March 4 2008 Pre-Proposal Conference Briefing Charts
View the file
Other files for this federal contract opportunity
Show all 50
Salvage Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HFGCS HFGCS
Antenna Program Support (APS)Antenna Program Support (APS)
PrePre--Proposal ConferenceProposal Conference 4 Mar 084 Mar 08
OKLAHOMA CITY OKLAHOMA CITY
AIR LOGISTICS CENTERAIR LOGISTICS CENTER
Dr. Tony Schones Program Management Flight Chief
(405) 734-2314 email: tony.schones@tinker.af.mil
Willie Washington Engineering Flight Chief
(405) 734-2334 email: willie.washington@tinker.af.mil
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
TEAM TINKER
547th ACSS
CLSCLS
OPENING
• Facilities
• Emergency Evacuation/Safety
• Introductions
• Agenda Review
AGENDA
8:00 – 8:15 Opening Remarks/Items of Interest 8:15 – 8:30 Opening 8:30 – 9:00 HFGCS Program Mission/
General HFGCS APS Requirements
9:00 – 9:15 BREAK
9:15 – 10:00 HFGCS APS Performance Work
Statement (PWS) Review
10:00 – 10:15 BREAK
10:15 – 11:00 HFGCS APS Contract Specifics
11:00 – 11:10 BREAK
11:10 – 12:00 HFGCS APS Contract Specifics
12:00 – 13:00 BREAK FOR LUNCH
13:00 Sidebar Meetings
HFGCS APS ACQUISITION
Opening Remarks
• Contracting Officer, only one with authority to bind the Government
• Information stated orally today will not alter the terms and conditions of the solicitation
• Will provide answers to questions up to posting date of solicitation to FedBizOpps
• Questions and answers will be incorporated into the solicitation and posted to FedBizOpps
HFGCS APS ACQUISITION
Items of Interest
• Issue Solicitation – approximately 26 Mar 08
• Proposals Due – approximately 12 May 08
• Estimated Contract Award Date – 12 Dec 08
TOPICS COVERED
• HFGCS Mission
• Map of HFGCS Sites
– Typical Station Nodes
• HFGCS Customers
• Antenna Program Overview
– Antenna Subsystem
– Program Goal
– Program Challenges
• Antenna Services
– Services to be covered under this solicitation
• PWS
– Services being sought
– Details of the Service Summary
– Covers Government property and services
• Closing Remarks
HFGCS MISSION
HFGCS provides and supports a highHFGCS provides and supports a high--power, high frequency global power, high frequency global communications network for the US Air communications network for the US Air Force and joint warfighter.Force and joint warfighter.
SCOPE Command is the modernization of HFGCS through integration of commercial off-the-shelf (COTS) equipment and software.
HFGCS STATION LOCATIONS
HAWAII
Central Network Control Station
ASCENSION
DIEGO GARCIA
LAJESWEST COAST
OFFUTT
CROUGHTON
YOKOTA
SIGONELLA
GUAM
ELMENDORF
PUERTO RICO
ANDREWS
High Power HF Communications
Receiver SiteTransmitter
Site
DISA Network (GIG)Control Site Intersite Communication via
Microwave or Cable
TYPICAL STATION NODES
5 – 50 Miles
HF GLOBAL CUSTOMERS
AMC’s Tactical Airlift Control Center & Airlift Fleet
• 80% of MAF
• Tactical Airlift Control Element
• MEDEVAC
STRATCOM
CJCS
AWACS
Defense Threat Reduction Agency
US CENTCOM
US NAVY High Command (HICOM) WHCA Presidential Communications (MYSTIC STAR) NCA/CINCs/VIP Communications Support Air Force Space Command (AFSPC)
- NASA
ACC – Heavies Mobility/Tactical Forces USAF MAJCOMs
NATO
System of Cooperation Among the American Air Forces, (SICOFAA) Federal Emergency Management Agency State Department Civil Air Patrol United Kingdom Royal Air Force (RAF) Canada
KEY C2 PROVIDER:
9/11
OIF
OEF
ONE
PLATFORMS:
Air Force One
NAOC
TACAMO
VIP Fleet
AWACS
P-3 Orion
KC-135/10
C-130/141/5/17
HFGCS ANTENNA PROGRAM
Jeff Johnston, Program Manager
Jeff Blosser, Program Engineer
Margaret Wright, Program Contracting Officer
