Technical_Specifications.pdf

PDF 261 KB Posted

Attached to
Construct Motorcycle Pad, Bldg 821 Federal contract opportunity
Solicitation number
FA6633-15-T0007
Issued by
Department of the Air Force Reserve Command

About this file

Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Construct Motorcycle Pad, Bldg 821, newest first.
File Type Posted
Amendment_0001 _FA6633-15-T0007.doc DOC document
Wage_Determination_MN130.doc DOC document
Wage_Determination.pdf PDF
FA6633-15-T0007 _Motorcycle_Pad_B821.doc DOC document
Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL SPECIFICATIONS

934 Airlift Wing Minneapolis – St. Paul Air Reserve Station

Minneapolis, MN 55450-2100

Project No. QJKL 15-0043

CONSTRUCT MOTORCYCLE PAD, BUILDING 821

934th Civil Engineering 760 Military Highway, Building 744

Minneapolis, MN 55450

FEBRUARY 2015

QJKL 15-0043

Construct Motorcycle Pad, Building 821

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00.00 40 SUMMARY OF WORK

01 33 00 SUBMITTAL PROCEDURES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 30 00.00 20 CAST-IN-PLACE CONCRETE

DIVISION 31 - EARTHWORK

31 23 00.00 20 EXCAVATION AND FILL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 16 AGGREGATE BASE COURSE

32 16 13 CURBS AND GUTTERS

32 17 24.00 10 PAVEMENT MARKINGS

32 32 23 SEGMENTAL CONCRETE BLOCK RETAINING WALL

32 92 19 SEEDING

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION 01 11 00.00 40

SUMMARY OF WORK

02/15

PART 1 GENERAL

1.1 NOT USED

1.2 DESCRIPTION OF WORK

The scope of this project is to furnish all plant, labor, materials, and equipment and performing all work for Construct Motorcyle Pad, Building 821.

1.3 CONTRACT DRAWINGS AND SPECIFICATIONS

1.3.1 1.3.1 SETS FURNISHED

The Contractor shall check be responsible for making copies of specifications including amendments. The bid drawings as amended shall be utilized in the performance of the work the contract drawings (i.e., bid drawings that have been posted with all amendment changes) are provided to the contractor. See the paragraph below for contract drawing and distribution requirements. The work shall conform to the contract drawings, set out in the drawing index, all of which form a part of these specifications. The work shall also conform to any standard details bound or referenced herein.

1.3.2 NOTIFICATIONS OF DISCREPANCIES

The Contractor shall check all drawing files furnished him immediately upon their receipt and shall promptly notify the Contracting Officer of any discrepancies. Dimensions marked on drawings shall be followed in lieu of scale measurements. Enlarged plans and details shall govern where the same work is shown at smaller scales. All scales shown are based on a standard drawing size of 24" x 36". If any other size drawings are furnished or plotted the contractor shall adjust the scales accordingly. The Contractor shall also advise sub-contractors of the above. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have been avoided thereby.

1.3.3 OMISSIONS

Omissions from the drawings or specifications or the mis-description of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or mis-described details of the work and will be responsible for any errors which might have been avoided thereby.

1.4 NOT USED

1.5 NOT USED

1.6 REGULATIONS

The Contractor shall comply with all standard and special safety and fire regulations, including those in the Corps of Engineers Safety Manual, the

SECTION 01 11 00.00 40 Page 1

American General Contractors Safety Manual, OSHA, and certain base regulations. Prior to the start of the work, the Contractor may be required to meet with the Contracting Officer to review specific safety and fire regulations.

1.7 TESTING

The contractor shall furnish all material testing and certifications as required by this contract. Any expense associated with the use of an independent testing agency, as may be required by this contract shall be provided unless otherwise specified.

1.8 WARRANTIES AND OPERATING INSTRUCTIONS

Warranties and operating instructions are required to be submitted directly to the Contracting Officer at the completion of the contract work. Four copies of all warranties and operating instructions shall be provided unless otherwise specified.

