AppendixB.doc
DOC document 47 KB Posted
- Attached to
- F108 1ST STAGE FAN ROTOR BLADE Federal contract opportunity
- Solicitation number
- FA8100-13-R-0003
About this file
Appendix B
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA810013R0003_______0001.RTF | RTF text file | |
| Attch2QASP8Jan13.doc | DOC document | |
| AppendixC.doc | DOC document | |
| FA810013R0003_Distro31MAY13.pdf | ||
| ExhibitD.pdf | ||
| Attch3Packaging.pdf | ||
| ExhibitA.pdf | ||
| Attch1PWS14MAR13.doc | DOC document | |
| ExhibitB.pdf | ||
| ExhibitC.pdf | ||
| AppB1SGFP5MAR2013.xlsx | XLSX spreadsheet | |
| Attch4WD052057.txt | TXT text file |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HEADQUARTERS
OKLAHOMA CITY AIR LOGISTICS CENTER
UNITED STATES AIR FORCE
TINKER AIR FORCE BASE, OK 73145
GOVERNMENT FURNISHED PROPERTY APPENDIX B
4APR13
CONTR NO:
PMS: Jimmy Horton
PR NO: FD2030-13-40383
PH #: (405) 736-2527
FX #: (405) 734-5917
Type Work:
Repair Type Equipment: F108 Component(s): 1st Stage Fan Blade
TABLE OF CONTENTS
Page
| 1. |
| General |
| 2 |
| 2. |
| Terms Explained |
| 2 |
| 3. |
| Transportation Information |
| 3 |
| 4. |
| Disposition of Government Property |
| 3 |
| 5. |
| Loss Damage, Destruction, or Theft (LDDT) of Government Property |
| 4 |
| 6. |
| Visits |
| 4 |
1. GENERAL: Government Furnished Property (GFP), at no cost, is applicable to the performance of this contract because the acquisition cost of the Government Property, F108 1st Stage Fan Blades described in PWS 1.1 through 1.1.2 requiring repair off-site exceed the simplified acquisition threshold. See PWS 1.1 for Description of Blades.
The Contractor shall manage and control Government Furnished Property in accordance with this Appendix B and the Government Property clauses cited in the contract. The Contractor shall comply with the provisions of the Federal Acquisition Regulation (FAR), Part 45, in effect on the date of contract award, which is hereby incorporated by reference and made a part of the contract.
The Contractor shall also handle all GFP received in accordance with the applicable technical data, and shall maintain constant care over these items while in their possession.
Note: Any references to GFP in the PWS and/or Appendix B also includes Contractor Acquired Property (CAP) used as GFP.
2. TERMS EXPLAINED: Terms and definitions contained in the cited regulations are supplemented below as applicable.
a. Administrative Contracting Officer (ACO): A contracting officer assigned responsibility for the post award functions related to the administration of a government contract in the field. The ACO is normally located in the Defense Contract Management Agency (DCMA) office. The ACO is responsible for ensuring the contractor performs in accordance with the terms of the contract.
b. Contractor Furnished Material (CFM): Material provided by the contractor to accomplish the repair. This material is incorporated into an end item to be delivered under the contract. The material cost is included in the cost of repair.
c. Contractor Furnished Property (CFP): The Contractor will provide and finance CFP, without separate reimbursement, all material specifically authorized in this contract.
d. Government-Furnished Property (GFP): All property in the possession of or acquired by the government and subsequently delivered or otherwise make available to the contractor.
e. Julian Date: A method used by the government to track days according to a system usually covering one year and referring the days of each week to the days of the month. (Example: Julian Date 2098. Number 2 refers to the year 2002, and 098 refers to the ninety-eighth day of the year, the eighth day of April (example 8 April 2002)
f. Procuring Contracting Officer (PCO): The person responsible for entering into a contract on behalf of the government. The PCO will ordinarily be located at the funding ALC.
g. Production Management Specialist (PMS): An individual assigned by the contracting activity to act as liaison for production, supply, and transportation issues.
h. Material Support Division (MSD) Items: Items that have an ERRC code of C (XD1) or T (XD2). These items are referred to as line replacement units (LRU) and shop replacement units (SRU) respectively.