• 194 HF Antennas Currently in Use
• 8 Different Manufacturers
• 25 Different Types
– 20 Fixed Omni-Directional
– 3 Fixed Directional
– 2 Rotatable
• Long-Term Standardization Target
– 9 Different Types
HFGCS ANTENNA PROGRAM
• Additional Sub-System Components
– Coaxial Cabling
• Air and Foam Die-Electric
– Electrical Power System
– Cable Pressurization System
– Surge-Suppression
– Lightning Protection
– Obstruction Lighting
Program Goal: To insure maximum long-term mission reliability
• Comprehensive Antenna Support Plan Optimizes and Monitors
– Maintenance
– Serviceability
– Standardization
– Future Life-Cycle of All Antenna Assets
ANTENNA PROGRAM CHALLENGES
• Many Different Types of Antennas
• No Standard Type Configuration
• Some Antennas In Varying Degrees of Disrepair
• Most In Environmentally-Unfriendly Global Locations
• No Standard Maintenance Concept
Severe corrosion on tower leg Broken radiator The wiring of the panel does not meet National Electric Code (NEC)
HFGCS ANTENNA SERVICES
Performance Work Statement (PWS)
• Scheduled Maintenance Support
• Teardown / De-Installation
• Installation
• Inspections
• Grounding, Bonding Shielding & Lightning Protection
• System Integration / Upgrades & Compatibility Needs
• Service Standards / Membership
• Acts of Nature / Unscheduled Maintenance
QUESTIONS?
High Frequency Global Communication System (HFGCS) Antenna Program Support (APS)
Margaret A. Wright
HFGCS APS ACQUISITION
Contracting Support
● 727 ACSG / PKC
● Purchasing Contracting Officer (PCO) Contact Information
Name: Margaret A. Wright Email: margaret.wright@tinker.af.mil
Phone: (405) 739 - 4448
HFGCS APS ACQUISITION
Overall Contract Framework
• Competitive 100% Small Business Set Aside
• Indefinite Delivery/Indefinite Quantity
• Single Best Value Award
• 7-Year Contract (Basic Year + 3 Option Years + 3 incentive Option Years)
• Performance-Based Services Acquisition
• Federal Acquisition Regulation (FAR) Part 12 – Commercial Contract
HFGCS APS ACQUISITION
Standard Form (SF) 1449
• SF 1449 - Contains information for the solicitation
• Front page – Contractor needs to fill-in all of 17a and 30a, 30b and 30c (signature)
HFGCS APS ACQUISITION
Contractor Line Items (CLINS)
● CLIN 0001 – Program Support – Firm Fixed Price (FFP) IAW Paragraph 1.1.1 of Statement Of Work (SOW)
● CLIN 0002 – Program Engineering Support
– Time & Material (T&M)
IAW Paragraph 1.1.2 of SOW To Be Determined (TBD) on Individual Delivery Order
● CLIN 0003 – Reserved
● CLIN 0004 – Unscheduled Maintenance Support – T&M IAW Paragraph 1.1.3.2 of SOW TBD on Individual Delivery Order
HFGCS APS ACQUISITION
CLINS
● CLIN 0005 – Short Notice Maintenance Support – T&M IAW Paragraph 1.1.3.3 of SOW TBD on Individual Delivery Order
● CLIN 0006 – Site Survey/De-Installation/Installation – T&M IAW Paragraph 1.1.4 of SOW -Table 1-1 in SOW -Attachment F: Proposed Antenna Replacement Matrix TBD on Individual Delivery Order
● CLIN 0007 – Antenna and Antenna Subsystems
– FFP Per Event/Occurrence
IAW Paragraph 1.1.4.1 of SOW
HFGCS APS ACQUISITION
CLINS
● CLIN 0008 – Preventative Maintenance Inspection
- FFP Per Event/Occurrence IAW Paragraph 1.1.5.1 and 1.1.3.1 of SOW -Attachment E: Antenna Database and -Attachment F: Proposed Antenna Replacement Matrix TBD on Individual Delivery Order
● CLIN 0009 – Phase Inspection – FFP Per Event/Occurrence IAW Paragraph 1.1.5.2 and 1.1.3.1 of SOW -Attachment C: Applicable Documents -Attachment G: Proposed Phase Inspection Requirements
HFGCS APS ACQUISITION
CLINS
● CLIN 0010 – GBSLP – T&M
IAW Paragraph 1.1.6 of SOW -Attachment C: Applicable Documents TBD on Individual Delivery Order
