421 SCMS/GUMBA 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

03 DEC 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SANTIAGO.LOURDES.1239719976

421 SCMS / GUMBA 405-734-3471 / 884-3471

J. DATE

03 DEC 2015

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F108 / Power Management Control (PMC)

E. CONTRACT / PR NO.

FD20301600909

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Test/Inspection Report

3. SUBTITLE

Test Report

4. AUTHORITY

DI-NDTI-80809B/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LPSEB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST

SUBMISSION

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 02 DEC 2015DATE:

Report:

Ref Block 10 - As Required Ref Block 12 - 5 Days After Test Completed

DI-NDTI-80809B/T is tailored as follows:

Title Changed to: "TEST REPORT" Change Para 3.1 to read: The test report is used to document test results, findings and analyses that will enable the government or contracting agency to evaluate compliance with system requirements and performance objectives.

Delete Para 7.2 & 7.3 Add to Para 10.1 Title: Format/Content. Electronic Submission is acceptable.

Para 10.2, 10.2.1, 10.2.2, 10.2.3, 10.2.3.1, Delete entirely.

AFLCMC/LPSEB(See Block 16)

0 1 0

0 1 015. TOTAL

Page 4 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 29 Jun 2017

Para 10.2.3.2 First Sentence, delete "inspected" Para 10.2.3.2 Delete sub-paragraphs d, f & g.

Para 10.2.3.3, 10.2.4 Delete all instances of the word "inspection" in both paragraphs.

Para 10.2.5 Delete all instances of the word "inspection" in the paragraph and delete sub-paragraph "d."

Para 10.2.6 through 10.2.8 are deleted entirely.

Ref Block 14 - Distribution e-mail Test Report to Patrick CdeBaca, Engineer at:

patrick.cdebaca@us.af.mil

AFLCMC/LPSEB

Attn: Patrick CdeBaca 3001 Staff Drive Tinker AFB, OK 73145 Telephone: (405) 734-5340

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

03 DEC 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SANTIAGO.LOURDES.1239719976

421 SCMS / GUMBA 405-734-3471 / 884-3471

J. DATE

03 DEC 2015

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F108 / Power Management Control (PMC)

E. CONTRACT / PR NO.

FD20301600909

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Report of Shipping (Item) and Packaging Discrepancy

3. SUBTITLE

SDR

4. AUTHORITY

DI-MGMT-80503

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMBA

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 12 NOV 2014DATE:

Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

Contractor will use WEBSDR to submit an electronic SF-364 (Standard Form) IAW TO 00-35D-54 upon discovery of discrepancies for items of supply received for: overage, wrong item, duplication of shipment, misdirected shipment, non-receipt, damage, and/or improperly packaged shipment. If the contractor submits a SF-364, Block 12 of the SF 364 must contain the following information for the missing items:

1.) NSN

2.) Part Number 3.) Nomenclature 4.) Quantity missing 5.) Price for part replacement to include all administrative and labor costs.

Additionally, all tags that accompanied the component, (i.e. shipping labels, repairable tags, and condition tags will be scanned and attached to the SDR/ROD request.

DCMA/QAR and/or Plant Clearance Officer must validate the discrepancy upon unpacking of the component. SDR/ROD must be submitted to the PCO/PMS within 48 hours of inventory receipt/induction.

BLOCK 11: With in 5 working days of discovery of discrepancy.

BLOCK 14: E-mail copies to addressees per attached Distribution Matrix. Report of Discrepancy shall be submitted to the material originator.

Note: It is permissible to submit paper SF 364s until access to WEBSDR is attained.

FOB DESTINATION

421 SCMS/GUMBA

3001 Staff Drive, Annex 4, Post: 2AG1-105E Tinker AFB, OK 73145-3033 Attn: Lourdes Santiago

0 1 0

0 1 015. TOTAL

Page 5 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 29 Jun 2017

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

03 DEC 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SANTIAGO.LOURDES.1239719976

421 SCMS / GUMBA 405-734-3471 / 884-3471

J. DATE

03 DEC 2015

Page 6 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 29 Jun 2017

File details come from the government source that posted it. Updated .