989310_CDRL1_REPORT.pdf

PDF 48 KB Posted

Attached to
Overhaul of B-52 Bypass Ducts (Multiple NSNs)
Solicitation number
FA8119-14-R-0006
Issued by

About this file

CDRLs

View the file

Other files

File Type Posted
PWS_10112013.doc DOC document
DID_81634B.pdf PDF
QASP.doc DOC document
987909_PKGRQMT_REPORT.pdf PDF
Vendor_Packaging_Inst.pdf PDF
SPI_00-795-4375.doc DOC document
vendor_tran_inst.doc DOC document
SPI_00-775-3339.doc DOC document
485365_RDL_REPORT.pdf PDF
SPI_00-733-4168.doc DOC document
DID_81534.pdf PDF
987875_APCSAFE.doc DOC document
DID_80728.pdf PDF
FA811914R0006.pdf PDF
925871_TRNSPDATA_REPORT.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of11 15

FD20301200911B-52/MULTIPLE

A001

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

COMMERCIAL ASSET VISIBILITY AIR FORCE

(CAVAF)/GOVERNMENT FURNISHED MATERIAL REPORT

CAV AF

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-MGMT-81634B PWS/SOW 848 SCMG/OM

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

DD

8. APP Code:

N/A N/A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

OC-ALC 0 1 0

15. Total: 0 1 0

16. Remarks:

NAME: Taylor, Shauna M DATE: 04 OCT 2012

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/OM in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 7.2 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.

Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 848 SCMG/OM, (405)736-2046.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Center (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

Taylor, Shauna M

848 SMBG / OB

405-736-7730

04 OCT 2012 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMAA

STEVENSON.JEFFREY.RYAN.1123021149

405-734-1827 / 884-1827

04 OCT 2012

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of21 15

A002

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

TEARDOWN DEFICIENCY REPORT N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ALSS-81534 N/A 424 SCMS/GUMAA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

NO

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

424 SCMS/GUMAA 0 1 0

15. Total: 0 1 0

16. Remarks:

NAME: Taylor, Shauna M DATE: 04 OCT 2012

Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports.

Blocks 10, 11, 12, and 13: To be negotiated on call by demand.

Taylor, Shauna M

848 SMBG / OB

405-736-7730

04 OCT 2012 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMAA

STEVENSON.JEFFREY.RYAN.1123021149

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of31 15

A003

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

DEPOT MAINTENANCE PRODUCTION REPORT N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ALSS-80728A N/A 424 SCMS/GUMAA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

SD

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

MTHLY

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

(SEE BLOCK 16)

424 SCMS/GUMAA

ACO

15. Total: 0 2 0

16. Remarks:

NAME: Taylor, Shauna M DATE: 04 OCT 2012

BLOCK 11: LAST DAY OF THE MONTH.

BLOCKS 12 AND 13: First report shall be submitted for the month initial delivery order or assets are received after contract award. All reports shall be mailed so as to arrive at 423 SCMS/GUME no later than the tenth (10th) calendar day of the month following the reporting period.

Block 14a: Email copies to addressees per attached Distribution Matrix.

Taylor, Shauna M

848 SMBG / OB

405-736-7730

04 OCT 2012 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMAA

STEVENSON.JEFFREY.RYAN.1123021149

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of41 15

B001

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

COMMERCIAL ASSET VISIBILITY AIR FORCE

(CAVAF)/GOVERNMENT FURNISHED MATERIAL REPORT

CAV AF

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-MGMT-81634B PWS/SOW 848 SCMG/OM

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

DD

8. APP Code:

N/A N/A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

OC-ALC 0 1 0

15. Total: 0 1 0

16. Remarks:

NAME: Taylor, Shauna M DATE: 04 OCT 2012

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/OM in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 7.2 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.

Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 848 SCMG/OM, (405)736-2046.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Center (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

Taylor, Shauna M

848 SMBG / OB

405-736-7730

04 OCT 2012 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMAA

STEVENSON.JEFFREY.RYAN.1123021149

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of51 15

B002

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

TEARDOWN DEFICIENCY REPORT N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ALSS-81534 N/A 424 SCMS/GUMAA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

NO

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

424 SCMS/GUMAA 0 1 0

15. Total: 0 1 0

16. Remarks:

NAME: Taylor, Shauna M DATE: 04 OCT 2012

Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports.