● CLIN 0011 – Phase-Out Period Requirement
- FFP Per Event/Occurrence-60 Day Period IAW Paragraph 1.11 of SOW TBD on Individual Delivery Order
● CLIN 0012 – Other Direct Costs – T&M
HFGCS APS ACQUISITION
CLINS
● CLIN 0013 – Over & Above – T&M Accomplished only when authorized by Administrative Contracting Officer (ACO) TBD on Individual Delivery Order
● CLIN 0014 – Data (CDRLS) – FFP – Not Separately Priced
● CLIN 0016 - Site Survey - This is an error and will not be in final solicitation.
HFGCS APS ACQUISITION
Special Clause – Incentive Options
1 2 3 4 5 6B
1 2 3 4 5 6B
1 2 3 4 5 6B
•Exceptional performance in contract years 1-3 yields three incentive options
•Failure to earn incentive option in base through option 2 results in the loss of opportunity for final incentive option
•Failure to earn at least one option during any two consecutive evaluation periods will result in loss of opportunity for additional incentive options (must begin source selection)
1 2 3 4 5 6B
1 2 3 4 5 6B
1 2 3 4 5 6B
Evaluated
Not Evaluated
Incentive Option
Incentive Not Earned
Incentive Lost
HFGCS APS ACQUISITION
Special Clause – Base Support
• Base Support 5352.245-9004
- Government support:
storage space for contractor furnished material and space for contractor’s hand tools
HFGCS APS ACQUISITION
Clauses
• Representations and Certifications (Reps & Certs)
- Ensure all applicable reps/certs/ are completed
- Read Online Representations and Certifications Applications (ORCA) instructions carefully
• Central Contractor Registration (CCR)
- Need to be registered in CCR
HFGCS APS ACQUISITION
Source Selection
● Full-tradeoff source selection
● Air Force procedures
- In Accordance With (IAW) new Air Force Federal Acquisition Regulation Supplement (AFFARS) 5315.3
- Air Force Acquisition Circular (AFAC) 2008-0128 dated 28 Jan 2008
HFGCS APS ACQUISITION
Source Selection
● Instructions to Offerors
- Make sure the instructions are followed for preparation of your proposals
- Pay attention to required page limits and number of hard copies/disk copies
- Proposal Organization IAW Table 2.2
Volume I – Executive Summary Volume II – Mission Capability Volume III – Proposal Risk Volume IV – Past Performance Volume V – Cost/Price Volume VI – Contract Documentation
HFGCS APS ACQUISITION
Source Selection
• Evaluation of Proposals
- Explains how proposals will be evaluated
- Explains past performance ratings
- Explains how technical evaluation is done and when a factor is met
HFGCS APS ACQUISITION
Closing
● Work in Progress
● Monitor FedBizOpps Postings for updates under FA8106-08-R-0001 not FA8102-07-R-0001
Source Selection Training
OKLAHOMA CITY OKLAHOMA CITY
AIR LOGISTICS CENTERAIR LOGISTICS CENTER
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
TEAM TINKER
Gary Macri PKC Contracting Branch Chief
TOPICS
• SOURCE SELECTION
– What Is It
– Best Value
– Main Members
– Exchanges with Offerors
• EVALUATION FACTORS AND RATINGS
– Mission Capability
– Proposal Risk
– Past Performance
– Cost/Price
• AWARD DECISION
What is Source Selection
• Source Selection is the Proposal Evaluation Phase of an acquisition cycle
• Determination is made as to which offeror receives the Contract Award
• Objective is to select the proposal that represents the Best Value to the Government
Best Value award to a higher rated, higher priced offeror where the decision is consistent with the evaluation factors and the SSA reasonably determines that the technical superiority and/or overall business approach, and/or superior past performance of the higher priced offeror, outweighs the cost difference
The Government reserves the right to….
