Technical Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Minutes_18May16.pdf | ||
| Sign_in_2.pdf | ||
| FA6633-16-B0004 _0002_Amendment.docx | DOCX document | |
| QJKL_150037-Drawings-04May2016.pdf | ||
| 01_Technical_Specifications_-_27April2016.pdf | ||
| FA6633-16-B0004_0001_Repair_Perimeter_Fence.pdf | ||
| Site_Visit_Minutes_21Apr16.pdf | ||
| Sign_in_roster.pdf | ||
| FA6633-16-B0004 _Solicitation.docx | DOCX document | |
| SF_24_Bid_Bond_Form.pdf | ||
| Financial_Responsibility_Sheet.doc | DOC document | |
| Drawings_-_8March2016.pdf | ||
| Wage_Determination_MN96.doc | DOC document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
934 Airlift Wing Minneapolis – St. Paul Air Reserve Station Minneapolis, MN 55450-
Project No. QJKL 15-0037
REPAIR POL FENCE
th Civil Engineering 760 Military Highway, Building 744 Minneapolis, MN 55450
8 March 2016
QJKL 15-0037
PROJECT TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00.00 40 SUMMARY OF WORK
01 33 00 SUBMITTAL PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 57 20.00 10 ENVIRONMENTALPROTECTION
01 62 35 RECYCLED/RECOVERED MATERIALS
01 74 19 CONSTRUCTION DEMOLITION WASTE MANAGEMENT
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 10 1A CONCRETE FORMWORK
03 30 00 CAST-IN-PLACE STRUCTURAL CONCRETE
DIVISION 31 - EARTHWORK
31 23 00.00 20 EXCAVATION AND FILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 20 00 CONCRETE PAVEMENT
32 31 13.53 HIGH SECURITY FENCE AND GATES
32 92 19 SEEDING
-- End of Project Table of Contents -
SECTION 01 11 00.00 40 – PAGE 1
SECTION 01 11 00.00 40
SUMMARY OF WORK
PART 1 GENERAL
1.1 ATTACHMENTS
AF 3064 (Construction Progress Schedule)
AF 3065 (Progress Report)
DD1354 Real Property Checklist
Detail drawings
1.2 DESCRIPTION OF WORK
The scope of this project is to furnish all plant, labor, materials, and equipment and performing all work for repairing a portion of the POL fence. Also, the removal of a portion of an asphalt driveway and the installation of a sidewalk. The salient components of this project consist (but are not limited to) the following See the technical drawings for more information.
a. The following work will be as follows:
i. Perimeter fence around a portion of the POL compound
(1) Fence demolition and installation
a. Demolition of approximately 800 linear feet of chain link fence and gate at north side of compound.
b. Furnish and install 800 linear feet of new fence per section 32
31 13.53 00 HIGH SECURITY FENCES AND GATES.
(2) Remove multimode fiber optic intrusion detection system
a. Remove and dispose of fiber optic sensor cable.
b. Remove for re-use connection box near gate (the gate that is to be removed) on the north side of the compound.
(3) Curb and sidewalk Furnish and install approximately 30 linear feet of curb and gutter per section 03 10 1A CONCRETE FORMWORK.
(4) Site Work
a. Demolish approximately 4500 square feet of an existing asphalt driveway.
b. Furnish and install 4500 square feet of grassy area indicated on the drawings and per section 32 29 19 SEEDING.
1.3 CONTRACT DRAWINGS
SECTION 01 11 00.00 40 – PAGE 2
1.3.1 SETS FURNISHED
The Contractor shall check be responsible for making copies of specifications including amendments. The bid drawings as amended shall be utilized in the performance of the work the contract drawings (i.e., bid drawings that have been posted with all amendment changes) are provided to the contractor. See the paragraph below for contract drawing and distribution requirements. The work shall conform to the contract drawings, set out in the drawing index, all of which form a part of these specifications. The work shall also conform to any standard details bound or referenced herein.
1.3.2 NOTIFICATIONS OF DISCREPANCIES
The Contractor shall check all drawing files furnished him immediately upon their receipt and shall promptly notify the Contracting Officer of any discrepancies. Dimensions marked on drawings shall be followed in lieu of scale measurements. Enlarged plans and details shall govern where the same work is shown at smaller scales. All scales shown are based on a standard drawing size of 24" x 36". If any other size drawings are furnished or plotted the contractor shall adjust the scales accordingly. The Contractor shall also advise sub-contractors of the above. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have been avoided thereby.
1.3.3 OMISSIONS
Omissions from the drawings or specifications or the mis-description of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or mis-described details of the work and will be responsible for any errors which might have been avoided thereby.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Submit the following items to the Contracting Officer:
Construction Progress Schedule (AF 3064); G Material Approval Schedule (AF 3000); G
See Sub-section 1.5 SCHEDULING OF WORK.
SD-11 Closeout Submittals
Submit the following items to the Contracting Officer:
DD Form 1354 Checklist; G
AF 3065 (Progress Report); G
SECTION 01 11 00.00 40 – PAGE 3
As-built drawings; G
Contractor shall submit for approval within 10 days after NTP, a plan indicating the location and phasing of the temporary fencing and new security fencing to ensure security and emergency access are maintained to the Air Reserve Station throughout the life of the contract. Close coordination with Base Security personnel and the Contracting Officer's Representative is required. Proposed location for the fencing and proposed construction phasing plan are identified on the drawings.
