CDRL_Report.pdf
PDF 29 KB Posted
- Attached to
- B-2 Duct Assembly/Exhaust Pipe Repair/Overhaul
- Solicitation number
- FA8119-15-R-0026
About this file
CDRL Report
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Redacted_J_and_A_for_B-2_Tailpipe_Repair.pdf | ||
| FA811915R0026_______0002.pdf | ||
| FA8119-15-R-0026-0001_Duct_Assembly_Requirement.pdf | ||
| FA811915R0026.pdf | ||
| DID_1548731.pdf | ||
| Special_Packaging_Instructions_01-373-5098.doc | DOC document | |
| DID_1548730.pdf | ||
| DID_1548729.pdf | ||
| FA811915R0026.pdf | ||
| Packaging_Report.pdf | ||
| DID_1548728.pdf | ||
| CAV_AF.docx | DOCX document | |
| DID_1548732.pdf | ||
| Special_Packaging_Instructions_01-373-6464.doc | DOC document | |
| DID_1548735.pdf | ||
| DID_1548734.pdf | ||
| Special_Packaging_Instructions_01-373-9915.doc | DOC document | |
| DID_1548726.pdf | ||
| DID_1548725.pdf | ||
| Transport_Data.pdf | ||
| Performance_Work_Statement.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of12 8
FD20301500509B-2 / Duct Assembly
A001
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Commercial Asset Visibility AF (CAV AF) End Item Reporting CAV AF
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MGMT-81634B PWS/SOW 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A N/A
11. As of Date: 13. Date of Subsequent Submission:
See Block 16
See Block 16
See Block 16
a. Addressee:
b. Copies:
Final
Draft Reg Repro See Block 16
G. Prepared By: H. Date I. Approved By: J. Date:
OC-ALC 0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 02 FEB 2015
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNA in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.
Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training is provided by 848 SCMS/SRM, (405) 734-7171.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
Cook, Sara C
429 SCMS / GUMAA
405-622-7313
13 MAR 2015 //DIGITALLY SIGNED//
COORDINATORS:
429 SCMS / GUMAA
COOK.SARA.C.1123669475
405-622-7313 / 892-7313
12 MAR 2015
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of22 8
A002
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
End Item (EI) Production and Component Item (C/I) Consumption Repair History Data
N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-ALSS-81220A/T PWS 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A A
11. As of Date: 13. Date of Subsequent Submission:
As Required
N/A
QRTLY
a. Addressee:
b. Copies:
Final
Draft Reg Repro See Block 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME
3001 Staff Drive Tinker AFB, OK 73145-3041 Attn: Matthew D. Starzenski
0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 12 MAR 2015
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION
UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL
BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA
REPORTS.
BLOCK 11: TO BE DETERMINED
BLOCK 12: TO BE SUBMITTED WITH THE LAST DELIVERABLE
BLOCK 14: EMAIL COPIES OF REPORT TO: Matthew.Starzenski@us.af.mil
THIS DID IS TAILORED AS FOLLOWS:
PARA 10.2, 10.3, 10.3.2, 10.4, 10.4.1, 10.4.2: DOES NOT APPLY
10.3.1: REVISED AND REPLACED AS FOLLOWS: EACH ITEM REMANUFACTURED WILL
REQUIRE A PRODUCTION RECORD WITH A CONSUMPTION RECORD WHICH LISTS
ALL MATERIAL INCLUDING NOMENCLATURE, PART NUMBER, QUANTITY AND THE
USAGE RATE.
CONTRACTOR FORMAT IS ACCEPTABLE.
DELIVERY CANNOT BE DEFERRED
Cook, Sara C
429 SCMS / GUMAA
405-622-7313
13 MAR 2015 //DIGITALLY SIGNED//
COORDINATORS:
429 SCMS / GUMAA
COOK.SARA.C.1123669475
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of32 8
A003
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Conference Agenda N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-ADMN-81249A PWS 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A D
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
MTHLY
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
424 SCMS/GUME
3001 Staff Drive Tinker AFB, OK 73145 Attn: Matthew D. Starzenski
0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 12 MAR 2015
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION
UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL
BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA
REPORTS.
BLOCK 9: DISTRIBUTION STATEMENT "D" DISTRIBUTION AUTHORIZED TO
DEPARTMENT OF DEFENSE (DOD) AND DOD CONTRACTORS FOR ADMINISTRATIVE
OR OPERATIONAL USE. OTHER REQUESTS FOR A COPY OF THIS DOCUMENT SHALL
BE REFERRED TO 424 SCMS/GUME.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751 ET
SEQ.) OR EXECUTIVE ORDER 12470. VIOLATIONS OF THESE EXPORT LAWS ARE
SUBJECT TO SEVERE CRIMINAL PENALTIES.
THE ABOVE DISTRIBUTION STATEMENT AND WARNING NOTICE SHALL BE
DISPLAYED OR AFFIXED TO THE DATA IN A CONSPICUOUS POSITION.
BLOCK 11: TO BE DETERMINED
BLOCK 12: ONCE MEETING/REVIEWS ARE SCHEDULED. CONTRACTOR TO PROVIDE
AGENDA WITHIN 5 DAYS OF EVENT.
BLOCK 13: TO BE DETERMINED
BLOCK 14: ALL DIGITAL SUBMISSIONS SHALL BE MADE VIA SECURE ELETRONIC
MAIL TO: Matthew.Starzenski@us.af.mil
DATA SHALL BE SUBMITTED IN ELECTRONIC FORMAT, IN MICROSOFT ® OFFICE
PRODUCT SUITE AND/OR ADOBE ® ACROBAT PORTABLE DOCUMENT FORMAT (PDF)
OR DELIVERED AS HARD COPIES TO THE PCO.