Trade-off possibilities
– Mission
Capability
– Proposal Risk
– Past Performance
– Price
• Source Selection Authority (SSA)
– Makes the award decision
– Selects which proposal or proposals represent the best value to the Government
• Procurement Contracting Officer (PCO)
– Directs the evaluation of proposals
– Source of all direct communication between the Government and offerors
• Source Selection Evaluation Team (SSET)
– Evaluate Proposals
– Assign ratings
– Present evaluation results to the SSA
Source Selection Team Main Members
Source Selection Evaluation
Offeror
A
Offeror
B Offeror
C
Offeror
A
Offeror
B
Offeror
C
EVALUATION
CRITERIA
SSET does not compare proposals against each other
SSET evaluates each proposal against the stated evaluation criteria
Source Selection Decision
Offeror
A
Offeror
B Offeror
C
SSA does compare proposals against each other
SSA offeror comparison is based on the following considerations
Technical and Past Performance ratings for each offeror
Total evaluated price for each offeror
Factor order of importance as stated in the RFP
• Describes the Government’s requirement
• Solicits proposals from contractors to satisfy those requirements
• Includes Bid Schedule and Anticipated Terms and Conditions
• Instructions to Offerors (Section L)
– Information required to be in the proposal
• Evaluation Criteria for Award
Formal document issued by the GovernmentFormal document issued by the Government
Request for Proposal
(RFP)
RFP
Sections L and M
EVALUATION
FACTORS FOR
AWARD
EVALUATION CRITERIA
Criteria for award selection Evaluation factors and subfactors, and order of importance in relation to each other Factor and Subfactor ratings Proposals will be evaluated against stated criteria
INSTRUCTIONS
TO
OFFERORS
INSTRUCTIONS REGARDING PROPOSAL
CONTENT AND FORMAT
Includes format requirements, accepted document types, page limitations, etc Proposal separated into volumes, such as Mission Capability, Past Performance, Cost, etc Past Performance Package
FACTOR 1
MISSION CAPABILITY
FACTOR 2
PROPOSAL RISK
FACTOR 3
PAST PERFORMANCE
FACTOR 4
COST / PRICE
SUBFACTOR 1
SUBFACTOR 2
SUBFACTOR 3
SUBFACTOR 4
Evaluation Criteria Factors and Subfactors
3 Levels of Importance
1. Relative importance of
Factors 1, 2, and 3
2. Importance of Factors
1, 2, and 3, when combined in relation to Factor 4
3. Importance of each subfactor
• Exchanges with offerors are conducted through Evaluation Notices (ENs)
• Three types of ENs
– Clarifications – limited exchanges when award without discussions is contemplated
– Communications – exchanges leading to the establishment of a competitive range
– Discussions – formal negotiations conducted after the establishment of a competitive range
• Conducted with every offeror within the competitive range
• Each offeror is given the opportunity to revise their proposal
Exchanges with Offerors During Source Selection
COST/
PRICE
TOTAL
EVALUATED
PRICE
COMPLETE
REASONABLE
REALISM
Evaluation Factors and Ratings
PAST
PERFORMANCE
LEVELS OF
CONFIDENCE
SUBSTANTIAL
SATISFACTORY
LIMITED
NO
UNKNOWN
PROPOSAL
RISK
SUBFACTOR
LEVEL RATING
LOW
MODERATE
HIGH
UNACCEPTABLE
MISSION
CAPABILITY
SUBFACTOR
LEVEL RATING
BLUE
GREEN
YELLOW
RED
FACTOR 1
FACTOR 2
FACTOR 3
FACTOR 4
COST/
PRICE
TOTAL
EVALUATED
PRICE
COMPLETE
REASONABLE
REALISM
PAST
PERFORMANCE
LEVELS OF
CONFIDENCE
SUBSTANTIAL
SATISFACTORY
LIMITED
NO
UNKNOWN
PROPOSAL
RISK
SUBFACTOR
LEVEL RATING
LOW
MODERATE
HIGH
UNACCEPTABLE
MISSION
CAPABILITY
SUBFACTOR