1.5 SCHEDULING OF WORK
The Contractor shall, within five days after the work commences or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval, three (3) copies of a Construction Progress Schedule (AF IMT 3064) showing the order in which the Contractor proposes to perform the work. The schedule shall separate the work into phases developed in cooperation with the Government. The schedule shall include the dates on which the Contractor contemplates starting and completing the salient elements of the work. The Contractor shall also specifically identify on each progress report, any apparent, anticipated or proposed deviation from the previously approved schedule.
1.6 REGULATIONS
The Contractor shall comply with all standard and special safety and fire regulations, including those in the Corps of Engineers Safety Manual, the American General Contractors Safety Manual, OSHA, and certain base regulations. Prior to the start of the work, the Contractor may be required to meet with the Contracting Officer to review specific safety and fire regulations.
1.7 TESTING
The contractor shall furnish all material testing and certifications as required by this contract.
any expense associated with the use of an independent testing agency, as may be required by this contract shall be provided unless otherwise specified.
1.8 WARRANTIES AND OPERATING INSTRUCTIONS
Warranties and operating instructions are required to be submitted directly to the Contracting Officer at the completion of the contract work. Four copies of all warranties and operating instructions shall be provided unless otherwise specified.
1.9 GOVERNMENT OCCUPANCY
The Government will occupy areas adjacent to the work site during construction. Contractor shall schedule and perform the work so as not to interfere with the Government's operations.
The Contractor shall cooperate fully with the Government during construction operations to minimize conflicts and to facilitate Government usage.
1.10 BASE HOURS
Base operation hours are 7:00 a.m. to 5:00 p.m. daily (Monday through Friday), excluding federal holidays. Access to the base during other times must be requested in writing from the Contracting Officer and will be granted only for extenuating circumstances.
SECTION 01 11 00.00 40 – PAGE 4
1.11 BASE ACCESS
Access onto and across the grounds shall be as directed by the Government. Employee parking shall be as directed by the Contracting Officer. Also, the Government may impose restrictions regarding methods and points of contractor access in order to maintain orderly operation of the facility during the construction period.
1.12 TEMPORARY BARRICADES AND FENCES
The Contractor shall furnish, install, and maintain barricades, fences, warning signs, steps, bridges, platforms and scaffolds required for execution of the Contractor's work and to secure hazardous areas and equipment from the general public or the building occupants.
Maintain all temporary facilities and controls as long as needed for the safe and proper completion of the work. Remove all such temporary facilities and controls as rapidly as progress of the work will permit or as directed by the Contracting Officer.
1.13 TEMPORARY CONSTRUCTION FACILITIES
1.13.1 Contractor Office
Not Used.
1.13.2 Sanitary Facilities
The Contractor is required to furnish and maintain a temporary water closet or privy.
1.14 AVAILABILITY OF UTILITY SERVICES
Not applicable.
1.15 UTILITY SERVICE INTERRUPTIONS
The Contractor shall submit written notification not less than 15 calendar days in accordance of each interruption of each utility and communication service to or within existing buildings and facilities being used by others. No single outage will exceed 4 hours unless approved in writing. The time and duration of all outages will be coordinated and approved with the using agency by the Contracting Officer.
1.16 PERMITS
1.16.1 Digging Permit
To ensure personnel safety and utility safety when work is to be done below grade, it is the responsibility of the Contractor to obtain an on-base (AF IMT 103) digging permit and a GOPHER ONE digging permit. For an on-base digging permit the Contractor shall provide the
Contracting Officer with not less than 10 calendar days written notice of the intent to perform digging or excavation work to allow the Government the opportunity to locate and mark its utilities which may interfere with the proposed work. For a GOPHER ONE digging permit, the Contractor shall follow standard Minnesota State procedures.
SECTION 01 11 00.00 40 – PAGE 5
1.16.2 NOT USED
1.16.3 Aerospace Clearances
MAC Aerospace Evaluation Application: If any of the work requires a crane, boom truck or any other type of equipment that will affect local aerospace; the Contractor is responsible for obtaining prior clearance from MAC through Civil Engineering.
FAA Form 7460-1, Notice of Proposed Construction or Alteration: In addition to obtaining clearance from MAC, the Contractor shall also be required to ensure the necessary coordination and/or clearance is obtained for an approved FAA Form 7460-1 from the Federal Aviation Administration through Civil Engineering.
1.16.4 Not Used
1.17 PROTECTION OF FACILITIES
The Contractor shall preserve and protect all structures, equipment, pavements and vegetation on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall repair or replace any damage resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. Any repair or replacement shall be accomplished at the expense of the Contractor and to the satisfaction of the Contracting Officer.
