Redacted_J&A.pdf

PDF 90 KB Posted

Attached to
J85-21 T5 Amplifier Repair
Solicitation number
FA8122-17-R-0015
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUSTIFICATION FOR OTHER THAN

FULL AND OPEN COMPETITION

I. CONTRACTING ACTIVITY

United States Air Force

AFSC/PZA

3001 Staff Drive Tinker AFB, OK 73145

Purchase Request (PR): FD2030-17-00851

II. NATURE AND/OR DESCRIPTION OF THE ACTION BEING

PROCESSED

This individual Justification and Approval (J&A) authorizes the use of other than full and open competition procedures to award a firm-fixed price requirements type contract. The contemplated contract is for repair services with BAE Systems, Commercial and Government Entity (CAGE) code 63670. In accordance with FAR Part 16, a one-year basic contract with four, one-year options is considered to be appropriate for this acquisition. The estimated total value of this award is with an estimated award date of 30 Dec 17.

Previous Contract Number: N/A Date of Award: N/A Completion Date: N/A Basis of Award: Sole-Source

III. DESCRIPTION OF SUPPLIES/SERVICES REQUIRED TO MEET

AGENCY NEEDS

Under the contemplated contract, the contractor will provide repair services including check and test, minor repair, major repair, and any over and above work required to overhaul Digital Electronic Amplifiers to support the J85-21 engine.

Contract Summary

Estimated Dates Estimated Dollars Basic Dec 17-Dec 18

Option I Dec 18-Dec 19 Option II Dec 19-Dec 20 Option III Dec 20-Dec 21

Option IV Dec 21-Dec 22 Total Contract Dec 17 – Dec 22

PR line item 0001

Check and Test of NSN: 5996-01-469-5696OK P/N: 101E9880G01 Noun: Amplifier, Electronic Application: F-5 Navy with J85-21 Engine Item description and function: 12 inches long X 6 inches wide X 3 inches high, weighing 10 lbs., and composed of aluminum case solid state circut. This item controls the hydromechanical nozzle system.

Type of appropriation: 97X4930 Total estimated dollars for PR line item 0001:

Year Qty Unit Price Estimated Dollars

Period of

Performance Basic Dec 17-Dec 18 Option 1 Dec 18-Dec 19 Option 2 Dec 19-Dec 20 Option 3 Dec 20-Dec 21 Option 4 Dec 21-Dec 22 Total Dec 17 – Dec 22

PR line item 0002

Minor Repair of NSN: 5996-01-469-5696OK P/N: 101E9880G01 Noun: Amplifier, Electronic Application: F-5 Navy with J85-21 Engine Item description and function:12 inches long X 6 inches widw X 3 inches high, weighing 10 lbs., and composed of aluminum case solid state circuit. This item controls the hydromechanical nozzle system.

Type of appropriation: 97X4930 Total estimated dollars for PR line item 0002:

Contractor shall perform minor repair for units that do not require extensive repair. The minor repair is about 40% of the total repair.

Year Qty Unit Price Estimated

Dollars

Period of

Performance Basic Dec 17-Dec 18 Option 1 Dec 18-Dec 19 Option 2 Dec 19-Dec 20 Option 3 Dec 20-Dec 21 Option 4 Dec 21-Dec 22 Total Dec 17 – Dec 22

PR line item 0003

Major Repair of NSN: 5996-01-469-5696OK P/N: 101E9880G01 Noun: Amplifier, Electronic Application: F-5 Navy with J85-21 Engine Item description and function:12 inches long X 6 inches wide X 3 inches high, weighing 10 lbs., and composed of aluminum case solid state circuit. This item controls the hydromechanical nozzle system.

Type Appropriation: 97X4930 Total estimated dollars for PR line item 0003:

Contractor shall perform major repair for units that require more extensive repair.

The major repair is about 60% of the total repair.

Qty Unit Price

Estimated Dollars

Period of Performance

Basic Dec 17-Dec 18 Option 1 Dec 18-Dec 19 Option 2 Dec 19-Dec 20 Option 3 Dec 20-Dec 21 Option 4 Dec 21-Dec 22 Total Dec 17 – Dec 22

PR line item 0004

Contract Data Line Item Report (CDRL): Commercial Asset Visibility Air Force (CAV AF) Statement of Work

Not Separately Priced (NSP)

PR line item 0005

Over and Above

Over and Above is work discovered during the course of performing overhaul, maintenance, and repair efforts that is:

(i) Within the general scope of the contract;

(ii) Not covered by the line item(s) for the basic work under the contract; and

(iii) Necessary in order to satisfactorily complete the contract

Type Appropriation: 97X4930 Total estimated dollars for PR line item 0005:

CLIN 0005 Over & Above

BEQ Est. Unit Price Total Est. Price

Basic Option Year 1 Option Year 2 Option Year 3 Option Year 4 Total

IV. STATUTORY AUTHORITY PERMITTING OTHER THAN FULL

AND OPEN COMPETITION

10 U.S.C.2304(c)(1), as implemented by FAR 6.302-1.

V. DEMONSTRATION THAT THE CONTRACTOR'S UNIQUE

QUALIFICATIONS OR NATURE OF THE ACQUISITION

REQUIRES THE USE OF THE AUTHORITY CITED ABOVE

(APPLICABILITY OF AUTHORITY)

This item, CAGE 89954 (BAE Systems) part number 101E9880G01, is source controlled for manufacture under General Electric, CAGE 99207 drawing 5071T08P01. J85 Engineering conducted a search for overhaul instructions for this item and found none to exist and no contract repair history. There is no tech data available for this item which supports/used on J85-GE-21 engine models. Tech data for this item is proprietary to Original Equipment Manufacturer (OEM). The BAE Systems division CAGE 63670 was found to be the current repair source as of late 2016. A telephone discussion between the Air Force's engineering, item management, production, program and management personnel was held 5 Dec 16 with , Principal Contracts Administrator and his staff to discuss repair and data history of this item and to discuss possible contracting methods. stated that no outside repair sources had ever been licensed by CAGE 63670.The manufacturer has never released tech data for repair.

