01_QJKL_15-0042-_Statement_of_Work-06262015.pdf
PDF 44 KB Posted
- Attached to
- Repair Floor Tile Bldg 777 Federal contract opportunity
- Solicitation number
- FA6633-15-T0009
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QJKL150042-CORRECTED_-_23July15.pdf | ||
| Drawing.pdf | ||
| Q_ _A.pdf | ||
| Wage_Determination.pdf | ||
| FA6633-15-T0009.doc | DOC document | |
| 02_QJKL_15-0042-Technical_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
REMOVE AND REINSTALL TILE IN BUILDING 777 ON SHOWER FLOORS AND
WALLS(UP TO ~36”), LOCKER ROOM AND RESTROOM FLOORS
SECTION 01100 - SUMMARY OF WORK
01101 Work Included. Provide all labor, materials, supervision, equipment and transportation necessary to perform the work as outlined below. See drawing sheets A-01 through A-02 for the location of each work item, quantities, etc. The work includes the following:
1101.1 Removal
1101.1.1 Remove floor tile and associated cove tile in the locker rooms, restrooms, and showers
1101.1.2 Remove wall tile up to a height of approximately 36” in showers only
1101.2 New Tile
1101.2.1 Install new floor and cove tile and grout in those areas from whence it was removed
1101.2.2 Replace wall tile and grout in those areas from whence it was removed
The above general outline does not limit the work to less than all that is required under the contract documents for a complete and proper project.
01102 Conditions of the Site. The Contractor shall accept the site in the condition it is found.
Conditions shown on the Drawings as existing are the results of on-site surveys and/or existing drawings of work by others and are believed to be reasonably correct. The accuracy of the survey work and/or other drawings is not guaranteed and each contractor shall determine for themselves the amount of work required in connection therewith.
SECTION 01200 – PRICE AND PAYMENT PROCEDURES
01201 Bidding Requirements. The bid shall be submitted on the form provided for this purpose by the
Government. The bid shall be based on the unit prices for each item shown, or lump sum however indicated on the bid form.
01202 Site Visit. All bidders are strongly encouraged to visit the work site prior to submission of their bid. It is the responsibility of the Contractor to perform a thorough site investigation and ascertain any conditions that may affect the work. Coordinate access with the assigned Contract Specialist.
SECTION 01300 – ADMINISTRATIVE REQUIREMENTS
01301 Scheduling of Work. All work is to be scheduled through the contract administrator and coordinated with the project inspector. The Contractor shall also specifically identify any apparent, anticipated or proposed deviation or delays (i.e. long lead items) on the schedule.
Replace Tile in Restrooms, Bldg 777 6/26/2015
01302 Regulations. The Contractor shall comply with all standard and special safety and fire regulations, including those in the Corps of Engineers Safety Manual, the American General Contractors Safety Manual, OSHA, and certain base regulations.
01303 Meeting. Prior to the start of the work, the Contractor may be required to meet with the
Contracting Officer to review specific safety and fire regulations.
01306 Materials requiring submittals are as follows:
SECTION NO /PARAGRAPH/ITEM SUBMITTAL DESCRIPTION:
01101.2 Manufacturer’s Spec Sheet for Tile and Grout
01101.2 Manufacturer’s Samples for Tile and Grout
SECTION 01400 – QUALITY CONTROL
01401 The Contractor shall furnish all material testing and certifications as required by this Contract.
Any expense associated with the use of an independent testing agency, as may be required by this Contract shall be at the sole expense of the Contractor.
01402 Warranties and operating instructions are required to be submitted directly to the Contracting
Officer at the completion of the contract work. Four copies of all warranties and operating instructions shall be provided unless otherwise specified.
01403 The Contractor shall preserve and protect all structures, equipment, pavements and vegetation on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall repair or replace any damage resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. Any repair or replacement shall be accomplished at the expense of the Contractor and to the satisfaction of the Contracting Officer. The work shall be done in such manner and by such means as to not interfere with the Government’s use of the premises beyond that necessary.
SECTION 01500 – CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
01501 Government Occupancy. The Government shall close the building during the demolition phase of the project. Contractor shall complete demolition and cleanup within one business week (5 days). During the installation phase, the Government will occupy areas adjacent to the work site.
Contractor shall schedule and perform the work so as not to interfere with the Government’s operations. The Contractor shall cooperate fully with the Government during construction operations to minimize conflicts and to facilitate Government usage.