1.18 DD FORM 1354 CHECK LIST
Contractor shall complete and provide a completed DD Form 1354 check list upon the completion of the project. A copy of the DD Form 1354 check list is included in these specifications. For this particular project, it will be essential that the contractor identify and list all quantities demolished and/or constructed. It is imperative that the Contractor submit this completed checklist 45 calendar days PRIOR to project completion. This is required to that an applicable DD Form 1354 be approved and signed WITHIN 10 calendar days of project completion.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section –
SECTION 01 11 00.00 40 – PAGE 6
SECTION 01 11 00.00 40 – PAGE 7
SECTION 01 11 00.00 40 – PAGE 8
SECTION 01 11 00.00 40 – PAGE 9
D 1354 CHECKLIST
PROJECT NAME :_______________________________________
PROJECT #:_______________________________________
CONTRACT #:_____________________________________
TOTAL CONSTRUCTION COST: ____________________________
(FOR REAL PROPERTY/ENGINEERING ONLY): IS DESIGN MONEY INCLUDED IN THE
TOTAL
CONSTRUCTION COST, IF NOT PLEASE INDICATE DESIGN COSTS ________________.
NOTE: COST OF ITEMS LISTED BELOW: NOTE: ACCUMULATED COST OF ALL ITEMS
MUST
EQUAL FINAL CONSTRUCTION COST.
SITE PREPARATION (INCLUDES DEMO, EARTHWORK, CLEAR GRUB AND DEBRIS
– MOSTLY FOR NEW CONSTRUCTION: COST: ______________
MISC. (PLEASE EXPLAIN – DESCRIPTION & EXPENSE/COST OF PROJECT WORK
THAT DOES NOT FIT INTO ANY OF THE ITEMS BELOW):
COST: __________________________________________________________
NOTE: WHERE THERE ARE TWO MEASUREMENTS, I NEED INFO FOR BOTH. COST
INCLUDES ALL MATERIALS AND LABOR NEEDED TO INSTALL THE ITEM, BROKEN
DOWN BY THE LISTED UNIT OF MEASURE.
CAT CODE NOMENCLATURE
112-211 TAXIWAY – Hard surface that connects the parking and maintenance areas of the airfield with the runways and provides access to the hangars, docks and various parking areas and pad. (Concrete)
Installed: ___________SY ___________COST Removed: ___________SY ___________COST
113-321 APRON – Cost includes concrete/bituminous surface, base course, sub-base, and striping. Cost does not include lighting, nav-aids or shoulders.
Installed (Concrete): ___________SY ___________COST Removed (Concrete): ___________SY ___________COST Installed (Bituminous): ___________SY ___________COST Removed (Bituminous): ___________SY ___________COST
SECTION 01 11 00.00 40 – PAGE 10
CAT CODE NOMENCLATURE
125-554 PIPELINE – Fuel pipelines are provided for each different grade of fuel, except for cross-country pipelines and offshore unloading lines.
Installed: ___________LF __________COST Removed: ___________LF __________COST
126-925 FILL STAND, TRUCK – Truck fill stands are provided at all Air Force bases where bulk petroleum products are stored and dispensed. They are required as a means of loading fuel from the storage tanks into fuel servicing vehicles and tank trucks.
Installed: ___________OL ___________COST Removed: ___________OL ___________COST
126-926 STAND, UNLOADING – Truck unloading stands/headers are provided at all Air Forces bases where bulk petroleum products are stored and dispensed. The fuel loading facilities are required as a means of unloading fuel from fueling vehicles into fuel storage tanks.
Installed: ___________OL ___________COST Removed: ___________OL ___________COST
132-133 PAD EQUIP (Explain what slab is for) – Identifies general purpose concrete pads that are used to support ground communications equipment i.e., air conditioners, generators, etc.
Installed: ___________SY ___________EA ___________COST Removed: ___________SY ___________EA ___________COST
Explanation (Ex: Concrete slab to hold an A/C unit):
132-134 ANTENNA SUPPORT STRUCTURE – Identifies towers, tower guys, antenna poles, concrete footings and hardstands supporting communications – electronics equipment.
Installed: ___________EA ___________COST Removed: ___________EA ___________COST
135-583 TELEPHONE DUCT – Ductwork for underground distribution of the base telephone cable plant installed for reasons of cable protection and ease of expansion of additions cable plants. Normally used for the cable under pavements.
Installed: ___________LF ___________COST Removed: ___________LF ___________COST
179-371 TRAINING AID – Training includes prime beef training ranges/areas, security police or readiness courses, drill pads, fire training pits, etc.
Installed: ___________EA ___________COST
SECTION 01 11 00.00 40 – PAGE 11
Removed: ___________EA ___________COST
452-252 OPEN STORAGE BASE SUPPLY – This facility is an improved or paved area used to store materials authorized for open storage.
Installed: ___________SY ___________COST Removed: ___________SY ___________COST
452-255 BASE CIVIL ENGINEER OPEN STORAGE – Facility designed for open storage of Base Civil Engineer construction materials and equipment that can withstand exposure to the elements.
Installed: ___________SY ___________COST Removed: ___________SY ___________COST
690-252 BILLBOARD – Identifies permanently constructed boards (outdoors) which are used to post notices and advertisement.