LEVEL RATING
BLUE
GREEN
YELLOW
RED
FACTOR 1
FACTOR 2
FACTOR 3
Technical Evaluation
Technical Evaluation
MISSION CAPABILITY AND PROPOSAL RISK
TWO RATINGS FOR EACH SUBFACTOR
PROPOSAL RISKMISSION CAPABILITY
Depicts how well the proposal meets the mission capability subfactors listed in Section M
Assesses the risks associated with a proposed approach as it relates to the subfactors
BLUE
GREEN
YELLOW
RED
LOW
MODERATE
HIGH
UNACCEPTABLE
Color Rating Definitions
YELLOW Marginal There is doubt regarding whether an aspect of the proposal meets a specified minimum performance or capability requirements, but any such uncertainty is correctable
RED Unacceptable Fails to meet specified minimum performance or capability requirements. The proposal has one or more deficiencies and is not awardable.
GREEN Acceptable Meets specified minimum performance or capability requirements. A proposal must have no deficiencies but may have one or more strengths
BLUE Exceptional Exceeds specified minimum performance or capability requirements in a way beneficial to the Air Force. A proposal must have one or more strengths and no deficiencies to receive a blue.
Color Definition
• SSET documents evaluation results in terms of Strengths, Clarifications, Uncertainties, and Deficiencies
– Strength: a significant, outstanding, or exceptional aspect of an offeror’s proposal that has merit and exceeds specified performance or capability requirements in a way that is advantageous to the government, and either will be included in the contract or is inherent in the offeror’s process.
– Clarification: Meets minimum requirement. Additional information needed for minor clarification purposes, or for the purpose of determining a strength.
– Uncertainty: Doubt regarding whether an aspect of the proposal meets a material performance or capability requirement.
– Deficiency: A material failure of a proposal to meet a government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
Color Rating Documentation
LOW
Has little potential to cause disruption of schedule, increased cost, or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Proposal Risk Definition
MODERATE
Can potentially cause disruption of schedule, increased cost, or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
UNACCEPTABLE
The existence of a significant weakness (or combination of weaknesses) that is very likely to cause unmitigated disruption of schedule, drastically increase cost or severely degraded performance. Proposals with an unacceptable rating are not awardable.
Mission Capability Risk Definitions
HIGH
Likely to cause significant disruption of schedule, increased cost, or degradation of performance. Extraordinary contractor emphasis and rigorous government monitoring may be able to overcome difficulties.
• Includes potential for significant disruption of schedule, increased costs, degraded performance, or necessity for government oversight
• SSET documents proposal risk evaluation in terms of weaknesses
– Weakness: a flaw in the proposal that increases the risk of unsuccessful contract performance. A “significant weakness” in the proposal is a flaw that appreciably increases the risk of unsuccessful contract performance
• A Moderate or High risk rating for a subfactor must include one or more identified weaknesses within the subfactor
Proposal Risk Evaluation
Color and Proposal Risk Differences
PROPOSAL RISKMISSION CAPABILITY
Does the offeror’s proposal meet the requirements of Section M?
