CONSTRUCT ADDITION FOR C-17 PARTS STORAGE B312 Federal contract opportunity
Solicitation number
FA6712-17-B-0001
Issued by
Department of the Air Force Reserve Command

View the file

Other files for this federal contract opportunity

Other files attached to CONSTRUCT ADDITION FOR C-17 PARTS STORAGE B312, newest first.
File Type Posted
Questions_20_Sep_17.pdf PDF
Questions_18_Sep_17.docx DOCX document
Sign_In_Sheet.pdf PDF
SOW_Attachments_Specs_and_Dwgs.zip ZIP file
As-_Builts.zip ZIP file
PR_Att_1-_Statement_of_Work-JLSS_17-0003_Rev_1.docx DOCX document
PR_Att_1-_Statement_of_Work-JLSS_17-0003_Rev_1.docx DOCX document
Drawings_2009-11-03.pdf PDF
General_Wage_Decision_18_Aug_2017.pdf PDF
FA6712-17-B-0001_-_B312_IFB.PDF PDF
PR_Att_1-_Statement_of_Work-JLSS_17-0003.pdf PDF
B312_-_Bid_Schedule.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

106 E Market Street Suite 505 Warren, Ohio 44481 P: (330)652-7711 F: (330)652-7714 www.dawnincorporated.com

Request for Information (RFI)

To:

Attention:

From:

Project:

Contract/Solicitation #:

Date:

RFI #:

REQUEST:

Clarify Drawings, specifications, and/or procedures

Clarify Solicitation, Contract, and/or attachments

Approve use of material or equipment

Other:

DESCRIPTION:

Wall composition.

Steps and landing.

Blank Page

Clarify Drawings specifications andor procedures: Off
Clarify Solicitation Contract andor attachments: On
Approve use of material or equipment: Off
Other: Off
Text1: 911 MSG/LGC
Text2: FA6712-17-B-0001
Text3: Dr. Michael Tucker
Text4: Dave Butler
Text5: JLSS 17-0003 C17 Parts Storage B312
Text6: 15 Sep 17
Text7: 17-0023-001
Text8: 1. Is there a requirement for a firewall or fire separation between the new and existing buildings?

No.

2. Are there any lifting devices being hung from the structure inside?

No.

3. During design does the brick band on the lower part of the building need to continue around the new addition?

Yes.

4. Can the existing exterior finish on the wall above the brick band be removed and reused on the new addition?

Yes, but contractor should be extra careful not to split the wood, a reference picture of wall composition is provided. Section of building where wood is removed shall not be left exposed.

5. Is the door and landing that will now fall inside of the new addition to stay as the means of access from the existing structure to the new addition?

Yes.

6. Is the dumpster pad to be relocated and is that part of this project? If so is a brick enclosure required?

No, dumpster pad does not need to be relocated it will only be demolished.

7. Are the steps and landing for the new entrance to the exist building required to be CMU or can they be steel with a grated landing?

Steps and landing for the new entrance should match existing steps and landing as stated in the statement of work; concrete and brick around it; reference picture provided.

8. Our 3 new exterior walls will most likely be CMU. Is there a requirement to paint the interior surface?

Yes.

9. Is there any warehouse racking to be included in the project?

No.

10. Does the existing building have a mass notification system that we will be required to tie into?

No

11. The sketch provided indicates a sidewalk option but there is no option for a sidewalk nor is it discussed in the statement of work.

A side walk should be included as part of the project.

12. Are the electrical outlets on the new exterior wall required to be flush mounted or can the conduit and boxes be surface mounted?

Electrical outlets need to be flush mounted.

File details come from the government source that posted it. Updated .