Questions-2.docx

DOCX document 14 KB Posted

Attached to
Repair Retaining Wall B128 Federal contract opportunity
Solicitation number
FA6656-16-B-0002
Issued by
Department of the Air Force Reserve Command

View the file

Other files for this federal contract opportunity

Other files attached to Repair Retaining Wall B128, newest first.
File Type Posted
Questions-1.docx DOCX document
Site_visit_attendees.pdf PDF
Site_Visit_Minutes_Retaining_Wall.docx DOCX document
Amenment1FA665616B0002.docx DOCX document
ResQuesAttachment4B128_wall.docx DOCX document
zqel_12-0021_dwgs_(6_JULY_2015)Attach3.pdf PDF
zqel_12-0021specsAttach2.pdf PDF
Solicitation__B128_Retaining_wall.docx DOCX document
WagesAttachment1retainwallb128.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

FA6656-16-B-0002

1. Question: Would concrete pavement be accepted as an alternate to asphalt between the new retaining walls?

Answer: Yes

2. Question: On drawing C1.0 Coded Note #17 that access to doorway in building 128 must be maintained access to at all time during construction. Is this referring to only the lower door on the backside of the existing retaining wall or the top man door as well? Even if just the lower door there will a short time during demolition and also on the day that area is poured that we would want to close that door way off for safety. Are there other doors on other sides of the building that can be used during those times?

Answer: C 1.0 Coded Note 17 is referring to maintaining access to the lower door only. The lower door will be unusable at times for safety reasons however, attempt to keep the doorway accessible as much as safety will allow.

3. Question: Can we find out weight of the Chiller unit for rigging purposes?

Answer: The manufacturer stated weight is approxmately 3000 pounds.

4. Is there any special controls that may have to be addressed? Such as unit being monitored on a remote computer. If so is there a certain controls contractor that takes care of this site or that you use on site?

Answer: Automated controls on base are installed by Johnson Controls and are montitored on site by EAST.