FA6800-15-Q-S048_(Questions_and_Answers__1).pdf
PDF 80 KB Posted
- Attached to
- AFICA ETool Managed Cabinets Federal contract opportunity
- Solicitation number
- FA6800-15-Q-S048
About this file
Questions and Answers- AFICA ETool Managed Cabinets (FA6800-15-Q-S048)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA6800-15-Q-S048_(Questions_and_Answers__2).pdf | ||
| Q A_Attachment__1-_CISCO_Switches.docx | DOCX document | |
| AFICA_eTool_Managed_Cabinets_SOW.pdf | ||
| AFICA_eTool_Cabinets-Combined_Synopsis-Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS #1 ON THE SOLICITATION FOR AFICA ETOOL
MANAGED CABINETS (FA6800-15-Q-S048)
Question 1. Are the switches to be provided by the vendor with the cabinets, or does the Air
Force have switches they will be installing in the cabinets?
Answer 1. Cabinets will have the Air Force Approved switch (vendor Provides).
Question 2. If switches are to be provided, which version of the Cisco WS-2960 switch is preferred for each cabinet?
Answer 2. Please see attached word document showing Approved AF switches (link provided a bottom of document)
-Will have an Air Force Approved Managed Network Switch (CISCO WS-2960)
(Note: 30 drawer cabinets will require 48 port switch; 10 drawer cabinets will require 24 port switch) mounted to support the LAN connection in all drawers storing the laptops
File details come from the government source that posted it. Updated .