750-172 ATHLT FLD BASEBALL – Self Explanatory
Installed: _______________AC ___________EA ___________COST Removed: _______________AC____________EA __________COST
750-347 CRT, TENNIS – Self Explanatory
Installed: ___________EA ___________COST Removed: ___________EA ___________COST
750-349 CRT, RECTN – Self Explanatory
750-371 RECREATION PAVILION – Outdoor facility that supports recreation areas.
Installed: ___________SF ___________EA ___________COST Removed ___________SF ___________EA ___________COST
811-147 EMERGENCY ELECTRIC POWER GENERATION PLANT – Facility designed to provide emergency standby power.
Installed: ___________KW ___________COST Removed: ___________KW ___________COST
SECTION 01 11 00.00 40 – PAGE 12
812-223 PRI ELECT DSTR – OVERHEAD – Identifies those components of the base electrical distribution system and equipment of the overhead primary or higher voltage circuits of the system (poles, buys, cross arms, insulators, hardware, transformers lighting arresters, fuses, line switches and associated equipment).
Installed: ___________LF ___________COST Removed: ___________LF ___________COST Installed Transformer ___________KVA___________COST Removed Transformer ___________KVA___________COST Installed Power Poles – (LF Between Poles) ________LF ____EA ___________COST Removed Power Poles – (LF Between Poles) ________LF ____EA _________COST
812-224 SEC ELEC DISTR – OVERHEAD – Identifies those secondary distribution lines that are components of the base electrical distribution system. The above-ground secondary lines consist of conductors, insulators, service drops, control devices, etc.
Installed: ___________LF ___________COST Removed: ___________LF ___________COST
812-225 PRI ELEC DISTR – UNDERGROUND – Identifies the components of underground electrical distribution system. The underground distribution primary line consists of ducts, man-holes, vaults, cables, pot heads, transformers, switches, protective devices, and associated equipment.
Installed: ___________LF ___________COST Removed: ___________LF ___________COST Transformer ___________KVA__________COST
812-226 SEC ELEC DISTR – UNDERGROUND – Identifies components of base electrical underground secondary distribution system. This system consists of conductors, ducts, conduit, splice boxes, manholes, services, control and protective devices, and associated equipment.
Installed: ___________LF ___________COST Removed: ___________LF ___________COST
812-926 EXTERIOR AREA LIGHTING – Applies to street lighting, apron floodlighting, aircraft alert apron safety lighting and security lighting. Does not include lights attached to a building.
Installed: ___________EA ___________COST Removed: ___________EA ___________COST
813-231 ELEC SUBSTATION – Identifies those facilities that change the voltage, normally from high voltage (15000 and higher) to a lower voltage for primary distribution. They include the transformers, switching equipment, circuit breakers and safety equipment.
Installed: ___________KV ___________COST
SECTION 01 11 00.00 40 – PAGE 13
Removed: ___________KV ___________COST
821-112 HEATING FUEL OIL STOR – Identifies those underground tanks used to store diesel for use in operation of the central heating plants.
Installed: ___________GA ___________COST Removed: ___________GA ___________COST
821-113 HEATING FROM CENTRAL PLANT – Identifies those facilities that receive heat from a central plant and distributes it to one or more buildings. The mechanical rooms may be a part of or stand alone they include piping, converts, manifolds, pump stations and equipment.
Installed: ___________SF ___________COST Removed: ___________SF ___________COST
821-115 HEATING PLANT – This facility provides government-owned generation of heat. Plant capacity is in millions of British Thermal Units (MB). Please note MBs do not equal MBTUs. MBTUs are thousands of British Thermal Units. Convert MBTUs to MB by dividing by 1,000; Example 50,000 MBTUs/1,000 = 50 MBs.
Installed: ___________MBtu ___________COST Removed: ___________MBtu ___________COST
821-155 STEAM PLT IND – This facility provides steam service to buildings for other than facility heating requirement.
Installed: ___________MBtu ___________COST Removed: ___________MBtu ___________COST
CAT CODE NOMENCLATURE
822-265 STEAM HEAT MAINS – Identifies the steam supply and condensate return lines used in an exterior heat distribution system to heat most buildings of a base-wide heating system.
Installed: ___________LF ___________COST Removed: ___________LF ___________COST
822-268 CONDEN PMP STN – Identifies the condensate return pump station located in buildings that are heated from a base-wide heating system using steam mains.
Installed: ___________SF ___________COST Removed: ___________SF ___________COST
824-462 GAS METER FCLTY – Identifies those facilities and associated metering equipment used to measure the flow rate, pressure, temperature, etc. or any gas used as a facility heating fuel.
Installed: ___________SF ___________COST Removed: ___________SF ___________COST
824-464 GAS MAINS – Identifies the supply lines to the heat plant, heating facility or
SECTION 01 11 00.00 40 – PAGE 14
whatever other facility that may be using gas as a fuel source.
Installed: ___________LF ___________COST Removed ___________LF ___________COST 832-255 INDUSTRIAL WASTE MAINS – Identifies sewage collection mains serving industrial wastewater treatment and disposal system.
Removed: ___________LF ___________COST
832-266 SANITARY SEWER MAINS – Identifies sewage collection mains serving sanitary wastewater treatment and disposal system.
