Questions-2.docx
DOCX document 14 KB Posted
- Attached to
- Repair Retaining Wall B128 Federal contract opportunity
- Solicitation number
- FA6656-16-B-0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions-1.docx | DOCX document | |
| Site_visit_attendees.pdf | ||
| Site_Visit_Minutes_Retaining_Wall.docx | DOCX document | |
| Amenment1FA665616B0002.docx | DOCX document | |
| ResQuesAttachment4B128_wall.docx | DOCX document | |
| zqel_12-0021_dwgs_(6_JULY_2015)Attach3.pdf | ||
| zqel_12-0021specsAttach2.pdf | ||
| Solicitation__B128_Retaining_wall.docx | DOCX document | |
| WagesAttachment1retainwallb128.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
FA6656-16-B-0002
1. Question: Would concrete pavement be accepted as an alternate to asphalt between the new retaining walls?
Answer: Yes
2. Question: On drawing C1.0 Coded Note #17 that access to doorway in building 128 must be maintained access to at all time during construction. Is this referring to only the lower door on the backside of the existing retaining wall or the top man door as well? Even if just the lower door there will a short time during demolition and also on the day that area is poured that we would want to close that door way off for safety. Are there other doors on other sides of the building that can be used during those times?
Answer: C 1.0 Coded Note 17 is referring to maintaining access to the lower door only. The lower door will be unusable at times for safety reasons however, attempt to keep the doorway accessible as much as safety will allow.
3. Question: Can we find out weight of the Chiller unit for rigging purposes?
Answer: The manufacturer stated weight is approxmately 3000 pounds.
4. Is there any special controls that may have to be addressed? Such as unit being monitored on a remote computer. If so is there a certain controls contractor that takes care of this site or that you use on site?
Answer: Automated controls on base are installed by Johnson Controls and are montitored on site by EAST.