2173158_CDRL1_REPORT.pdf

PDF 168 KB Posted

Attached to
29-SPRAY RING ASSEMBLY
Solicitation number
FA8121-18-R-0012
Issued by

About this file

CDRL

View the file

Other files

File Type Posted
CDM_DID_Report_Page.pdf PDF
CAV_AF_SOW.pdf PDF
DID_2173310_ATTACH.pdf PDF
GFP_2193544_ATTACH.pdf PDF
DID_2173307_ATTACH.pdf PDF
2210716_PWS.pdf PDF
WageDetermination20154848.pdf PDF
DID_2173313_ATTACH.pdf PDF
2193548_TRNSPDATA_REPORT.pdf PDF
2193549_PKGRQMT_REPORT.pdf PDF
Special_Pkg_Instruction_2193708_ATTACH.pdf PDF
FA812118R0012_______0001.pdf PDF
DID_81634C.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Commercial Asset Visibility AF (CAV AF) End Item Reporting

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS/SOW

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 06 OCT 2016DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/SRM in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 848 SCMG/SRM, (405) 736-7171.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

OC-ALC 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

Page 1 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 Jun 2017

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Production Report

3. SUBTITLE

CDM

4. AUTHORITY

DI-PSSS-81995

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

MTHLY

11. AS OF DATE

SEE BLOCK 16

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 14 FEB 2017DATE:

Manual Report:

Ref Block 11, 12, and 13

The report will be prepared using the TABLE I in DID DI-PSSS-81995 as of the last working day of the month and forwarded by email to Tommy.Sneed@us.af.mil, or original mail service NLT the fifth working day of the month during which the contracts assets are received. Reports will continue to be forwarded unless terminated by the 421 SCMS/GUMAB Production Management Specialist (PMS). The last report will be annotated "Final Report".

Complete address for distribution:

421 SCMS/GUMAB

3001 Staff Drive, Annex 4, Suite 1AE2 115 Tinker AFB, OK 73145 Commercial phone number (405)-734-5446

Email preferred: Tommy.Sneed@us.af.mil

CONTRACTOR FORMAT ACCEPTABLE UNLESS OTHERWISE DEFINED BY APPLICABLE DATA ITEM

DESCRIPTION (DID).

DID Requirements are NOT tailored.

Delivery CANNOT be deferred.

COORDINATORS:

421 SCMS/GUMAB 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

Page 2 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 Jun 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Technical Order Improvement Report and Reply

3. SUBTITLE

AFTO Form 22

4. AUTHORITY

DI-TMSS-80229D

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

As Required

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 31 AUG 2016DATE:

Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

This report shall be submitted IAW TO 00-5-1 using AFTO 22 for Air Force TOs. The contractor shall report when an error or improvement changes the meaning of the instructions or information contained in the technical directives where it may prevent mission performance. Also, this report shall be used by the contractor to indicate omissions of pertinent overhaul procedures in TOs or desired changes to TO date.

COORDINATORS:

421 SCMS/GUMAB

3001 Staff Drive Tinker AFB, OK 73145-3041

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

Page 3 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 Jun 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Deficiency Report (DR)

3. SUBTITLE

DR

4. AUTHORITY

DI-PSSS-81535A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 22 SEP 2016DATE:

Blocks 10, 11, 12, and 13: As defined by T.O. 00-35D-54, submit a report whenever a material or quality deficiency occurs using SF 368 or equivalent.

Changes to office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

COORDINATORS:

421 SCMS/GUMAB 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

B001

2. TITLE OF DATA ITEM

Commercial Asset Visibility AF (CAV AF) End Item Reporting

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS/SOW

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 06 OCT 2016DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/SRM in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 848 SCMG/SRM, (405) 736-7171.

OC-ALC 0 1 0

0 1 015. TOTAL

Page 4 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 Jun 2017

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

B002

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Production Report

3. SUBTITLE

CDM

4. AUTHORITY

DI-PSSS-81995

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

MTHLY

11. AS OF DATE

SEE BLOCK 16

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 14 FEB 2017DATE:

Manual Report:

Ref Block 11, 12, and 13

The report will be prepared using the TABLE I in DID DI-PSSS-81995 as of the last working day of the month and forwarded by email to Tommy.Sneed@us.af.mil, or original mail service NLT the fifth working day of the month during which the contracts assets are received. Reports will continue to be forwarded unless terminated by the 421 SCMS/GUMAB Production Management Specialist (PMS). The last report will be annotated "Final Report".

Complete address for distribution:

421 SCMS/GUMAB

3001 Staff Drive, Annex 4, Suite 1AE2 115 Tinker AFB, OK 73145 Commercial phone number (405)-734-5446

Email preferred: Tommy.Sneed@us.af.mil

CONTRACTOR FORMAT ACCEPTABLE UNLESS OTHERWISE DEFINED BY APPLICABLE DATA ITEM

DESCRIPTION (DID).

DID Requirements are NOT tailored.

Delivery CANNOT be deferred.