1.9 GOVERNMENT OCCUPANCY

The Government will occupy areas adjacent to the work site during construction. Contractor shall schedule and perform the work so as not to interfere with the Government's operations. The Contractor shall cooperate fully with the Government during construction operations to minimize conflicts and to facilitate Government usage.

1.10 BASE HOURS

Base operation hours are 7:00 a.m. to 5:00 p.m. daily (Monday through Friday), excluding federal holidays. Access to the base during other times must be requested in writing from the Contracting Officer and will be granted only for extenuating circumstances.

1.11 BASE ACCESS

Access onto and across the grounds shall be as directed by the Government.

Employee parking shall be as directed by the Contracting Officer. Also, the Government may impose restrictions regarding methods and points of contractor access in order to maintain orderly operation of the facility during the construction period.

1.12 TEMPORARY BARRICADES AND FENCES

The Contractor shall furnish, install, and maintain barricades and signage required for execution of the Contractor's work and to secure hazardous areas and equipment from the general public or the building occupants.

Maintain all temporary facilities and controls as long as needed for the safe and proper completion of the work. Remove all such temporary facilities and controls as rapidly as progress of the work will permit or as directed by the Contracting Officer.

1.13 TEMPORARY CONSTRUCTION FACILITIES

1.13.1 Contractor Office

An office trailer is not required for this project. However, if the Contractor decides to utilize an office trailer at the project site, its

SECTION 01 11 00.00 40 Page 2 location shall approved by the Contracting Officer.

1.13.2 Not Used

1.14 AVAILABILITY OF UTILITY SERVICES

The Contractor may use Government utilities in the vicinity of the project area. The Contractor shall not be wasteful of the Government utilities and the Government reserves the right to assess the Contractor for utility use upon discovery of negligence with respect to utility usage. All temporary lines shall be maintained by the Contractor in a workmanlike manner satisfactory to the Contracting Officer and shall be removed by the Contractor in like manner prior to final acceptance of the construction.

1.15 UTILITY SERVICE INTERRUPTIONS

The Contractor shall submit written notification not less than 15 calendar days in accordance of each interruption of each utility and communication service to or within existing buildings and facilities being used by others. No single outage will exceed 4 hours unless approved in writing.

The time and duration of all outages will be coordinated and approved with the using agency by the Contracting Officer.

1.16 PERMITS

1.16.1 Digging Permit

To ensure personnel safety and utility safety when work is to be done below grade, it is the responsibility of the Contractor to obtain an on-base (AF

103) digging permit and a GOPHER ONE digging permit. For an on-base digging permit the Contractor shall provide the Contracting Officer with not less than 10 calendar days written notice of the intent to perform digging or excavation work to allow the Government the opportunity to locate and mark its utilities which may interfere with the proposed work.

For a GOPHER ONE digging permit, the Contractor shall follow standard Minnesota State procedures.

1.16.2 Not Used

1.16.3 Not Used

1.16.4 Not Used

1.17 PROTECTION OF FACILITIES

The Contractor shall preserve and protect all structures, equipment, pavements and vegetation on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall repair or replace any damage resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. Any repair or replacement shall be accomplished at the expense of the Contractor and to the satisfaction of the Contracting Officer.

1.18 Not Used

PART 2 PRODUCTS

Not Used

SECTION 01 11 00.00 40 Page 3

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 11 00.00 40 Page 4

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES

QJKL 15-0043 Construct Motorcyle Pad Building 821

03 30 00.00 20 SD-03 Product Data 2.3.5Materials for curing concrete 2.3.6Joint filler 2.3.1Cement

SD-05 Design Data 2.2.1mix design

SD-06 Test Reports 1.6.1.1Concrete mix design 3.8.2.2Compressive strength tests 3.8.2.3Air Content

31 23 00.00 20 SD-06 Test Reports 3.11.2.1Fill and backfill 3.11.2.2Select material 3.11.2.3Density tests 3.11.2.4Moisture Content Tests