Installed: ___________LF ___________COST Removed: ___________LF ___________COST
832-267 SAN SEWAGE PMP STN – Identifies sanitary sewage pumping station including pits, pumping equipment, controls and structures.
Installed: ___________SF ___________COST Removed: ___________SF ___________COST
842-245 WATER DISTR MAINS – Identifies domestic water distribution mains. These mains are those between the water supply mains and the building mains serving individual facilities.
Installed: ___________LF ___________COST Removed: ___________LF ___________COST
843-314 FIRE PROTECTION WATER MAIN – Identifies water mains used exclusively to provide water from fire protection water storage and/or pump stations to fire protection systems and/or fire hydrants.
Removed: ___________LF ___________COST
843-315 FIRE HYDRANTS – Identifies fire hydrants used to supply water for the protection of buildings, structures, open storage, materiel, parked motor vehicles and aircraft, fuel handling points, Etc.
843-319 FIRE PROTECTION WATER STOR – Identifies water storage tanks/reservoir exclusively used for supplying fire protection systems.
SECTION 01 11 00.00 40 – PAGE 15
Installed: ___________LF ___________COST Removed: ___________LF ___________COST
851-143 CURBS & GUTTERS – Identifies curbs and gutters and attendant underground drainage systems that are authorized along streets and around off-street parking areas to and in control and collection of surface storm water.
Installed: ___________LF ___________COST Removed: ___________LF ___________COST
CAT CODE NOMENCLATURE
852-289 SIDEWALKS – Identifies hard surfaced walkways that are authorized for pedestrian traffic.
Installed: __________SY ___________ COST Removed: __________SY ___________ COST
851-145 DRIVEWAY – Identifies those private roads leading from a street or other thoroughfare to a building, house, garage, etc.
Installed: __________SY ___________ COST Removed: __________SY ___________ COST
852-261/852-262 VEH PKNG – Provides parking space for rganizational/ non-organizational vehicles
Installed: __________SY ___________ COST Removed: __________SY ___________ COST Location (Bldg #):_________________________________________________________
871-183 STORM DRAINS – Identifies storm drainage components such as drainage piping, channels, catch basins, culvers and manholes, etc.
Installed: ___________LF ___________COST Removed: ___________LF ___________COST
871-187 RETAINING WALL – Identifies those structures (walls) built to resist lateral pressure other than wind pressure. Such as holding in place a mass of earth, at the edge of a terrace or excavation area.
Installed: ___________SY ___________LF ___________COST Removed: ___________SY ___________LF ___________COST
872-247 SECURITY FENCE – This type of fencing/barriers are required specifically for restricted or controlled areas.
Installed: ___________LF ___________COST Removed: ___________LF ___________COST
872-248 INTERIOR FENCE – Identifies those fences whose primary function is clearly neither boundary nor security control. For example: fences that primarily promote
SECTION 01 11 00.00 40 – PAGE 16
personnel or traffic safety, operating efficiency or protection of environment.
Installed: ___________LF ___________COST Removed: ___________LF ___________COST
872-841 SECURITY ALARM SYSTEM – Intrusion detection alarm systems consist of electronic monitoring devices, detection devices and associated transmission lines, power supplies and signaling equipment.
Alarm System Installed: ___________EA ___________COST Alarm System Removed: ___________EA ___________COST Other Info: __________________Manufacturer
CATCODE NOMENCLATURE
880-211 CLOSED HEAD AUTO SPRINKLERS – Identifies the closed head automatic sprinkler system, which is installed in compliance with functional requirements The SF is area protected.
Sprinkler System Installed: __________SF___________HD ___________COST Sprinkler System Removed __________SF___________HD ___________COST Other Info: ___________________Manufacturer
880-212 OPEN HEAD DELUGE SYSTEM – Identifies those open head deluge systems presently installed in large hangar type facilities. However, this system is not authorized for new construction. The SF is area protected.
Deluge System Installed: __________SF___________HD ___________COST Deluge System Removed: __________SF___________HD ___________COST Other Info: ___________________Manufacturer
880216 PA SPRINK SYS – This system includes an automatic detector system which detects the fire and releases water into the sprinkler. The SF is area protected.
PA System Installed __________SF __________HD ___________COST PA System Removed __________SF __________HD ___________COST Other Info: ___________________Manufacturer
880-217 AFFF PA SPRINKLER SYSTEM – This system is required in all new hangar facilities. The system includes sprinkler system, detection system, underwing nozzles, agent storage and proportioning system but not additional water pumps and/or storage.
The SF is area protected.
Sprinkler System Installed: __________SF___________HD ___________COST Sprinkler System Removed: __________SF___________HD___________COST Other Info: ___________________Manufacturer
880-218 HI-EXPANSION FOAM SYSTEM – This system is found in some hangar facilities and not authorized for use in new hangars. The SF is area protected.
Foam System Installed: __________SF___________HD ___________COST Foam System Removed: ___________SF___________HD ___________COST Other Info: __________________Manufacturer
SECTION 01 11 00.00 40 – PAGE 17
880-221 AUTO FIRE PROTECTION SYSTEM – This system provides for the detection of fire throughout designated areas or in building or structures. The system consists of automatic fire detection devices, circuits or tubing, connected circuitry, control panels, signal indicators and other features as required. The SF is area protected.