COORDINATORS:

421 SCMS/GUMAB 0 1 0

0 1 015. TOTAL

Page 5 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 Jun 2017

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

B003

2. TITLE OF DATA ITEM

Technical Order Improvement Report and Reply

3. SUBTITLE

AFTO Form 22

4. AUTHORITY

DI-TMSS-80229D

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

As Required

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 31 AUG 2016DATE:

Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

This report shall be submitted IAW TO 00-5-1 using AFTO 22 for Air Force TOs. The contractor shall report when an error or improvement changes the meaning of the instructions or information contained in the technical directives where it may prevent mission performance. Also, this report shall be used by the contractor to indicate omissions of pertinent overhaul procedures in TOs or desired changes to TO date.

COORDINATORS:

421 SCMS/GUMAB

3001 Staff Drive Tinker AFB, OK 73145-3041

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

Page 6 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 Jun 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

B004

2. TITLE OF DATA ITEM

Deficiency Report (DR)

3. SUBTITLE

DR

4. AUTHORITY

DI-PSSS-81535A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 22 SEP 2016DATE:

Blocks 10, 11, 12, and 13: As defined by T.O. 00-35D-54, submit a report whenever a material or quality deficiency occurs using SF 368 or equivalent.

Changes to office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

COORDINATORS:

421 SCMS/GUMAB 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

C001

2. TITLE OF DATA ITEM

Commercial Asset Visibility AF (CAV AF) End Item Reporting

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS/SOW

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 06 OCT 2016DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/SRM in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 848 SCMG/SRM, (405) 736-7171.

OC-ALC 0 1 0

0 1 015. TOTAL

Page 7 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 Jun 2017

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

C002

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Production Report

3. SUBTITLE

CDM

4. AUTHORITY

DI-PSSS-81995

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

MTHLY

11. AS OF DATE

SEE BLOCK 16

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 14 FEB 2017DATE:

Manual Report:

Ref Block 11, 12, and 13

The report will be prepared using the TABLE I in DID DI-PSSS-81995 as of the last working day of the month and forwarded by email to Tommy.Sneed@us.af.mil, or original mail service NLT the fifth working day of the month during which the contracts assets are received. Reports will continue to be forwarded unless terminated by the 421 SCMS/GUMAB Production Management Specialist (PMS). The last report will be annotated "Final Report".

Complete address for distribution:

421 SCMS/GUMAB

3001 Staff Drive, Annex 4, Suite 1AE2 115 Tinker AFB, OK 73145 Commercial phone number (405)-734-5446

Email preferred: Tommy.Sneed@us.af.mil

CONTRACTOR FORMAT ACCEPTABLE UNLESS OTHERWISE DEFINED BY APPLICABLE DATA ITEM

DESCRIPTION (DID).

DID Requirements are NOT tailored.

Delivery CANNOT be deferred.

COORDINATORS:

421 SCMS/GUMAB 0 1 0

0 1 015. TOTAL

Page 8 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 Jun 2017

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

C003

2. TITLE OF DATA ITEM

Technical Order Improvement Report and Reply

3. SUBTITLE

AFTO Form 22

4. AUTHORITY

DI-TMSS-80229D

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

As Required

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 31 AUG 2016DATE:

Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

This report shall be submitted IAW TO 00-5-1 using AFTO 22 for Air Force TOs. The contractor shall report when an error or improvement changes the meaning of the instructions or information contained in the technical directives where it may prevent mission performance. Also, this report shall be used by the contractor to indicate omissions of pertinent overhaul procedures in TOs or desired changes to TO date.

COORDINATORS:

421 SCMS/GUMAB

3001 Staff Drive Tinker AFB, OK 73145-3041

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

Page 9 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 Jun 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

C004

2. TITLE OF DATA ITEM

Deficiency Report (DR)

3. SUBTITLE

DR

4. AUTHORITY

DI-PSSS-81535A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 22 SEP 2016DATE:

Blocks 10, 11, 12, and 13: As defined by T.O. 00-35D-54, submit a report whenever a material or quality deficiency occurs using SF 368 or equivalent.

Changes to office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

COORDINATORS:

421 SCMS/GUMAB 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

D001

2. TITLE OF DATA ITEM

Commercial Asset Visibility AF (CAV AF) End Item Reporting

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS/SOW

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 06 OCT 2016DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/SRM in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 848 SCMG/SRM, (405) 736-7171.

OC-ALC 0 1 0

0 1 015. TOTAL

Page 10 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 Jun 2017

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

D002

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Production Report

3. SUBTITLE

CDM

4. AUTHORITY

DI-PSSS-81995

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

MTHLY

11. AS OF DATE

SEE BLOCK 16

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 14 FEB 2017DATE:

Manual Report:

Ref Block 11, 12, and 13

The report will be prepared using the TABLE I in DID DI-PSSS-81995 as of the last working day of the month and forwarded by email to Tommy.Sneed@us.af.mil, or original mail service NLT the fifth working day of the month during which the contracts assets are received. Reports will continue to be forwarded unless terminated by the 421 SCMS/GUMAB Production Management Specialist (PMS). The last report will be annotated "Final Report".