32 11 16 SD-03 Product Data 1.4Equipment

Waybills and Delivery Tickets SD-05 Design Data

3.4Construction Staking Drawing SD-06 Test Reports

1.6Sampling and Testing 1.6.2.4Field Density Tests

32 16 13 SD-03 Product Data 2.1Concrete

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES

QJKL 15-0043 Construct Motorcyle Pad Building 821

32 16 13 3.8Field Quality Control 32 17 24.00 10 SD-03 Product Data

1.2Equipment 1.4.1Qualifications

SD-06 Test Reports 2.3Sampling and Testing

32 32 23 SD-02 Shop Drawings Shop Drawings

SD-03 Product Data 1.5.1Components and Equipment 1.5.2Supplier Qualifications 1.5.3Manufacturer's Representative

SD-04 Samples 2.1Segmental Concrete Units

32 92 19 SD-03 Product Data 2.4Fertilizer

SD-06 Test Reports 2.2.3Topsoil composition tests

SD-07 Certificates 2.1seed.

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SECTION 01 33 00

SUBMITTAL PROCEDURES

02/15

PART 1 GENERAL

1.1 DEFINITIONS

1.1.1 Submittal

Contract Clauses "FAR 52.236-5, Material and Workmanship," paragraph (b) and "FAR 52.236-21, Specifications and Drawings for Construction," paragraphs (d), (e), and (f) apply to all "submittals."

1.1.2 Submittal Descriptions (SD)

Submittals requirements are specified in the technical sections.

Submittals are identified by SD numbers and titles as follows.

SD-02 Shop Drawings

Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.

Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.

Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.

SD-03 Product Data

Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.

Samples of warranty language when the contract requires extended product warranties.

SD-04 Samples

Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.

Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.

Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.

SECTION 01 33 00 Page 1

SD-05 Design Data

Design calculations, mix designs, analyses or other data pertaining to a part of work.

SD-06 Test Reports

Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)

Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.

Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.

SD-07 Certificates

Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.

Document required of Contractor, or of a manufacturer, supplier, installer or subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.

Confined space entry permits.

Text of posted operating instructions.

1.1.3 Approving Authority

Office or designated person authorized to approve submittal.

1.1.4 Work

As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.

1.2 SUBMITTALS

At the end of this section is a submittal register (submittal form) showing items of equipment and materials for which submittals are required by the specifications.

SECTION 01 33 00 Page 2

1.3 PROCEDURES FOR SUBMITTALS

1.3.1 Reviewing, Certifying, Approving Authority

The 934th Civil Engineering Division and/or a designated Architect-Engineer firm shall be responsible for reviewing and certifying that submittals are in compliance with contract requirements. Approving authority on submittals is the Contracting Officer.

1.3.2 Constraints

a. Submittals listed or specified in this contract shall conform to provisions of this section, unless explicitly stated otherwise.

b. Submittals shall be complete for each definable feature of work;

components of definable feature interrelated as a system shall be submitted at same time.

c. When acceptability of a submittal is dependent on conditions, items, or materials included in separate subsequent submittals, submittal will be returned without review.

d. Approval of a separate material, product, or component does not imply approval of assembly in which item functions.

1.3.3 Scheduling

a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential requirements to resubmit.

b. Except as specified otherwise, allow a review period, beginning with receipt by approving authority, that includes at least 10 working days for submittals for Contracting Officer approval.

Period of review for each resubmittal is the same as for initial submittal.

1.4 FORMAT OF SUBMITTALS

1.4.1 Transmittal Form

APPROVAL MUST BE OBTAINED FROM THE CONTRACTING OFFICER PRIOR TO INITIATING

ANY WORK WHICH INCLUDES MATERIAL FROM THIS LIST. All submittals shall be submitted to the Contracting Officer for approval. All submittals shall be accomplished by the use of the AF 3000. All submittals except warranties and operating instructions, as noted below, shall be furnished for review no later than 10 calendar days after receipt of the Notice to Proceed, or at a time frame specified by the Contracting Officer. The Contracting Officer shall return the AF 3000 to the Contractor within 10 calendar days after receipt, or at a time frame specified by the Contracting Officer.