01502 Electrical. The Contractor may use electric power at the work area. The Contractor shall not be wasteful of the Government’s power. The Government reserves the right to assess the Contractor for electrical service upon discovery of negligence with respect to this provision. The contractor shall provide such temporary power as necessary for the tools being used. Temporary electrical work shall comply with applicable provision in Article 305 of the National Electrical code as a minimum; comply with any more stringent requirements by authorities having jurisdiction. The Contractor shall remove all temporary electrical facilities upon completion of their use.
01503 Water. The Contractor may use water at the work area. Prevent spillage of water where it may damage in-place old or new work. The Contractor shall not waste water.
01504 Sanitary Facilities. The Contractor will provide two (2) portable restrooms (“porta-potties”) for the duration of the project to be located in the immediate vicinity of the building. The Contractor may use facilities on base. However, any abuse of this privilege will result in it being revoked.
01505 Contractor’s Office. The Contractor is not required to furnish an office.
01506 Temporary Barricades and Fences. The Contractor shall furnish, install, and maintain barricades, cones, warning signs, required for execution of the Contractor’s work and to secure hazardous areas and equipment from the general public or the building occupants.
01507 Removal. Maintain all temporary facilities and controls as long as needed for the safe and proper completion of the work. Remove all such temporary facilities and controls as rapidly as progress of the work will permit or as direct by the Contracting Officer.
01508 Use of Site and Access. Access onto and across the grounds shall be as directed by the
Government. Employee parking shall be as directed by the Contracting Officer. Also, the Government may impose restrictions regarding methods and points of contractor access in order to maintain orderly operation of the facility during the construction period.
SECTION 01600 – MATERIAL AND EQUIPMENT
01601 Materials. Install tile according to manufacturer’s instructions. Contractor must submit tile sample to government for approval before installation.
01602 Grout, Install grout according to manufacturer’s instructions. Contractor must submit grout sample to government for approval before installation.
SECTION 01800 - ENVIRONMENTAL
01804 For the purpose of this section, “Hazardous Material” is defined as any item, chemical, or product for which the manufacturer has prepared a Material Safety Data Sheet (MSDS).
01805 At the completion of work, the Contractor shall remove all used, partially used and unused amounts of hazardous excess construction material from Government Property. This does not include any surplus material required for potential/future repair, as outlined and defined in an applicable Section. These materials must be turned over to the Contracting Officer for proper classification and storage.
01806 The Contractor shall be responsible for proper disposal of all used or partially used hazardous material unless otherwise noted in other sections of the specifications. Disposal shall be in compliance with all applicable federal, state, and local regulations. Disposal shall not occur on Government property.
01807 Solid Waste (Non-Hazardous). The Contractor is required to recycle construction/demolition waste and debris as identified in Section 1802. For solid waste that is not recycled, the Contractor shall provide documentation of the weight and the method of disposal (i.e. landfill, incineration, energy recovery, etc.) to the Contracting Officer within five (5) days of delivering the solid waste for disposal. Documentation shall be in the form of a certified weight receipt and a certificate of disposal from the disposal facility. The certificate of disposal shall clearly identify the type of waste disposed, origin of the waste (i.e. project name, number, and building number), weight, location and method of disposal, name of waste hauler, and the date and time of delivery.
Any scrap containing lead such as lead-shielded cable, and electronic equipment such as printed circuit boards, shall be coordinated with the 934 AW Environmental Division before recycling/disposal.
SECTION 01810 - HAZARD MATERIAL USAGE
01811 Hazardous Material is defined as any item or chemical, which is a “health hazard” or “physical hazard” as defined by OSHA in 29 CFR 1910.1200 which include the following:
01811.1: Chemicals which are carcinogens, toxic or highly toxic agents, reproductive toxins, irritants, corrosives, sensitizers, hepatotoxins, nephrotoxins, neurotoxins, agents which act on the hematopoietic system, and agents which damage the lungs, skin, eyes, or mucous membranes;
01811.2: Chemicals, which are combustible liquids, compressed gases, explosives, flammable liquids, flammable solids, organic peroxides, oxidizers, pyrophorics, unstable (reactive) or water-reactive;
01811.3: Chemicals, which in the course of normal handling, use, or storage operations may produce or release dusts, gases, fumes, vapors, mists or smoke which have any of the above characteristics.
01812 The Government requires the identification and accurate tracking of all hazardous materials used for work performed on Government property. Such data is required strictly for federal, state and local environmental regulatory reporting purposes only. Furthermore, the Government shall not employ data on the quantities of hazardous materials used by the Contractor for purposes of evaluating the Contractor’s performance under this contract.
