1748301_CDRL1_REPORT.pdf

PDF 141 KB Posted

Attached to
Repair services for the Control Alarm
Solicitation number
FA8117-16-R-0018
Issued by

About this file

CDRL Report

View the file

Other files

File Type Posted
1783445_ATTACH.docx DOCX document
overabove.docx DOCX document
1777216_PKGRQMT_REPORT.pdf PDF
FA811716R0018.pdf PDF
1783576_ATTACH.pdf PDF
1777254_TRNSPDATA_REPORT.pdf PDF
1741058_ATTACH.pdf PDF
1741057_ATTACH.pdf PDF
1748381_ATTACH.pdf PDF
1742667_ATTACH.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Control, Alarm

E. CONTRACT / PR NO.

FD20301502139

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Teardown Deficiency Report

3. SUBTITLE

TDR

4. AUTHORITY

DI-ALSS-81534

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 26 JUN 2014DATE:

Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports.

Blocks 10, 11, 12, and 13: To be negotiated on call by demand.

COORDINATORS:

422 SCMS/GUME

3001 Staff Drive Tinker AFB, OK 73145 Attn: Paul K. Sharbutt

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

21 SEP 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SHARBUTT.PAUL.K.JR.1123679560

422 SCMS / GUMEA 405-582-5273 / 852-5273

J. DATE

21 SEP 2015

Page 1 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 26 Jan 2016

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Control, Alarm

E. CONTRACT / PR NO.

FD20301502139

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Counterfeit Prevention Plan

3. SUBTITLE

CPP

4. AUTHORITY

DI-MISC-81832

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUEA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 29 JUL 2015DATE:

The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award (FA8117).

The contractor must implement counterfeit component detection and prevention measures (CPP) in accordance with SAE AS5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition.

COORDINATORS:

422 SCMS/GUEA

3001 Staff Drive Tinker AFB, OK 73145-3041

0 0 1

0 0 115. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

21 SEP 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SHARBUTT.PAUL.K.JR.1123679560

422 SCMS / GUMEA 405-582-5273 / 852-5273

J. DATE

21 SEP 2015

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Control, Alarm

E. CONTRACT / PR NO.

FD20301502139

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Commercial Asset Visibility AF (CAV AF) End Item Reporting

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634B

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS/SOW

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 09 JUL 2015DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNA in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training is provided by 848 SCMS/SRM, (405) 734-7171.

OC-ALC 0 1 0

0 1 015. TOTAL

Page 2 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 26 Jan 2016

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

21 SEP 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SHARBUTT.PAUL.K.JR.1123679560

422 SCMS / GUMEA 405-582-5273 / 852-5273

J. DATE

21 SEP 2015

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Control, Alarm

E. CONTRACT / PR NO.

FD20301502139

F. CONTRACTOR

1. DATA ITEM NO.

B001

2. TITLE OF DATA ITEM

Teardown Deficiency Report

3. SUBTITLE

TDR

4. AUTHORITY

DI-ALSS-81534

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 26 JUN 2014DATE:

Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports.

Blocks 10, 11, 12, and 13: To be negotiated on call by demand.

COORDINATORS:

422 SCMS/GUME

3001 Staff Drive Tinker AFB, OK 73145 Attn: Paul K. Sharbutt

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

21 SEP 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SHARBUTT.PAUL.K.JR.1123679560

422 SCMS / GUMEA 405-582-5273 / 852-5273

J. DATE

21 SEP 2015

Page 3 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 26 Jan 2016

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Control, Alarm

E. CONTRACT / PR NO.

FD20301502139

F. CONTRACTOR

1. DATA ITEM NO.

B002

2. TITLE OF DATA ITEM

Counterfeit Prevention Plan

3. SUBTITLE

CPP

4. AUTHORITY

DI-MISC-81832

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUEA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 29 JUL 2015DATE:

The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award (FA8117).

The contractor must implement counterfeit component detection and prevention measures (CPP) in accordance with SAE AS5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition.