The submittal shall be appropriately marked either APPROVED or DISAPPROVED, and may include additional comments. If submittals can not be made within 10 calendar days after receipt of the Notice to Proceed, or within a time frame specified by the Contracting Officer, the Contracting Officer shall be advised of the difficulty and of any extension of the time being requested.

SECTION 01 33 00 Page 3

1.4.2 Identifying Submittals

Identify submittals with the following information permanently adhered to or noted on each separate component of each submittal and noted on transmittal form. Mark each copy of each submittal identically, with the following:

a. Project title and location.

b. Construction contract number.

c. Section number of the specification section by which submittal is required.

d. Submittal description (SD) number of each component of submittal.

e. When a resubmission, add alphabetic suffix on submittal description, for example, SD-10A, to indicate resubmission.

f. Name, address, and telephone number of subcontractor, supplier, manufacturer and any other second tier Contractor associated with submittal.

g. Product identification and location in project.

1.4.3 Format for SD-02 Shop Drawings

a. Shop drawings shall not be less than 8 1/2 by 11 inches nor more than 30 by 42 inches and shall be submitted digitally as PDF file.

b. Not used.

c. Include on each drawing the drawing title, number, date, and revision numbers and dates, in addition to information required in paragraph entitled "Identifying Submittals."

d. Dimension drawings, except diagrams and schematic drawings;

prepare drawings demonstrating interface with other trades to scale. Shop drawing dimensions shall be the same unit of measure as indicated on the contract drawings. Identify materials and products for work shown.

e. Drawings shall include the nameplate data, size and capacity.

Also include applicable federal, military, industry and technical society publication references.

1.4.4 Format of SD-03 Product Data and SD-08 Manufacturer's Instruction

a. Present product data submittals for each section as a complete single volume; submitted digitally as a PDF file. Include table of contents, listing page and catalog item numbers for product data.

b. Indicate, by prominent notation, each product which is being submitted; indicate specification section number and paragraph number to which it pertains.

c. Supplement product data with material prepared for project to satisfy submittal requirements for which product data does not

SECTION 01 33 00 Page 4 exist. Identify this material as developed specifically for project, with information and format as required for submission of SD-07 Certificates.

e. Product data shall include the manufacturer's name, trade name, place of manufacture, and catalog model or number. Submittals shall also include applicable federal, military, industry and technical society publication references. Should manufacturer's data require supplemental information for clarification, the supplemental information shall be submitted as specified for SD-07 Certificates.

f. Where equipment or materials are specified to conform to industry and technical society reference standards of the organizations such as American National Standards Institute (ANSI), ASTM International (ASTM), National Electrical Manufacturer's Association (NEMA), Underwriters Laboratories (UL), and Association of Edison Illuminating Companies (AEIC), submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the Contracting Officer. The certificate shall state that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard.

g. Submit manufacturer's instruction prior to installation.

1.4.5 Format of SD-04 Samples

a. Furnish samples in sizes below, unless otherwise specified or unless the manufacturer has prepackaged samples of approximately same size as specified:

(1) Sample of Equipment or Device: Full size.

(2) Sample of Materials Less Than 2 by 3 inches: Built up to 8 1/2 by 11 inches.

(3) Sample of Materials Exceeding 8 1/2 by 11 inches: Cut down to 8 1/2 by 11 inches and adequate to indicate color, texture, and material variations.

(4) Sample of Linear Devices or Materials: 10 inch length or length to be supplied, if less than 10 inches. Examples of linear devices or materials are conduit and handrails.

(5) Sample of Non-Solid Materials: Pint. Examples of non-solid materials are sand and paint.

(6) Color Selection Samples: 2 by 4 inches.

b. Samples Showing Range of Variation: Where variations are unavoidable due to nature of the materials, submit sets of samples of not less than three units showing extremes and middle of range.

c. Reusable Samples: Incorporate returned samples into work only if so specified or indicated. Incorporated samples shall be in

SECTION 01 33 00 Page 5 undamaged condition at time of use.

d. Recording of Sample Installation: Note and preserve the notation of area constituting sample installation but remove notation at final clean up of project.

e. When color, texture or pattern is specified by naming a particular manufacturer and style, include one sample of that manufacturer and style, for comparison.