Fire System Installed: ___________SF ___________EA ___________COST Fire System Removed: ___________SF ___________EA ___________COST Other Info: __________________Manufacturer
880-222 MANUAL FIRE ALARM SYSTEM – This manual fire and evacuation alarm system is installed to provide means for notifying building occupants of the presence of fire.
Fire Alarm System Installed: ___________EA ___________COST Fire Alarm System Removed: ___________EA ___________COST Other Info: ___________________Manufacturer
880-235 DRY CHEMICAL SYSTEM – Fire suppression system with automatic fire detection capability and automatic discharge of fire suppression agent. This system is normally used for local application but may be used for special hazard total flood systems.
Dry Chemical System Installed: ___________EA ___________COST Dry Chemical System Removed: ___________EA ___________COST
890-144 COMPRESSED AIR DISTR – Identifies the compressed air supply lines to provide air to various buildings of a base-wide compressed air system.
Installed: ___________LF ___________COST Removed: ___________LF ___________COST
890-269 CATHODIC PROTECTION SYSTEM – Identifies a cathodic protection system that is commonly used to prevent corrosion on underground or submerged metallic structures.
Installed: ___________EA ___________COST Removed: ___________EA ___________COST
890-271 EMCS CENTRAL STN - This system is provided for utility plants and utility systems. The central station is used for control and supervision of the complete EMCS. It consists of computers, printers, cathode ray tube, clocks and other necessary features.
Installed: ___________EA ___________COST Removed: ___________EA ___________COST
890-272 EMCS FIELD EQUIPMENT – This system consists of necessary field interface devices, multiplex panels, power supplies, electronic sensors, controls and other features necessary to constitute an EMCS but located in the central station.
SECTION 01 11 00.00 40 – PAGE 18
890-273 EMCS DATA LINKS – Identifies the data transmission system between the central station and the field interface equipment and consists of coaxial cable, twisted pair cable and other features necessary for the transmission of data.
Installed: ___________LF ___________COST Removed: ___________LF ___________COST
STORAGE TANKS:
CAT CODE NOMENCLATURE
123-335 VEHICLE FUELING STATION – Commercial type fueling or which service government owned motor vehicles.
Installed: ________________SF ___________OL ___________COST Removed: ________________SF ___________OL ___________COST
124-134 OPG STOR, DIESEL – Storage tanks required to provide an operating and reserve supply of diesel at Air Force bases.
Installed: ___________GA ___________COST Removed ___________GA ___________COST
124-135 OPG STOR, JET FL – Those storage tanks required to provide an operating and reserve supply of jet fuel at Air Force bases.
Installed: ___________GA ___________COST Removed: ___________GA ___________COST
411-134 STORAGE, DIESEL TANK – This facility is designed for the storage and dispensing of diesel fuel. This facility is usually located at isolated stations when supply levels may be inadequate for mission accomplishment.
Installed: ___________BL ___________GA ___________COST Removed: ___________BL ___________GA ___________COST
411-137 STORAGE, MOGAS TANK – This facility is designed for the storage of motor gasoline.
Installed: ___________BL ___________GA ___________COST Removed: ___________BL ___________GA ___________COST
411-139 STOR, SPECIAL FUELS – This facility is designed for storage of liquid chemicals in bulk.
Installed: ___________BL ___________GA ___________COST Removed: ___________BL ___________GA ___________COST
890-171 MSC STORAGE TANK- Identifies those tanks used for storage of waste petroleum products. Installed: ___________BL ___________GA ___________COST Removed: ___________BL ___________GA ___________COST
AIR CONDITIONERS/AIR HANDLERS:
SECTION 01 11 00.00 40 – PAGE 19
CAT CODE NOMENCLATURE
826-122 A/C PLANT 25-100 TONS - A packaged unit or a unitary air-conditioner consisting of one or more factory-made assemblies which includes an evaporator (cooling coil), a compressor and condenser combination, and may include a heating heat pump) function as well (includes roof-top units. The SF is area served.
Installed: ___________SF ___________TN ___________COST Removed: ___________SF ___________TN ___________COST Other Info: __________________Manufacturer_______Model #________________S/N
826-123 A/C PLANT OVER 100 TONS – A packaged unit or a unitary air-conditioner consisting of one or more factory-made assemblies which includes an evaporator (cooling coil), a compressor and condenser combination, and may include a heating (heat coil) function as well (includes roof-to- units and chillers). The SF is area served.
Installed: ___________SF ___________TN ___________COST Removed: ___________SF ___________TN ___________COST Other Info: ___________________Manufacturer______Model #________________S/N
890-121 A/C PLANT 5 TO 25 TONS – A packaged unit or a unitary air-conditioner consisting of one or more factory-made assemblies which includes an evaporator (cooling coil), a compressor and condenser combination, and may include a heating (heat pump) function as well. The SF is area served.