COORDINATORS:

422 SCMS/GUEA

3001 Staff Drive Tinker AFB, OK 73145-3041

0 0 1

0 0 115. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

21 SEP 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SHARBUTT.PAUL.K.JR.1123679560

422 SCMS / GUMEA 405-582-5273 / 852-5273

J. DATE

21 SEP 2015

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Control, Alarm

E. CONTRACT / PR NO.

FD20301502139

F. CONTRACTOR

1. DATA ITEM NO.

B003

2. TITLE OF DATA ITEM

Commercial Asset Visibility AF (CAV AF) End Item Reporting

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634B

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS/SOW

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 09 JUL 2015DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNA in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training is provided by 848 SCMS/SRM, (405) 734-7171.

OC-ALC 0 1 0

0 1 015. TOTAL

Page 4 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 26 Jan 2016

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

21 SEP 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SHARBUTT.PAUL.K.JR.1123679560

422 SCMS / GUMEA 405-582-5273 / 852-5273

J. DATE

21 SEP 2015

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Control, Alarm

E. CONTRACT / PR NO.

FD20301502139

F. CONTRACTOR

1. DATA ITEM NO.

C001

2. TITLE OF DATA ITEM

Teardown Deficiency Report

3. SUBTITLE

TDR

4. AUTHORITY

DI-ALSS-81534

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 26 JUN 2014DATE:

Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports.

Blocks 10, 11, 12, and 13: To be negotiated on call by demand.

COORDINATORS:

422 SCMS/GUME

3001 Staff Drive Tinker AFB, OK 73145 Attn: Paul K. Sharbutt

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

21 SEP 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SHARBUTT.PAUL.K.JR.1123679560

422 SCMS / GUMEA 405-582-5273 / 852-5273

J. DATE

21 SEP 2015

Page 5 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 26 Jan 2016

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Control, Alarm

E. CONTRACT / PR NO.

FD20301502139

F. CONTRACTOR

1. DATA ITEM NO.

C002

2. TITLE OF DATA ITEM

Counterfeit Prevention Plan

3. SUBTITLE

CPP

4. AUTHORITY

DI-MISC-81832

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUEA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 29 JUL 2015DATE:

The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award (FA8117).

The contractor must implement counterfeit component detection and prevention measures (CPP) in accordance with SAE AS5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition.

COORDINATORS:

422 SCMS/GUEA

3001 Staff Drive Tinker AFB, OK 73145-3041

0 0 1

0 0 115. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

21 SEP 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SHARBUTT.PAUL.K.JR.1123679560

422 SCMS / GUMEA 405-582-5273 / 852-5273

J. DATE

21 SEP 2015

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Control, Alarm

E. CONTRACT / PR NO.

FD20301502139

F. CONTRACTOR

1. DATA ITEM NO.

C003

2. TITLE OF DATA ITEM

Commercial Asset Visibility AF (CAV AF) End Item Reporting

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634B

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS/SOW

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 09 JUL 2015DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNA in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training is provided by 848 SCMS/SRM, (405) 734-7171.

OC-ALC 0 1 0

0 1 015. TOTAL

Page 6 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 26 Jan 2016

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

21 SEP 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SHARBUTT.PAUL.K.JR.1123679560

422 SCMS / GUMEA 405-582-5273 / 852-5273

J. DATE

21 SEP 2015

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Control, Alarm

E. CONTRACT / PR NO.

FD20301502139

F. CONTRACTOR

1. DATA ITEM NO.

D001

2. TITLE OF DATA ITEM

Teardown Deficiency Report

3. SUBTITLE

TDR

4. AUTHORITY

DI-ALSS-81534

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 26 JUN 2014DATE:

Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports.

Blocks 10, 11, 12, and 13: To be negotiated on call by demand.