01814 The Contractor shall maintain a copy of the up-to-date MSDS for each hazardous material stored or used on Government property by Contractor personnel. The MSDSs must be readily accessible by the Contractor personnel. Storage, handling and use of all hazardous materials during the performance of work under this contract must be conducted in full compliance with all applicable federal, state and local environmental, health and safety regulations. The Contractor shall be fully responsible for ensuring the compliance with all such regulations.
01815 The Contractor shall be fully responsible for the cleanup and disposal of all spilled materials, whether or not the material is a hazardous material, including all materials used to absorb and contain such spills. For spills other than very small spills that obviously pose no immediate threat to the environment, health or safety, the Contractor shall contact the installation’s Security Police at x1911 if using a Government phone, or 612-713-1911 if using a cellular phone.
01817 At the completion of work, the Contractor shall remove all empty hazardous material containers, partially used and unused amounts of hazardous material from Government property. Under no circumstances shall any remaining hazardous material be turned over to any representative of the Government without prior approval of the Contracting Officer and the base Hazardous Material Management Team.
01818 The Contractor shall be responsible for proper disposal of all used or partially used hazardous material and all hazardous waste generated under the performance of the contract unless otherwise noted in other sections of the specifications. Disposal shall be conducted in compliance with all applicable federal, state and local regulations and shall not occur on Government property.
SECTION 01820 - HAZARD MATERIAL DEFINITION
01821 Any item or chemical, which is a “health hazard” or “physical hazard” as defined by OSHA in 29
CFR 1910.1200, which includes the following:
01821.1: Chemicals which are carcinogens, toxic or highly toxic agents, reproductive toxins, irritants, corrosives, sensitizers, hepatotoxins, nephrotoxins, neurotoxins, agents which act on the hematopoietic system, and agents which damage the lungs, skin, eyes, or mucous membranes;
01821.2: Chemicals, which are combustible liquids, compressed gases, explosives, flammable liquids, flammable solids, organic peroxides, oxidizers, pyrophorics, unstable (reactive) or water-reactive;
01821.3: Chemicals, which in the course of normal handling, use, or storage operations may produce or release dusts, gases, fumes, vapors, mists or smoke which have any of the above characteristics.
01822 Any item or chemical which is reportable or potentially reportable or is notifiable as inventory under the reporting requirements of the Hazardous Chemical Reporting (40 CFR Part 370), or as an environmental release under the reporting requirements of the Toxic Chemical Release Reporting: Community Right To Know (40 CFR Part 372), which includes the following:
01822.1: Chemicals with special characteristics which in the opinion of the manufacturer can cause harm to people, plants, or animals when released by spilling, leaking, pumping, pouring, emitting, emptying, discharging, injecting, escaping, leaching, dumping, or disposing into the environment (including the abandonment or discarding of barrels, containers, and other receptacles).
01824 In general, any liquid or solid chemical and gaseous item will be included in the pharmacy program. Structural components (such as roof paper and flashing) are not included. Also, items that contain sealed fluids (such as compressors, etc.) are not included. We also do not track gas, diesel, jet fuel, or other vehicle fuels.
SECTION 01840 - AIR FORCE AFFIRMATIVE PROCUREMENT PROGRAM
01841 Executive Order 13101, dated September 14, 1998, requires that the Federal Government assume leadership in making efficient use of natural resources through the acquisition of items made with recovered materials. The Governments’ policy is to acquire, in a cost-effective manner, items composed of the highest percentage of recovered materials practical, consistent with maintaining a satisfactory level of competition without adversely affecting performance requirements or exposing supplier’s employees to undue hazards from the recovered materials.
01843 Executive Order 13221, dated July 31, 2001 requires that the Federal Government utilize Energy Efficient Standby Power Devices. Each agency, when it purchases commercially available, off-the-shelf products that use external standby power devices, or that contain an internal standby power function, shall purchase products that use no more than one watt in their standby power consuming mode. If such products are not available, agencies shall purchase products with the lowest standby power wattage while in their standby power consuming mode. Agencies shall adhere to these requirements, when life-cycle cost-effective and practicable and where the relevant product's utility and performance are not compromised as a result. By December 31, 2001, and on an annual basis thereafter, the Department of Energy, in consultation with the Department of Defense and the General Services Administration, shall compile a preliminary list of products to be subject to these requirements. The Department of Energy shall finalize the list and may remove products deemed inappropriate for listing.
END OF STATEMENT OF WORK
SECTION 01600 – MATERIAL AND EQUIPMENT