1.4.6 Format of SD-05 Design Data and SD-07 Certificates

a. Provide design data and certificates digitally as a PDF file.

1.4.7 Format of SD-06 Test Reports and SD-09 Manufacturer's Field Reports

a. Provide reports digitally as a PDF file.

b. Indicate by prominent notation, each report in the submittal.

Indicate specification number and paragraph number to which it pertains.

1.5 APPROVED SUBMITTALS

The Contracting Officer's approval of submittals shall not be construed as a complete check, but will indicate only that the general method of construction, materials, detailing and other information are satisfactory.

Approval will not relieve the Contractor of the responsibility for any error which may exist. After submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

1.6 DISAPPROVED SUBMITTALS

The Contractor shall make all corrections required by the Contracting Officer and promptly furnish a corrected submittal in the form and number of copies specified for the initial submittal. If the Contractor considers any correction indicated on the submittals to constitute a change to the contract, a notice in accordance with the Contract Clause "Changes" shall be given promptly to the Contracting Officer.

1.7 WITHHOLDING OF PAYMENT

Payment for materials incorporated in the work will not be made if required approvals have not been obtained.

1.8 GENERAL

The Contractor shall make submittals as required by the specifications.

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Units of weights and measures used on all submittals shall be the same as those used in the contract drawings. Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Submittals shall include items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders;

SECTION 01 33 00 Page 6 samples; O&M manuals (including parts list); certifications; warranties;

and other such required submittals. Submittals requiring Government approval shall be scheduled and made prior to the acquisition of the material or equipment covered thereby. Samples remaining upon completion of the work shall be picked up and disposed of in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.

1.9 SCHEDULING

Submittals covering component items forming a system or items that are interrelated shall be scheduled to be coordinated and submitted concurrently. Certifications to be submitted with the pertinent drawings shall be so scheduled. Adequate time shall be allowed.

1.10 TRANSMITTAL FORM (AF 3000)

The sample transmittal form (AF 3000) attached to this section shall be used for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms will be furnished to the Contractor. This form shall be properly completed by filling out all the heading blank spaces and identifying each item submitted. Special care shall be exercised to ensure proper listing of the specification paragraph and/or sheet number of the contract drawings pertinent to the data submitted for each item.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 33 00 Page 7

Form Approved MATERIAL APPROVAL SUBMITTAL OMB No 9000-0062

(See Instructions on Reverse) Expires May 31, 2005

UDIIC repD Ing Dureen Dr lOIS cOllec Ion 0 In orma Ion IS es Irna eo 0 average "uffilnU es per response, inC uOlng me Ime or reviewing inS ruc Ions, searcnlng eXls Ing oa a sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCP, 1060 Air Force Pentagon, Washington DC

DATE (VYYYMMDD)FROM: (Contractor)TO: (Contracting Officer)

SUBMISSION NUMBER SUBMITTALCONTRACT NUMBER

NEW RESUBMITTALD D

PREVIOUS SUBMISSION NUMBER IPROJECT NUMBER

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

DESCRIPTION OF MATERIAL AP DISAPSPECIFICATION SECTIONI SEEITEM

INITIALPROVEDPROVED REVERSE(Include Type, Model Number, Catalog Number, Mfg., etc.) PARA NO.lDRAWING NO.NO.

D D D

D D D

D D D

D D D

D D D

D D D

DD D

D D D

D D D

D D D

D D D

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.

TYPE OR PRINT NAME AND TITLEDATE (VYVYMMDD) ISIGNATURE

FOR GOVERNMENT USE ONLY

TO: (Base Civil Engineering Officer)

For Evaluation and Action

TYPE OR PRINT NAME AND GRADEDATE (YYYYMMDD) ISIGNATURE

TO: (AF Contracting Office)

I I APPROVAL I I I DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSERECOMMEND

TYPE OR PRINT NAME AND GRADEDATE (YYVYMMDD) ISIGNATURE

TO: (Contractor)

DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUEST

APPROVEDD D

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN DAYS OF DATE SHOWN BELOW.

