Drawing_Two.pdf
PDF 758 KB Posted
- Attached to
- CONSTRUCT ADDITION FOR C-17 PARTS STORAGE B312 Federal contract opportunity
- Solicitation number
- FA6712-17-B-0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_20_Sep_17.pdf | ||
| Questions_18_Sep_17.docx | DOCX document | |
| Sign_In_Sheet.pdf | ||
| SOW_Attachments_Specs_and_Dwgs.zip | ZIP file | |
| As-_Builts.zip | ZIP file | |
| PR_Att_1-_Statement_of_Work-JLSS_17-0003_Rev_1.docx | DOCX document | |
| PR_Att_1-_Statement_of_Work-JLSS_17-0003_Rev_1.docx | DOCX document | |
| Drawings_2009-11-03.pdf | ||
| General_Wage_Decision_18_Aug_2017.pdf | ||
| FA6712-17-B-0001_-_B312_IFB.PDF | ||
| PR_Att_1-_Statement_of_Work-JLSS_17-0003.pdf | ||
| B312_-_Bid_Schedule.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
106 E Market Street Suite 505 Warren, Ohio 44481 P: (330)652-7711 F: (330)652-7714 www.dawnincorporated.com
Request for Information (RFI)
To:
Attention:
From:
Project:
Contract/Solicitation #:
Date:
RFI #:
REQUEST:
Clarify Drawings, specifications, and/or procedures
Clarify Solicitation, Contract, and/or attachments
Approve use of material or equipment
Other:
DESCRIPTION:
Wall composition.
Steps and landing.
Blank Page
| Clarify Drawings specifications andor procedures: Off |
| Clarify Solicitation Contract andor attachments: On |
| Approve use of material or equipment: Off |
| Other: Off |
| Text1: 911 MSG/LGC |
| Text2: FA6712-17-B-0001 |
| Text3: Dr. Michael Tucker |
| Text4: Dave Butler |
| Text5: JLSS 17-0003 C17 Parts Storage B312 |
| Text6: 15 Sep 17 |
| Text7: 17-0023-001 |
| Text8: 1. Is there a requirement for a firewall or fire separation between the new and existing buildings? |
No.
2. Are there any lifting devices being hung from the structure inside?
No.
3. During design does the brick band on the lower part of the building need to continue around the new addition?
Yes.
4. Can the existing exterior finish on the wall above the brick band be removed and reused on the new addition?
Yes, but contractor should be extra careful not to split the wood, a reference picture of wall composition is provided. Section of building where wood is removed shall not be left exposed.
5. Is the door and landing that will now fall inside of the new addition to stay as the means of access from the existing structure to the new addition?
Yes.
6. Is the dumpster pad to be relocated and is that part of this project? If so is a brick enclosure required?
No, dumpster pad does not need to be relocated it will only be demolished.
7. Are the steps and landing for the new entrance to the exist building required to be CMU or can they be steel with a grated landing?
Steps and landing for the new entrance should match existing steps and landing as stated in the statement of work; concrete and brick around it; reference picture provided.
8. Our 3 new exterior walls will most likely be CMU. Is there a requirement to paint the interior surface?
Yes.
9. Is there any warehouse racking to be included in the project?
No.
10. Does the existing building have a mass notification system that we will be required to tie into?
No
11. The sketch provided indicates a sidewalk option but there is no option for a sidewalk nor is it discussed in the statement of work.
A side walk should be included as part of the project.
12. Are the electrical outlets on the new exterior wall required to be flush mounted or can the conduit and boxes be surface mounted?
Electrical outlets need to be flush mounted.