3. TRANSPORTATION INFORMATION: The Government will pack and ship the F108 1st Stage Fan Blades to the Contractor for finishing repairs 005-010 at the Government’s expense, Freight On Board (FOB) Destination.
The Contractor shall transmit a copy of the Bill Of Lading and tracking number by e-mail, phone, or fax to the OC-ALC/76 PMXG PMS within 12 work hours as deliverables are shipped.
4. DISPOSITION OF GOVERNMENT PROPERTY: The PCO will furnish final disposition instructions to the Contractor.
a. CONDEMNED GOVERNMENT PROPERTY: Disposition instructions for all items, such as critical items, MSD and save list items that are condemned during the performance of this contract, shall be requested through the PCO from the ALC. All recommended condemnations shall be tagged and returned to OC-ALC Tinker AFB using a DD Form 1149.
NOTE: Processing of Government Furnished Property (GFP) rejects. Action to be taken in disposing of property that is not acceptable, identifiable or related to support of the contract.
b. CONTRACT EXCESS: The Contractor shall ensure that all excess repairable end items being returned to the Air Force have the note “Contract Excess” entered into the shipping documents to preclude OC-ALC recording such excess as additional repairable generations. The contractor shall ensure that excess repairable end items are returned to OC-ALC unless another address is specified.
DD Form 1149 shall be used in returning excess, misdirected government repairable material. The contractor shall transmit a copy of the DD Form 1149 to the OC-ALC/76 PMXG PMS within 12 work hours after shipment.
c. SHIPMENT DISCREPANCY: Property received by the contractor and recognized as misdirected, will be rerouted to the correct location if known by the contractor. If the correct location cannot be identified, contact the OC-ALC/76 PMXG Production Management Specialist (PMS).
A Supply Discrepancy Report, SF 364, will be prepared and forwarded to the shipping activity for corrective action to prevent reoccurrence. Manual Discrepancy reports shall be submitted by e-mailing the following address: dlacontactcenter@dla.mil. Their commercial number is (877) 352-2255 or DSN: 661-7766, FAX number (269)-961-7791, DSN: 661-7791.
5. RESERVED.
6. LOSS, DAMANGE, DESTRUCTION, OR THEFT (LDDT): The Contractor’s liability for Loss, Damage, or Destruction (including Theft) to the GFP described in PWS Section 1 and this Appendix B shall begin when the Contractor receives the GFP for repair. The Contractor shall remain liable for this GFP until returned to the Government at the destination specified in the contract and inspected and accepted by the Government QAP.
Except for reasonable wear and tear to Government Furnished Property (GFP) or for GFP properly consumed in performing this contract, the Contractor shall be liable for Loss, Damage, Destruction, or Theft (LDDT) of GFP (and/or Contractor Acquired Property (CAP) used as GFP if applicable). Compensation shall be effected by either reduced amounts owed to the Contractor or by direct payment as determined by the Government Contracting Officer (CO). The amount of compensation due the Government by the Contractor shall be the Intrinsic value of the property, as determined by the Government Contracting Officer, i.e., the amount of compensation due to the Government may range from scrap value, salvage value, repair cost, or replacement cost, as determined by degree of damage or loss and the continuing need of the Government for that property. Immediate notification (within one workday) of a LDDT incident/accident shall be made to the Government Contracting Officer (CO) and the Government Quality Assurance Personnel (QAP) via electronic mail (e-mail). A detailed written report, as determined acceptable by the Government CO, shall be submitted to the Government CO and QAP no later than three (3) workdays after discovery of the LDDT incident/accident to GFP.
7. VISITS: Surveillance visits will be made by the ACO and/or the contracting
File details come from the government source that posted it. Updated .