Complete address for distribution:

421 SCMS/GUMAB

3001 Staff Drive, Annex 4, Suite 1AE2 115 Tinker AFB, OK 73145 Commercial phone number (405)-734-5446

Email preferred: Tommy.Sneed@us.af.mil

CONTRACTOR FORMAT ACCEPTABLE UNLESS OTHERWISE DEFINED BY APPLICABLE DATA ITEM

DESCRIPTION (DID).

DID Requirements are NOT tailored.

Delivery CANNOT be deferred.

COORDINATORS:

421 SCMS/GUMAB 0 1 0

0 1 015. TOTAL

Page 11 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 Jun 2017

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

D003

2. TITLE OF DATA ITEM

Technical Order Improvement Report and Reply

3. SUBTITLE

AFTO Form 22

4. AUTHORITY

DI-TMSS-80229D

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

As Required

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 31 AUG 2016DATE:

Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

This report shall be submitted IAW TO 00-5-1 using AFTO 22 for Air Force TOs. The contractor shall report when an error or improvement changes the meaning of the instructions or information contained in the technical directives where it may prevent mission performance. Also, this report shall be used by the contractor to indicate omissions of pertinent overhaul procedures in TOs or desired changes to TO date.

COORDINATORS:

421 SCMS/GUMAB

3001 Staff Drive Tinker AFB, OK 73145-3041

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

Page 12 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 Jun 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

D004

2. TITLE OF DATA ITEM

Deficiency Report (DR)

3. SUBTITLE

DR

4. AUTHORITY

DI-PSSS-81535A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 22 SEP 2016DATE:

Blocks 10, 11, 12, and 13: As defined by T.O. 00-35D-54, submit a report whenever a material or quality deficiency occurs using SF 368 or equivalent.

Changes to office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

COORDINATORS:

421 SCMS/GUMAB 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

E001

2. TITLE OF DATA ITEM

Commercial Asset Visibility AF (CAV AF) End Item Reporting

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS/SOW

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 06 OCT 2016DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/SRM in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 848 SCMG/SRM, (405) 736-7171.

OC-ALC 0 1 0

0 1 015. TOTAL

Page 13 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 Jun 2017

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

E002

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Production Report

3. SUBTITLE

CDM

4. AUTHORITY

DI-PSSS-81995

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

MTHLY

11. AS OF DATE

SEE BLOCK 16

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 14 FEB 2017DATE:

Manual Report:

Ref Block 11, 12, and 13

The report will be prepared using the TABLE I in DID DI-PSSS-81995 as of the last working day of the month and forwarded by email to Tommy.Sneed@us.af.mil, or original mail service NLT the fifth working day of the month during which the contracts assets are received. Reports will continue to be forwarded unless terminated by the 421 SCMS/GUMAB Production Management Specialist (PMS). The last report will be annotated "Final Report".

Complete address for distribution:

421 SCMS/GUMAB

3001 Staff Drive, Annex 4, Suite 1AE2 115 Tinker AFB, OK 73145 Commercial phone number (405)-734-5446

Email preferred: Tommy.Sneed@us.af.mil

CONTRACTOR FORMAT ACCEPTABLE UNLESS OTHERWISE DEFINED BY APPLICABLE DATA ITEM

DESCRIPTION (DID).

DID Requirements are NOT tailored.

Delivery CANNOT be deferred.

COORDINATORS:

421 SCMS/GUMAB 0 1 0

0 1 015. TOTAL

Page 14 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 Jun 2017

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

E003

2. TITLE OF DATA ITEM

Technical Order Improvement Report and Reply

3. SUBTITLE

AFTO Form 22

4. AUTHORITY

DI-TMSS-80229D

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

As Required

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 31 AUG 2016DATE:

Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

This report shall be submitted IAW TO 00-5-1 using AFTO 22 for Air Force TOs. The contractor shall report when an error or improvement changes the meaning of the instructions or information contained in the technical directives where it may prevent mission performance. Also, this report shall be used by the contractor to indicate omissions of pertinent overhaul procedures in TOs or desired changes to TO date.

COORDINATORS:

421 SCMS/GUMAB

3001 Staff Drive Tinker AFB, OK 73145-3041

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

Page 15 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 Jun 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220 / Multiple Items

E. CONTRACT / PR NO.

FD20301701063

F. CONTRACTOR

1. DATA ITEM NO.

E004

2. TITLE OF DATA ITEM

Deficiency Report (DR)

3. SUBTITLE

DR

4. AUTHORITY

DI-PSSS-81535A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 22 SEP 2016DATE:

Blocks 10, 11, 12, and 13: As defined by T.O. 00-35D-54, submit a report whenever a material or quality deficiency occurs using SF 368 or equivalent.

Changes to office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

COORDINATORS:

421 SCMS/GUMAB 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

14 FEB 2017

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-8720 / 884-8720

J. DATE

14 FEB 2017

Page 16 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 Jun 2017

File details come from the government source that posted it.