Based on the offeror’s proposed approach, what is the likelihood of unsuccessful contract performance?
Strengths, Clarifications Uncertainties, Deficiencies
Weaknesses
B G Y R L M H U
COST/
PRICE
TOTAL
EVALUATED
PRICE
COMPLETE
REASONABLE
REALISM
PROPOSAL
RISK
SUBFACTOR
LEVEL RATING
LOW
MODERATE
HIGH
UNACCEPTABLE
MISSION
CAPABILITY
SUBFACTOR
LEVEL RATING
BLUE
GREEN
YELLOW
RED
FACTOR 1
FACTOR 2
FACTOR 4PAST
PERFORMANCE
LEVELS OF
CONFIDENCE
SUBSTANTIAL
SATISFACTORY
LIMITED
NO
UNKNOWN
FACTOR 3
Past Performance Evaluation
• Measures the level of confidence the Government has in the offeror’s likelihood of successfully performing the proposed effort.
• Rating is established through a review and analysis of the offeror’s recent, relevant, and past performance.
• Performance evaluation focuses on portion of effort the offeror accomplished on previous/current contracts compared to the portion to be performed on the proposed effort.
• Emphasis is on demonstrated performance – not promises
Performance Confidence Assessment Rating
SATISFACTORY
CONFIDENCE
Based on the offeror’s performance record, the government has a high expectation that the offeror will successfully perform the required effort.
Based on the offeror’s performance record, the government has an expectation that the offeror will successfully perform the required effort.
Based on the offeror’s performance record, the government has a low expectation that the offeror will successfully perform the required effort.
Based on the offeror’s performance record, the government has no expectation that the offeror will successfully perform the required effort.
SUBSTANTIAL
CONFIDENCE
LIMITED
CONFIDENCE
NO
CONFIDENCE
Confidence Definitions
Rating Definition
UNKNOWN
CONFIDENCE
No performance record is identifiable or the offer’s performance record is so sparse that no confidence assessment rating can be reasonably assigned.
Recency
• Recency, as stated in the RFP
– Example: The contract shall have been performed during the past four years from the date of issuance of the current RFP
– If any part of the performance falls within the recency timeframe, the contract in its entirety may be evaluated for past performance
– For example, if a contract was completed within the recency timeframe, the Government may also consider the Phase-In portion of that contract, which may have occurred seven years ago.
PAST PERFORMANCEEXPERIENCE
Reflects how relevant the contractor’s previous work is to the proposed acquisition
Describes how well the contractor performed the previous work
HIGHLY RELEVANT
RELEVANT
SOMEWHAT RELEVANT
NOT RELEVANT
BLUE - EXCEPTIONAL
PURPLE – VERY GOOD
GREEN - SATISFACTORY
Past Performance Evaluation
YELLOW - MARGINAL
RED - UNSATISFACTORY
CONFIDENCE RATING
HR VG N/A
SUB 4
ES
SUB 3
CM
SUB 2
QY
SUB 1
PM
R VG R VG
SR VG
$100M (10 yr)
Government Program
F34601-99-C-9932 FFP/CR
R E HR S R S$340M
(8 yr)
Company A Excel Project Cost Plus
SR VG SR S$5.3M
(5yr)
Company B Order 58CP T & M
ALPHA, INC.