Installed: ___________SF ___________TN ___________COST Removed: ___________SF ___________TN ___________COST Other Info: ________________Manufacturer _________Model #______________S/N
890-125 A/C PLANT LESS THAN 5 TONS – A unitary air-conditioner consisting of one or more factory-made assemblies which includes an evaporator (cooling coil), a compressor and condenser combination and may include a heating (heat pump) function as well. The SF is area served.
Installed: ___________SF ___________TN ___________COST Removed: ___________SF ___________TN ___________COST Other Info: ________________Manufacturer__________Model #_____________S/N
890-126 A/C WINDOW UNITS – Self-contained single packaged air conditioning unit, complete with compressor, evaporator, fan, and thermostat control and may include a heating function or dehumidification features. These units are mounted in windows or thru wall openings in real property. The SF is area served.
Installed: ___________SF ___________TN ___________COST Removed: ___________SF ___________TN ___________COST Other Info: _________________Manufacturer_________Model #_______________S/N
SECTION 01 11 00.00 40 – PAGE 20
SIGNATURE OF INDIVIDUAL FILLING OUT FORM
COMPANY/TITLE
DATE
AIR FORCE REPRESENTATIVE
TITLE
DATE
-End of section-
SECTION 01 33 00 – PAGE 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal
Contract Clauses "FAR 52.236-5, Material and Workmanship," paragraph (b) and "FAR 52.236-21, Specifications and Drawings for Construction," paragraphs (d), (e), and (f) apply to all "submittals."
1.1.2 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections. Submittals are identified by SD numbers and titles as follows.
SD-01 Preconstruction Submittals
Submittals which are required prior to a notice to proceed on a new contract. Submittals required prior to the start of the next major phase of the construction on a multi-phase contract. Schedules or tabular list of data or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work, submitted prior to contract notice to proceed or next major phase of construction.
Certificates of insurance. Surety bonds. List of proposed subcontractors. List of proposed products. Construction Progress Schedule.
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work. Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project. Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged. Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project. Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD-05 Design Data
SECTION 01 33 00 – PAGE 2
Design calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements.
(Testing must have been within three years of date of contract award for the project.)
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Special requirements necessary to properly close out a construction contract. For example, Record Drawings, manufacturer's help and product lines necessary to maintain and install equipment. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
1.1.3 Approving Authority
Office or designated person authorized to approve submittal.
1.1.4 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.2 SUBMITTALS
At the end of this section is a submittal register (submittal form) showing items of equipment and materials for which submittals are required by the specifications.
1.3 PROCEDURES FOR SUBMITTALS
SECTION 01 33 00 – PAGE 3
1.3.1 Reviewing, Certifying, Approving Authority
The 934th Civil Engineering Division shall be responsible for reviewing and certifying that submittals are in compliance with contract requirements. Approving authority on submittals is the Contracting Officer.
1.3.2 Constraints
a. Submittals listed or specified in this contract shall conform to provisions of this section, unless explicitly stated otherwise.
b. Submittals shall be complete for each definable feature of work; components of definable feature interrelated as a system shall be submitted at same time.
c. When acceptability of a submittal is dependent on conditions, items, or materials included in separate subsequent submittals, submittal will be returned without review.
d. Approval of a separate material, product, or component does not imply approval of assembly in which item functions.
1.3.3 Scheduling
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential requirements to resubmit.
b. Except as specified otherwise, allow a review period, beginning with receipt by approving authority, that includes at least 10 working days for submittals for Contracting Officer approval. Period of review for each resubmittal is the same as for initial submittal.
1.4 FORMAT OF SUBMITTALS
1.4.1 Transmittal Form
APPROVAL MUST BE OBTAINED FROM THE CONTRACTING OFFICER PRIOR TO INITIATING
ANY WORK WHICH INCLUDES MATERIAL FROM THIS LIST. All submittals shall be submitted to the Contracting Officer for approval. All submittals shall be accomplished by the use of the AF IMT 3000. All submittals except warranties and operating instructions, as noted below, shall be furnished for review no later than 10 calendar days after receipt of the Notice to Proceed, or at a time frame specified by the Contracting Officer. All submittals shall be submitted in THREE ORIGINAL COPIES, except for the AF Form 3000. This form will be submitted in one original and two copies with the attachments. The Contracting Officer shall return one copy of the same to the Contractor within 10 calendar days after receipt, or at a time frame specified by the Contracting Officer. The submittal shall be appropriately marked either APPROVED or DISAPPROVED, and may include additional comments. If submittals can not be made within 10 calendar days after receipt of the Notice to Proceed, or within a time frame specified by the Contracting Officer, the Contracting Officer shall be advised of the difficulty and of any extension of the time being requested.
1.4.2 Identifying Submittals
Identify submittals with the following information permanently adhered to or noted on each separate component of each submittal and noted on transmittal form. Mark each copy of each submittal identically, with the following:
a. Project title and location.
b. Construction contract number.
c. Section number of the specification section by which submittal is required.
SECTION 01 33 00 – PAGE 4
d. Submittal description (SD) number of each component of submittal.
e. When a resubmission, add alphabetic suffix on submittal description, for example, SD-10A, to indicate resubmission.
f. Name, address, and telephone number of subcontractor, supplier, manufacturer and any other second tier Contractor associated with submittal.
g. Product identification and location in project.
