FA810914R0001_______0002.pdf
PDF 37 KB Posted
- Attached to
- Professional, Administrative and Management Support Services Federal contract opportunity
- Solicitation number
- FA8109-14-R-0001
About this file
FA810914R0001-0002
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page 1
2. AMENDMENT/MODIFICATION NO.
FA8109-14-R-0001-0002
3. EFFECTIVE DATE
13 AUG 2014
4. REQUISITION/PURCHASE REQ. NO.
FD20301401887-02
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, AFSC PZAAC
3001 STAFF DR STE 1AC198C
TINKER AFB OK 73145-3033
BUYER: Harold Taylor/AFSC/PZAAC harold.taylor.8@us.af.mil Phone: (405) 736- 5668 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8109
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA810914R0001
9B. DATED (SEE ITEM 11)
1-AUG-2014
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Amendment/Modification FA8109-14-R-0001-0002
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to change the Data Item Description (DID) referenced for Contract Data Requirement List (CDRL) A007 attached to CLINs 0004, 1004, and 2004, change several paragraph references contained in Section L, Table 2.3, change paragraph reference in Section L, paragraph 4.3.1, and update business size standard for NAICS 518210.
FIRST: DID reference for CDRL A007, CLINS 0004, 1004, and 2004 are hereby amended (see bold type).
From:
CDRL# DID# Description Frequency A001 DI-ADMN-81249A Conference/Meeting Agenda As required
A002 DI-ADMN-81505 Conference/Meeting Minutes As required
A003 DI-MGMT-80227 Contractor Progress, Status, and Management Report Monthly
A004 DI-ADMN-80447A Contract Summary Report As required
A006 DI-MGMT-81642 Small Business Subcontract Report As required
A007 DI-MGMT-81642 DoD Architecture Framework Documentation As required
To:
CDRL# DID# Description Frequency A001 DI-ADMN-81249A Conference/Meeting Agenda As required
A002 DI-ADMN-81505 Conference/Meeting Minutes As required
A003 DI-MGMT-80227 Contractor Progress, Status, and Management Report Monthly
A004 DI-ADMN-80447A Contract Summary Report As required
A006 DI-MGMT-81642 Small Business Subcontract Report As required
A007 DI-MGMT-81644A DoD Architecture Framework Documentation As required
SECOND: Section L, Table 2.3 is hereby amended (see bold type).
From:
Table 2.3. Proposal Organization
Volume
ITO
Paragraph Number Volume Title
Hard Copies/
Disk Copies
Page Limit
I 4 Technical 5/1 40
2.2.1 Title Page (Not included in 40 page limit) 1
2.2.2 Team List (see Attach 2.0 ITO)(Not included in 40 page
limit)
2.2.7 Table of Contents Unlimited
2.2.8 List of Tables and Figures Unlimited
2.2.9 Glossary of Abbreviations and Acronyms Unlimited
II 5 Past Performance 5/1 Unlimited
2.2.1 Title Page 1
2.2.2 Team List (See Attach 2.0 ITO) 5
2.2.7 Table of Contents Unlimited
2.2.8 List of Tables and Figures Unlimited
2.2.9 Glossary of Abbreviations and Acronyms Unlimited
5.1 Present/Past Performance Information Sheets (PPIS)
(See Attach 1.1)
5.1.1 Consent Letter (See Attach 1.4) Unlimited
5.1.1 Client Authorization Letters (See Attach 1.5) Unlimited
5.2 Present/Past Performance Questionnaires (See Attach
1.2) Tab Only
5.3.1 Relevant Contract Narrative Max 5
pages per contract
5.3.2 Roadmap 2
III 6 Price Volume 4/2 Unlimited
2.2.7 Table of Contents Unlimited
2.2.9 Glossary of Abbreviations and Acronyms Unlimited
6.1 General Information Unlimited
6.2 Volume Organization Unlimited
IV 7 Contract Documentation 2/1 Unlimited
2.2.1 Title Page (SF1447) 1
2.2.2 Team List (see Attach 2.0 ITO) 5
2.2.7 Table of Contents Unlimited
2.2.8 List of Tables and Figures Unlimited
2.2.9 Glossary of Abbreviations and Acronyms Unlimited
2.2.2/7.3.4 Team List, Arrangements, and/or Letters of Intent Unlimited
7.1 Model Contract (Sections A-J) N/A
7.1.4 Representations and Certifications (Section K) N/A
7.3.1-7.3.3 Contact Information Unlimited
7.3.5 Attachments to the Model Contract Unlimited
To:
Table 2.3. Proposal Organization
Volume
ITO
Paragraph Number Volume Title
Hard Copies/
Disk Copies
Page Limit
I 3 Technical 5/1 40
2.3.1 Title Page (Not included in 40 page limit) 1
2.3.2 Team List (see Attach 2.0 ITO)(Not included in 40 page
limit)
2.3.7 Table of Contents Unlimited
2.3.8 List of Tables and Figures Unlimited
2.3.9 Glossary of Abbreviations and Acronyms Unlimited
II 4 Past Performance 5/1 Unlimited
2.3.1 Title Page 1
2.3.2 Team List (See Attach 2.0 ITO) 5
2.3.7 Table of Contents Unlimited
2.3.8 List of Tables and Figures Unlimited
2.3.9 Glossary of Abbreviations and Acronyms Unlimited
4.1.1 Present/Past Performance Information Sheets (PPIS)
(See Attach 1.1)
4.1.2 Consent Letter (See Attach 1.4) Unlimited
4.1.2 Client Authorization Letters (See Attach 1.5) Unlimited
4.2.2 Present/Past Performance Questionnaires (See Attach
1.2) Tab Only
4.3.1-4.3.2 Relevant Contract Narrative Max 5 pages per contract
4.3.3 Roadmap 2
III 5 Price Volume 4/2 Unlimited
2.3.7 Table of Contents Unlimited
2.3.9 Glossary of Abbreviations and Acronyms Unlimited
5.2 General Instructions Unlimited
5.3 Volume Organization Unlimited
IV 6 Contract Documentation 2/1 Unlimited
2.3.1 Title Page (SF1447) 1
2.3.2 Team List (see Attach 2.0 ITO) 5
2.3.7 Table of Contents Unlimited
2.3.8 List of Tables and Figures Unlimited
2.3.9 Glossary of Abbreviations and Acronyms Unlimited
2.3.2/6.3.4 Team List, Arrangements, and/or Letters of Intent Unlimited
6.1 Model Contract (Sections A-K) N/A
6.1.4 Representations and Certifications (Section K) N/A
6.3.2-6.3.4 Contact Information Unlimited
Last Row Deleted
THIRD: Section L, paragraph 4.3.1 is hereby amended (see bold type).