SIGNIFICANT CONFIDENCE
N/A
N/A
DOLLAR
AMOUNT
PROGRAM
CONTRACT #
ALPHA, INC
N/A$100M (10 yr)
Company C N/A (G) FFP with Incentive
$200M (9 yr)
Government Program
F09603-98-C-9950 CPFF N/A
ZETA CORP
HR E
R P
N/A
N/AS
R VG
SR S
PRIME
SUBCONTRACTOR
Past Performance Evaluation
• Past Performance and Executive Summary volume of the offeror’s proposal
• Contract Information Sheets (Prime and Subcontractors)
– Provided by contractor as part of proposal
• Questionnaires
– Included as part of the RFP package
– Completed by contractor references
– Submitted directly to PCAG Evaluation Team
• Contractor Performance Assessment Reporting System (CPARS)
– Government database of contractor performance records on government contracts
Past Performance Data Sources
PAST
PERFORMANCE
LEVELS OF
CONFIDENCE
SUBSTANTIAL
SATISFACTORY
LIMITED
NO
UNKNOWN
PROPOSAL
RISK
SUBFACTOR
LEVEL RATING
LOW
MODERATE
HIGH
UNACCEPTABLE
MISSION
CAPABILITY
SUBFACTOR
LEVEL RATING
BLUE
GREEN
YELLOW
RED
FACTOR 1
FACTOR 2
FACTOR 3
COST/
PRICE
TOTAL
EVALUATED
PRICE
COMPLETE
REASONABLE
REALISM
Cost / Price
• Completeness
– Did the offeror complete the Bid Schedule as required by the RFP
– Does the offeror’s proposal include all supporting cost/price information as required by the RFP
• Reasonableness
– Cost/Price proposal should address all RFP requirements
– Competitive market should establish price reasonableness
– PCO makes the determination of price reasonableness
Cost/Price Evaluation
• Realism
– Is the proposed price realistic for the work to be performed
– Does the proposed price reflect a clear understanding of the requirement
– Does the proposed price provide a sound approach to satisfy RFP requirements
– Is the proposed price consistent with the unique methods of performance and materials described in the offeror’s technical proposal
– Are differences between the proposed price and the Independent Government Estimate (IGE) reasonably explained
Cost/Price Evaluation
Initial Evaluation offeror’s proposal
ENs prepared and finalized
Evaluation of EN responses
Follow-up ENs
Initial Ratings established
Ratings adjusted Based on
EN responses
Release ENs to offerors
Request for Final Proposal Revisions (FPR
Receive FPRs from offerors
Final evaluation of proposals
Final ratings established
SSA Best Value Decision
INITIAL
EVALUATION DISCUSSIONS FINAL
EVALUATION
Three Phases of Source Selection Evaluation
SOURCE SELECTIONSOURCE SELECTION
AWARDAWARD
SSA Decision Briefing Debriefings
Offeror A $75.0M
Total Evaluated
Price Past Performance Confidence Level
SUBSTANTIAL
CONFIDENCE
Mission Cap Subfactors Color & Proposal Risk
Ratings
1 2 3 4
B L
G L
G M
B L
Evaluation Summary
SSA’s Best Value Decision is based on comparison of all remaining offerors
Debriefings
• Conducted separately for each offeror that requests debrief
• Purpose
– Identify weaknesses in the offeror’s proposal so they can prepare better proposals in future government acquisitions
– Instill confidence in the offeror that their proposal was treated fairly and evaluated in accordance with the RFP
• A debriefing is not intended to be…
– A page-by-page analysis of the offeror’s proposal
– A point-by-point comparison of the proposals of the debriefed offeror and the successful offeror(s)
– A debate or defense of the government’s award decision or evaluation results
• Source Selection is a Subjective process
• Source Selection Evaluation Team (SSET) strives for consistency with each offeror
• SSET evaluation is based on stated factors and written criteria listed in the RFP, not a comparison of offeror proposals
• SSA determines which offeror represents the best value to the Government based on a comparison of offerors against the evaluation criteria
• Link to Mandatory Procedures MP5315.3, Source Selection Procedures
– http://farsite.hill.af.mil/archive/AFFARS/2005-
0209/MP5315.3.htm#P234_38575
Summary