COORDINATORS:

422 SCMS/GUME

3001 Staff Drive Tinker AFB, OK 73145 Attn: Paul K. Sharbutt

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

21 SEP 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SHARBUTT.PAUL.K.JR.1123679560

422 SCMS / GUMEA 405-582-5273 / 852-5273

J. DATE

21 SEP 2015

Page 7 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 26 Jan 2016

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Control, Alarm

E. CONTRACT / PR NO.

FD20301502139

F. CONTRACTOR

1. DATA ITEM NO.

D002

2. TITLE OF DATA ITEM

Counterfeit Prevention Plan

3. SUBTITLE

CPP

4. AUTHORITY

DI-MISC-81832

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUEA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 29 JUL 2015DATE:

The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award (FA8117).

The contractor must implement counterfeit component detection and prevention measures (CPP) in accordance with SAE AS5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition.

COORDINATORS:

422 SCMS/GUEA

3001 Staff Drive Tinker AFB, OK 73145-3041

0 0 1

0 0 115. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

21 SEP 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SHARBUTT.PAUL.K.JR.1123679560

422 SCMS / GUMEA 405-582-5273 / 852-5273

J. DATE

21 SEP 2015

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Control, Alarm

E. CONTRACT / PR NO.

FD20301502139

F. CONTRACTOR

1. DATA ITEM NO.

D003

2. TITLE OF DATA ITEM

Commercial Asset Visibility AF (CAV AF) End Item Reporting

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634B

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS/SOW

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 09 JUL 2015DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNA in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training is provided by 848 SCMS/SRM, (405) 734-7171.

OC-ALC 0 1 0

0 1 015. TOTAL

Page 8 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 26 Jan 2016

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

21 SEP 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SHARBUTT.PAUL.K.JR.1123679560

422 SCMS / GUMEA 405-582-5273 / 852-5273

J. DATE

21 SEP 2015

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Control, Alarm

E. CONTRACT / PR NO.

FD20301502139

F. CONTRACTOR

1. DATA ITEM NO.

E001

2. TITLE OF DATA ITEM

Teardown Deficiency Report

3. SUBTITLE

TDR

4. AUTHORITY

DI-ALSS-81534

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 26 JUN 2014DATE:

Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports.

Blocks 10, 11, 12, and 13: To be negotiated on call by demand.

COORDINATORS:

422 SCMS/GUME

3001 Staff Drive Tinker AFB, OK 73145 Attn: Paul K. Sharbutt

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

21 SEP 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SHARBUTT.PAUL.K.JR.1123679560

422 SCMS / GUMEA 405-582-5273 / 852-5273

J. DATE

21 SEP 2015

Page 9 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 26 Jan 2016

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Control, Alarm

E. CONTRACT / PR NO.

FD20301502139

F. CONTRACTOR

1. DATA ITEM NO.

E002

2. TITLE OF DATA ITEM

Counterfeit Prevention Plan

3. SUBTITLE

CPP

4. AUTHORITY

DI-MISC-81832

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUEA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 29 JUL 2015DATE:

The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award (FA8117).

The contractor must implement counterfeit component detection and prevention measures (CPP) in accordance with SAE AS5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition.

COORDINATORS:

422 SCMS/GUEA

3001 Staff Drive Tinker AFB, OK 73145-3041

0 0 1

0 0 115. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

21 SEP 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SHARBUTT.PAUL.K.JR.1123679560

422 SCMS / GUMEA 405-582-5273 / 852-5273

J. DATE

21 SEP 2015

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Control, Alarm

E. CONTRACT / PR NO.

FD20301502139

F. CONTRACTOR

1. DATA ITEM NO.

E003

2. TITLE OF DATA ITEM

Commercial Asset Visibility AF (CAV AF) End Item Reporting

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634B

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS/SOW

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 09 JUL 2015DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNA in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training is provided by 848 SCMS/SRM, (405) 734-7171.

OC-ALC 0 1 0

0 1 015. TOTAL

Page 10 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 26 Jan 2016

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

21 SEP 2015

I. APPROVED BY

//DIGITALLY SIGNED//

SHARBUTT.PAUL.K.JR.1123679560

422 SCMS / GUMEA 405-582-5273 / 852-5273

J. DATE

21 SEP 2015

Page 11 of 11DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 26 Jan 2016

File details come from the government source that posted it. Updated .