From: “The Government requests each PPIS not exceed a target of eight pages. Effort must be relevant to the management of a military indentured parts repository which included an IT capability. The Government requests each offeror submit up to five PPIS forms for the prime contractor and up to four for each significant subcontractor/teaming partner. The target of eight pages for PPIS does not include the allowable five pages for ITO paragraph number 5.3.1, Relevant Contract Narrative…”
To: “The Government requests each PPIS not exceed a target of eight pages. Effort must be relevant to the management of a military indentured parts repository which included an IT capability. The Government requests each offeror submit up to five PPIS forms for the prime contractor and up to four for each significant subcontractor/teaming partner. The target of eight pages for PPIS does not include the allowable five pages for ITO paragraph number 4.3.2, Relevant Contract Narrative…”
FOURTH: SF1447, block 8, the size standard for NAICS 518210 is hereby amended.
From: $30.0M
To: $32.5M
FIFTH: All other terms and conditions remain unchanged.
Request for Proposal FA8109-14-R-0001-0002
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Data
Basic Year Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 LO Not Separately Priced
Minimum Quantity
LO
Maximum Quantity
1 LO
CLIN ACRN ACRN Total
0004 AA
1 Lot consists of all Data reports.
DATA
Data IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH ON THE DD FORM 1423 ATTACHED AND MADE A
PART HEREOF.
CDRL# DID# Description Frequency A001 DI-ADMN-81249A Conference/Meeting Agenda As required A002 DI-ADMN-81505 Conference/Meeting Minutes As required A003 DI-MGMT-80227 Contractor Progress, Status, and Management Report Monthly A004 DI-ADMN-80447A Contract Summary Report As required A006 DI-MGMT-81642 Small Business Subcontract Report As required A007 DI-MGMT-81644A DoD Architecture Framework Documentation As required
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Workflow Exhibit: AA Quality Assurance: Standard Inspection Type / Ship To PACRN Mark For A 1423 In accordance with CDRL Type / Ship To Quantity (U/I) *ARO As required by
CDRL
_ Req No / Pri
Required Delivery
A 1423 1 LO *12 Months
Proposed Delivery
A 1423 1 LO
Data
Option 1 Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 LO Not Separately Priced
Minimum Quantity
LO
Maximum Quantity
1 LO
CLIN ACRN ACRN Total
1004 AA
1 Lot consists of all Data reports.
DATA
Data IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH ON THE DD FORM 1423 ATTACHED AND MADE A
PART HEREOF.
CDRL# DID# Description Frequency A001 DI-ADMN-81249A Conference/Meeting Agenda As required A002 DI-ADMN-81505 Conference/Meeting Minutes As required A003 DI-MGMT-80227 Contractor Progress, Status, and Management Report Monthly A004 DI-ADMN-80447A Contract Summary Report As required A006 DI-MGMT-81642 Small Business Subcontract Report As required A007 DI-MGMT-81644A DoD Architecture Framework Documentation As required
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Workflow Exhibit: AA Quality Assurance: Standard Inspection Type / Ship To PACRN Mark For A 1423 In accordance with CDRL Type / Ship To Quantity (U/I) *ARO As required by
CDRL
_ Req No / Pri
Required Delivery
A 1423 1 LO *12 Months
Proposed
A 1423 1 LO
Data
Option 2 Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
1 LO Not Separately Priced
Minimum Quantity
LO
Maximum Quantity
1 LO
CLIN ACRN ACRN Total
2004 AA
1 Lot consists of all Data reports.
DATA
Data IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH ON THE DD FORM 1423 ATTACHED AND MADE A
PART HEREOF.
CDRL# DID# Description Frequency A001 DI-ADMN-81249A Conference/Meeting Agenda As required A002 DI-ADMN-81505 Conference/Meeting Minutes As required A003 DI-MGMT-80227 Contractor Progress, Status, and Management Report Monthly A004 DI-ADMN-80447A Contract Summary Report As required A006 DI-MGMT-81642 Small Business Subcontract Report As required A007 DI-MGMT-81644A DoD Architecture Framework Documentation As required
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Workflow Exhibit: AA Quality Assurance: Standard Inspection Type / Ship To PACRN Mark For A 1423 In accordance with CDRL Type / Ship To Quantity (U/I) *ARO As required by CDRL _ Req No / Pri
Required Delivery
A 1423 1 LO *12 Months
Proposed
A 1423 1 LO
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: A 1423
IAW DD Form 1423
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
File details come from the government source that posted it. Updated .