CONTRACTOR FORMAT IS ACCEPTABLE.
DID REQUIREMENTS ARE NOT TAILORED.
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of42 8
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
G. Prepared By: H. Date I. Approved By: J. Date:
16. Remarks:
DELIVERY CANNOT BE DEFERRED.
Cook, Sara C
429 SCMS / GUMAA
405-622-7313
13 MAR 2015 //DIGITALLY SIGNED//
COORDINATORS:
429 SCMS / GUMAA
COOK.SARA.C.1123669475
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of52 8
A004
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Presentation Material N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-ADMN-81373 PWS 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A A
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
MTHLY
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME
3001 Staff Drive Tinker AFB, OK 73145 Attn: Matthew D. Starzenski
0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 12 MAR 2015
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION
UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL
BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA
REPORTS.
Control Warning Notice: Warning-This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, as amended, Title 50, USC, App 240 I Et Seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.
Destruction Notice for Unclassified/Limited documents: destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Blk 11: TO BE DETERMINED
Blk 12: ONCE MEETINGS/REVIEWS ARE SCHEDULED, CONTRACTOR TO PROVIDE
PRESENTATION MATERIAL WITHIN 5 DAYS OF EVENT.
Blk 13: TO BE DETERMINED
Blk 14: Deliveries shall be submitted as web accessible documents.
CONTRACTOR FORMAT IS ACCEPTABLE.
DID REQUIREMENTS ARE NOT TAILORED.
DELIVERY CANNOT BE DEFERRED.
Cook, Sara C
429 SCMS / GUMAA
405-622-7313
13 MAR 2015 //DIGITALLY SIGNED//
COORDINATORS:
429 SCMS / GUMAA
COOK.SARA.C.1123669475
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of62 8
A005
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Conference Minutes N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-ADMN-81250A PWS 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A D
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
MTHLY
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
424 SCMS/GUME
3001 Staff Drive Tinker AFB, OK 73145 Attn: Matthew D. Starzenski
0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 12 MAR 2015
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION
UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL
BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA
REPORTS.
BLOCK 9: DISTRIBUTION STATEMENT "D" DISTRIBUTION AUTHORIZED TO
DEPARTMENT OF DEFENSE (DOD) AND DOD CONTRACTORS FOR ADMINISTRATIVE
OR OPERATIONAL USE DETERMINED. OTHER REQUESTS FOR A COPY OF THIS
DOCUMENT SHALL BE REFERRED TO 424 SCMS/GUME.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751 ET
SEQ.) OR EXECUTIVE ORDER 12470. VIOLATIONS OF THESE EXPORT LAWS ARE
SUBJECT TO SEVERE CRIMINAL PENALTIES.
THE ABOVE DISTRIBUTION STATEMENT AND WARNING NOTICE SHALL BE
DISPLAYED OR AFFIXED TO THE DATA IN A CONSPICUOUS POSITION.
BLOCK 10: TO BE DETERMINED
BLOCK 11: TO BE DETERMINED
BLOCK 12: ONCE MEETINGS/REVIEWS ARE SCHEDULED, CONTRACTOR TO PROVIDE
PRESENTATION MATERIAL WITHIN 5 DAYS OF EVENT.
BLOCK 13: TO BE DETERMINED
BLOCK 14A: ALL DIGITAL SUBMISSIONS SHALL BE MADE VIA SECURE ELECTRONIC
MAIL TO: Matthew.Starzenski@us.af.mil
DATA SHALL BE SUBMMITTED IN ELECTRONIC FORMAT, IN MICROSOFT ® OFFICE
PRODUCT SUITE AND/OR ADOBE ® ACROBAT PORTABLE DOCUMENT FORMAT (PDF)
OR DELIVERED AS HARD COPIES TO THE PCO.
Contractor Format Acceptable
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of72 8
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
G. Prepared By: H. Date I. Approved By: J. Date:
16. Remarks:
DID Requirements not tailored.
Delivery cannot be deferred.
Cook, Sara C
429 SCMS / GUMAA
405-622-7313
13 MAR 2015 //DIGITALLY SIGNED//
COORDINATORS:
429 SCMS / GUMAA
COOK.SARA.C.1123669475
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of82 8
A006
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Source Data For Forecasting Diminishing Manufacturing Sources And Material Shortages (DMSMS)
N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-SESS-81656A PWS 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A D
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
QRTLY
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME
3001 Staff Drive Tinker AFB, OK 73145 Attn: Matthew D. Starzenski
0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 12 MAR 2015
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION
UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL
BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA
REPORTS.
Blocks 11-13: TO BE DETERIMINED
BLOCK 14A: ALL DIGITAL SUBMISSIONS SHALL BE MADE VIA SECURE ELECTRONIC
MAIL TO: Matthew.Starzenski@us.af.mil 3001 Staff Drive Tinker AFB, OK Attn: Matthew D. Starzenski
Email: Matthew.Starzinski@us.af.mil
CONTRACTOR FORMAT IS ACCEPTABLE.
DID REQUIREMENTS ARE NOT TAILORED.
DELIVERY CANNOT BE DEFERRED.
Cook, Sara C
429 SCMS / GUMAA
405-622-7313
13 MAR 2015 //DIGITALLY SIGNED//
COORDINATORS:
429 SCMS / GUMAA
COOK.SARA.C.1123669475
File details come from the government source that posted it. Updated .