Blocks 10, 11, 12, and 13: To be negotiated on call by demand.

Taylor, Shauna M

848 SMBG / OB

405-736-7730

04 OCT 2012 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMAA

STEVENSON.JEFFREY.RYAN.1123021149

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of61 15

B003

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

DEPOT MAINTENANCE PRODUCTION REPORT N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ALSS-80728A N/A 424 SCMS/GUMAA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

SD

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

MTHLY

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

(SEE BLOCK 16)

424 SCMS/GUMAA

ACO

15. Total: 0 2 0

16. Remarks:

NAME: Taylor, Shauna M DATE: 04 OCT 2012

BLOCK 11: LAST DAY OF THE MONTH.

BLOCKS 12 AND 13: First report shall be submitted for the month initial delivery order or assets are received after contract award. All reports shall be mailed so as to arrive at 423 SCMS/GUME no later than the tenth (10th) calendar day of the month following the reporting period.

Block 14a: Email copies to addressees per attached Distribution Matrix.

Taylor, Shauna M

848 SMBG / OB

405-736-7730

04 OCT 2012 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMAA

STEVENSON.JEFFREY.RYAN.1123021149

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of71 15

C001

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

COMMERCIAL ASSET VISIBILITY AIR FORCE

(CAVAF)/GOVERNMENT FURNISHED MATERIAL REPORT

CAV AF

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-MGMT-81634B PWS/SOW 848 SCMG/OM

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

DD

8. APP Code:

N/A N/A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

OC-ALC 0 1 0

15. Total: 0 1 0

16. Remarks:

NAME: Taylor, Shauna M DATE: 04 OCT 2012

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/OM in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 7.2 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.

Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 848 SCMG/OM, (405)736-2046.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Center (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

Taylor, Shauna M

848 SMBG / OB

405-736-7730

04 OCT 2012 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMAA

STEVENSON.JEFFREY.RYAN.1123021149

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of81 15

C002

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

TEARDOWN DEFICIENCY REPORT N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ALSS-81534 N/A 424 SCMS/GUMAA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

NO

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

424 SCMS/GUMAA 0 1 0

15. Total: 0 1 0

16. Remarks:

NAME: Taylor, Shauna M DATE: 04 OCT 2012

Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports.

Blocks 10, 11, 12, and 13: To be negotiated on call by demand.

Taylor, Shauna M

848 SMBG / OB

405-736-7730

04 OCT 2012 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMAA

STEVENSON.JEFFREY.RYAN.1123021149

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of91 15

C003

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

DEPOT MAINTENANCE PRODUCTION REPORT N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ALSS-80728A N/A 424 SCMS/GUMAA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

SD

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

MTHLY

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

(SEE BLOCK 16)

424 SCMS/GUMAA

ACO

15. Total: 0 2 0

16. Remarks:

NAME: Taylor, Shauna M DATE: 04 OCT 2012

BLOCK 11: LAST DAY OF THE MONTH.

BLOCKS 12 AND 13: First report shall be submitted for the month initial delivery order or assets are received after contract award. All reports shall be mailed so as to arrive at 423 SCMS/GUME no later than the tenth (10th) calendar day of the month following the reporting period.

Block 14a: Email copies to addressees per attached Distribution Matrix.

Taylor, Shauna M

848 SMBG / OB

405-736-7730

04 OCT 2012 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMAA

STEVENSON.JEFFREY.RYAN.1123021149

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of101 15

D001

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

COMMERCIAL ASSET VISIBILITY AIR FORCE

(CAVAF)/GOVERNMENT FURNISHED MATERIAL REPORT

CAV AF

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-MGMT-81634B PWS/SOW 848 SCMG/OM

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

DD

8. APP Code:

N/A N/A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

OC-ALC 0 1 0

15. Total: 0 1 0

16. Remarks:

NAME: Taylor, Shauna M DATE: 04 OCT 2012

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/OM in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 7.2 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.

Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 848 SCMG/OM, (405)736-2046.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Center (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

Taylor, Shauna M

848 SMBG / OB

405-736-7730

04 OCT 2012 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMAA

STEVENSON.JEFFREY.RYAN.1123021149

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of111 15

D002

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

TEARDOWN DEFICIENCY REPORT N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ALSS-81534 N/A 424 SCMS/GUMAA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

NO

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

424 SCMS/GUMAA 0 1 0

15. Total: 0 1 0

16. Remarks:

NAME: Taylor, Shauna M DATE: 04 OCT 2012

Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports.

Blocks 10, 11, 12, and 13: To be negotiated on call by demand.

Taylor, Shauna M

848 SMBG / OB

405-736-7730

04 OCT 2012 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMAA

STEVENSON.JEFFREY.RYAN.1123021149

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of121 15

D003

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

DEPOT MAINTENANCE PRODUCTION REPORT N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ALSS-80728A N/A 424 SCMS/GUMAA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

SD

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

MTHLY

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

(SEE BLOCK 16)

424 SCMS/GUMAA

ACO

15. Total: 0 2 0

16. Remarks:

NAME: Taylor, Shauna M DATE: 04 OCT 2012

BLOCK 11: LAST DAY OF THE MONTH.

BLOCKS 12 AND 13: First report shall be submitted for the month initial delivery order or assets are received after contract award. All reports shall be mailed so as to arrive at 423 SCMS/GUME no later than the tenth (10th) calendar day of the month following the reporting period.

Block 14a: Email copies to addressees per attached Distribution Matrix.

Taylor, Shauna M

848 SMBG / OB

405-736-7730

04 OCT 2012 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMAA

STEVENSON.JEFFREY.RYAN.1123021149

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of131 15

E001

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

COMMERCIAL ASSET VISIBILITY AIR FORCE

(CAVAF)/GOVERNMENT FURNISHED MATERIAL REPORT

CAV AF

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-MGMT-81634B PWS/SOW 848 SCMG/OM

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

DD

8. APP Code:

N/A N/A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

OC-ALC 0 1 0

15. Total: 0 1 0

16. Remarks:

NAME: Taylor, Shauna M DATE: 04 OCT 2012

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/OM in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 7.2 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.

Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 848 SCMG/OM, (405)736-2046.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Center (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

Taylor, Shauna M

848 SMBG / OB

405-736-7730

04 OCT 2012 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMAA

STEVENSON.JEFFREY.RYAN.1123021149

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of141 15

E002

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

TEARDOWN DEFICIENCY REPORT N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ALSS-81534 N/A 424 SCMS/GUMAA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

NO

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

424 SCMS/GUMAA 0 1 0

15. Total: 0 1 0

16. Remarks:

NAME: Taylor, Shauna M DATE: 04 OCT 2012

Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports.

Blocks 10, 11, 12, and 13: To be negotiated on call by demand.

Taylor, Shauna M

848 SMBG / OB

405-736-7730

04 OCT 2012 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMAA

STEVENSON.JEFFREY.RYAN.1123021149

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of151 15

E003

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

DEPOT MAINTENANCE PRODUCTION REPORT N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ALSS-80728A N/A 424 SCMS/GUMAA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

SD

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

MTHLY

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

(SEE BLOCK 16)

424 SCMS/GUMAA

ACO

15. Total: 0 2 0

16. Remarks:

NAME: Taylor, Shauna M DATE: 04 OCT 2012

BLOCK 11: LAST DAY OF THE MONTH.

BLOCKS 12 AND 13: First report shall be submitted for the month initial delivery order or assets are received after contract award. All reports shall be mailed so as to arrive at 423 SCMS/GUME no later than the tenth (10th) calendar day of the month following the reporting period.

Block 14a: Email copies to addressees per attached Distribution Matrix.

Taylor, Shauna M

848 SMBG / OB

405-736-7730

04 OCT 2012 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMAA

STEVENSON.JEFFREY.RYAN.1123021149

File details come from the government source that posted it. Updated .