1.4.3 Format for SD-02 Shop Drawings
a. Shop drawings shall not be less than 8 1/2 by 11 inches nor more than 30 by 42 inches.
b. Present 8 1/2 by 11 inches sized shop drawings as part of the bound volume for submittals required by section. Present larger drawings in sets.
c. Include on each drawing the drawing title, number, date, and revision numbers and dates, in addition to information required in paragraph entitled "Identifying Submittals."
d. Dimension drawings, except diagrams and schematic drawings; prepare drawings demonstrating interface with other trades to scale. Shop drawing dimensions shall be the same unit of measure as indicated on the contract drawings. Identify materials and products for work shown.
e. Drawings shall include the nameplate data, size and capacity. Also include applicable federal, military, industry and technical society publication references.
1.4.4 Format of SD-03 Product Data and SD-08 Manufacturer's Instruction
a. Present product data submittals for each section as a complete, bound volume. Include table of contents, listing page and catalog item numbers for product data.
b. Indicate, by prominent notation, each product which is being submitted; indicate specification section number and paragraph number to which it pertains.
c. Supplement product data with material prepared for project to satisfy submittal requirements for which product data does not exist. Identify this material as developed specifically for project, with information and format as required for submission of SD-07 Certificates.
e. Product data shall include the manufacturer's name, trade name, place of manufacture, and catalog model or number. Submittals shall also include applicable federal, military, industry and technical society publication references. Should manufacturer's data require supplemental information for clarification, the supplemental information shall be submitted as specified for SD-07 Certificates.
f. Where equipment or materials are specified to conform to industry and technical society reference standards of the organizations such as American National Standards Institute (ANSI), ASTM International (ASTM), National Electrical Manufacturer's Association (NEMA), Underwriters Laboratories (UL), and Association of Edison Illuminating Companies (AEIC), submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the Contracting Officer. The certificate shall state that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard.
g. Submit manufacturer's instruction prior to installation.
1.4.5 Format of SD-04 Samples
a. Furnish samples in sizes below, unless otherwise specified or unless the manufacturer has prepackaged samples of approximately same size as specified:
SECTION 01 33 00 – PAGE 5
(1) Sample of Equipment or Device: Full size.
(2) Sample of Materials Less Than 2 by 3 inches: Built up to 8 1/2 by 11 inches.
(3) Sample of Materials Exceeding 8 1/2 by 11 inches: Cut down to 8 1/2 by 11 inches and adequate to indicate color, texture, and material variations.
(4) Sample of Linear Devices or Materials: 10 inch length or length to be supplied, if less than 10 inches. Examples of linear devices or materials are conduit and handrails.
(5) Sample of Non-Solid Materials: Pint. Examples of non-solid materials are sand and paint.
(6) Color Selection Samples: 2 by 4 inches.
b. Samples Showing Range of Variation: Where variations are unavoidable due to nature of the materials, submit sets of samples of not less than three units showing extremes and middle of range.
c. Reusable Samples: Incorporate returned samples into work only if so specified or indicated.
Incorporated samples shall be in undamaged condition at time of use.
d. Recording of Sample Installation: Note and preserve the notation of area constituting sample installation but remove notation at final cleanup of project.
e. When color, texture or pattern is specified by naming a particular manufacturer and style, include one sample of that manufacturer and style, for comparison.
1.4.6 Format of SD-05 Design Data and SD-07 Certificates
a. Provide design data and certificates on 8 1/2 by 11 inches paper. Provide a bound volume for submittals containing numerous pages.
1.4.7 Format of SD-06 Test Reports and SD-09 Manufacturer's Field Reports
a. Provide reports on 8 1/2 by 11 inches paper in a complete bound volume.
b. Indicate by prominent notation, each report in the submittal. Indicate specification number and paragraph number to which it pertains.
1.4.8 Format of SD-01 Preconstruction Submittals and SD-11 Closeout Submittals
a. When submittal includes a document which is to be used in project or become part of project record, other than as a submittal, do not apply Contractor's approval stamp to document, but to a separate sheet accompanying document.
1.5 APPROVED SUBMITTALS
The Contracting Officer's approval of submittals shall not be construed as a complete check, but will indicate only that the general method of construction, materials, detailing and other information are satisfactory. Approval will not relieve the Contractor of the responsibility for any error which may exist.
After submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
1.6 DISAPPROVED SUBMITTALS
The Contractor shall make all corrections required by the Contracting Officer and promptly furnish a corrected submittal in the form and number of copies specified for the initial submittal. If the Contractor considers any correction indicated on the submittals to constitute a change to the contract, a notice in accordance with the Contract Clause "Changes" shall be given promptly to the Contracting Officer.
1.7 WITHHOLDING OF PAYMENT
SECTION 01 33 00 – PAGE 6
Payment for materials incorporated in the work will not be made if required approvals have not been obtained.
1.8 GENERAL
The Contractor shall make submittals as required by the specifications. The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Units of weights and measures used on all submittals shall be the same as those used in the contract drawings. Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Submittals shall include items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders;
samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals. Submittals requiring Government approval shall be scheduled and made prior to the acquisition of the material or equipment covered thereby.