The turbine discharge temperature sensing system controls nozzle area to prevent excessive TS temperatures and prevent compressor stall at ambient temperatures below -2°F. This sensing system can override the power lever setting to control nozzle area. The amplifier compares temperatures to a preset reference temperature on a standard day. The amplifier compares the TS temperature and the reference temperature. If a temperature error is sensed, the amplifier will operate the TS motor, which can override the power lever cam and open the nozzle.

The check and test for Digital Electronic Amplifier is required before repairing the J85-21 engine used by F-5 Navy aircraft . The quantity repair is based on the Air Force requirements each quarter including the Navy Requirement Data Exchange List (RDEL) of per quarter.

Contractor shall perform check and test, and if unit fails, all necessary repairs will be performed to return to serviceable condition, and if found serviceable, return serviceable units back to the USAF.

Currently, BAE Systems, is the only known source that can satisfy the Government’s requirement. There are no commercial alternatives. The cognizant engineering activity has determined that data to define and control reliability limits cannot be obtained nor is it possible to draft adequate specifications for this purpose and verified that BAE is the only repair source for this item.

421 SCMS believes that award to any other source would result in unacceptable delays in fulfilling the Air Force’s requirement in the repair of J85-21 engines and the availability of aircraft supported by the J85-21 engine. It is imperative that these parts are readily available to ensure that the requirements of the Air Force are met.

Accordingly, BAE Systems is the only responsible source capable of providing the items described in Section III above.

VI. DESCRIPTION OF EFFORTS MADE TO ENSURE THAT OFFERS

ARE SOLICITED FROM AS MANY POTENTIAL SOURCES AS

PRACTICABLE

In accordance with FAR 5.201, this requirement shall be synopsized and the Request for Proposal will be posted to the Federal Business Opportunities website. The Government does not have qualification requirements as the OEM approves additional sources.

VII. DETERMINATION BY THE CONTRACTING OFFICER THAT THE

ANTICIPATED COST TO THE GOVERNMENT WILL BE FAIR

AND REASONABLE

The Contracting Officer will ensure that the items described herein are negotiated at a fair and reasonable price to the Government. A detailed cost and price analysis will be accomplished. The Defense Contracting Management Agency and/or Defense Contract Audit Agency may be contacted to assist with the analysis, and may assist with inputs throughout the life of the contract.

VIII. DESCRIPTION OF THE MARKET RESEARCH CONDUCTED AND

THE RESULTS, OR A STATEMENT OF THE REASONS MARKET

RESEARCH WAS NOT CONDUCTED

As described in sectionVI above, market research, in accordance with FAR Part 10, will be conducted by synopsis of the proposed acquisition advising industry of the pending acquisition and soliciting inquiries from interested parties. Initial market research was accomplished on 7 Mar 17. The research confirmed that there is only one approved source to repair this part. Further, the requirement cannot be modified and be satisfied with a commercial or a modified commercial item. This is a non-developmental item.

This item is unique to J85 military engine.

A Sources Sought Synopsis was also conducted during the market research effort as this requirement was synopsized in Federal Business Opportunities (FedBizOpps) as a notice of contract action IAW FAR 5.201. The synopsis was posted 6 Feb 17 on the FedBizOpps website under FD2030-17-00851 with a response date of 6 Mar 17. No responses were received.

Based on the above, a high level of confidence exists that BAE Systems is currently the only responsible source able to fulfill the requirements.

described in section III.

IX. ANY OTHER FACTS SUPPORTING THE USE OF OTHER THAN

FULL AND OPEN COMPETITION

The Government does not have the capability to qualify a source for this repair due to lack of source qualification data. To the Government’s knowledge, the OEM has not received any requests to qualify additional repair sources for this item.

X. LIST OF SOURCES, IF ANY, THAT EXPRESSED INTEREST IN

THE ACQUISITION

BAE Systems CAGE: 63670

Repair Station 4250 Airport Expessway

Forth Wayne, IN 46809 260-434-5000

XI. A STATEMENT OF THE ACTIONS, IF ANY, THE AGENCY MAY

TAKE TO REMOVE OR OVERCOME ANY BARRIERS TO

COMPETITION BEFORE MAKING SUBSEQUENT ACQUISITIONS

FOR THE SUPPLIES OR SERVICES REQUIRED

The 421 SCMS will continue to monitor the marketplace for repair source development, and will continue discussions with the OEM regarding additional approved sources. The Government will continue to synopsize the requirement and re-screen the item, and attempt to acquire the data necessary to qualify additional sources.

XII. CONTRACTING OFFICER’S CERTIFICATION

The Contracting Officer’s signature on the coordination and approval document evidences that Contracting Officer has determined this document to be both accurate and complete to the best of the Contracting Officer’s knowledge and belief.

XIII. TECHNICAL/REQUIREMENTS PERSONNEL’S CERTIFICATION

As evidenced by their signatures on the coordination and approval document, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete.

CAD_Redacted
JA 17-00851 Final
FULL AND OPEN COMPETITION
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority)

File details come from the government source that posted it.