050212-statement of work24dec08.pdf

PDF 8 KB Posted

Attached to
Welding Shop Electrical Upgrade
Solicitation number
FA6670-09-B-0001
Issued by

About this file

Statement of Work

View the file

Other files

File Type Posted
09B1 Amend 0003.pdf PDF
FA6670-09-B-0001, Site Visit Questions & Answers.pdf PDF
09B1 Amend 0002.pdf PDF
09B1 Addendum #1.pdf PDF
af3000.pdf PDF
weldshopTABLE OF CONTENTS —
Spec 16415A.pdf PDF
Weldshopdwgs.pdf PDF
Spec16375A.pdf PDF
weldspeccover.pdf PDF
Spec 01330.pdf PDF
01330 _SUBMITTAL LIST.pdf PDF
Spec 16050N.pdf PDF
spec 02220.pdf PDF
FA6670-09-B-0001.pdf PDF
2008biddocs.lnk LNK file
09B1 Amend 0001.pdf PDF
DB Wage Decision 1-2-09.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

24 December 2008

STATEMENT OF WORK

RVKQ 05-0212

Welding Shop Electrical Upgrade

Building 847

DESCRIPTION OF PROPOSED CONSTRUCTION:

1.) Provide all material and labor to upgrade the existing electrical services from a 225 amp, 120/208 volt, three phase to a 120/208 volt, three phase, 600 amp. Existing primary electric and transformer concrete pad will be utilized. Remove existing 75 kVA transformer and secondary feeders. Contractor shall properly dispose of existing transformer. Provide a new 225 kVA transformer with new secondary service conduits, conductors, and distribution panel as shown on attached line diagram.

2.) Location of the new service panel will be on the inside north west corner of the building. This panel will support new equipment loads and will have a 225 amp sub feed breaker to feed the existing distribution panel located in the north east corner of the building.

3.) Conductors and conduit shall be run to locations of new equipment, final equipment location to be determined in the field.

4.) Remove 120V duplex receptacle and feeder to allow for panel installation. Provide unistrut and required mounting hardware to install panel. Panel shall be offset from wall with strut to clear compressed air line.

5.) Remove 100A disconnect for temporary trailer service tap at transformer and reconnect into new panel MDP. Provide feeders for new electrical equipment. Refer to panel schedules and one-line for conduit and cable sizes.

6.) All wiring shall meet the National Electrical Code, current edition.

7.) Project submittals shall be submitted in accordance with Section 01330.