TYPE OR PRINT NAME AND GRADEDATE (YYYYMMDD) ISIGNATURE

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE.

COMMENTS

(Number to correspond with applicable Item Number on reverse) work required by the contract.

2.

4.

5.

officer under the terms of this contract.

INSTRUCTIONS TO CONTRACTORS

1. The term "material· is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the

This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.

Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No. ". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting

AF IMT 3000, 20030901, V1 (REVERSE)

SECTION 01 42 00

SOURCES FOR REFERENCE PUBLICATIONS

07/06

PART 1 GENERAL

1.1 REFERENCES

Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization, (e.g. ASTM B 564 Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.

1.2 ORDERING INFORMATION

The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided. Documents listed in the specifications with numbers which were not assigned by the standards producing organization should be ordered from the source by title rather than by number.

ACI INTERNATIONAL (ACI)

38800 Country Club Drive Farmington Hills, MI 48331 Ph: 248-848-3700 Fax: 248-848-3701 E-mail: bkstore@concrete.org Internet: http://www.concrete.org

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

444 North Capital Street, NW, Suite 249 Washington, DC 20001 Ph: 202-624-5800 Fax: 202-624-5806 E-Mail: info@aashto.org Internet: http://www.aashto.org

AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)

1800 East Oakton Street Des Plaines, IL 60018-2187 Ph: 847-699-2929 Fax: 847-768-3434 E-mail: customerservice@asse.org Internet: http://www.asse.org

ASTM INTERNATIONAL (ASTM)

100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 610-832-9500 Fax: 610-832-9555

SECTION 01 42 00 Page 1

E-mail: service@astm.org Internet: http://www.astm.org

U.S. ARMY CORPS OF ENGINEERS (USACE)

Order CRD-C DOCUMENTS from:

U.S. Army Engineer Waterways Experiment Station ATTN: Technical Report Distribution Section, Services Branch, TIC 3909 Halls Ferry Road Vicksburg, MS 39180-6199 Ph: 601-634-2664 Fax: 601-634-2388 E-mail: mtc-info@erdc.usace.army.mil Internet: http://www.wes.army.mil/SL/MTC/handbook.htm

Order Other Documents from:

USACE Publications Depot Attn: CEHEC-IM-PD 2803 52nd Avenue Hyattsville, MD 20781-1102 Ph: 301-394-0081 Fax: 301-394-0084 E-mail: pubs-army@usace.army.mil Internet: http://www.usace.army.mil/publications or http://www.hnd.usace.army.mil/techinfo/engpubs.htm

U.S. DEPARTMENT OF AGRICULTURE (USDA)

Order AMS Publications from:

AGRICULTURAL MARKETING SERVICE (AMS)

Seed Regulatory and Testing Branch 801 Summit Crossing Place, Suite C Gastonia, NC 28054-2193 Ph: 704-810-8870 Fax: 704-852-4189 Internet: http://www.ams.usda.gov/lsg/seed.htm E-mail: seed.ams@usda.gov

Order Other Publications from:

U.S. Department of Agriculture, Rural Utilities Service 14th and Independence Avenue, SW, Room 4028-S Washington, DC 20250 Ph: 202-720-2791 Fax: 202-720-2166 Internet: http://www.usda.gov/rus

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

General Services Administration 1800 F Street, NW Washington, DC 20405 Ph: 202-501-1021 Internet: www.GSA.gov

Order from:

General Services Administration Federal Supply Service Bureau 1941 Jefferson Davis Highway Arlington, VA 22202 Ph: 703-605-5400 Internet: http://apps.fss.gsa.gov/pub/fedspecs/index.cfm

SECTION 01 42 00 Page 2

- - - - - Commercial Item Description Documents - - - - -

SECTION 01 42 00 Page 3

SECTION 02 41 00

DEMOLITION

02/15

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO M 145 (1991; R 2004) Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes

AASHTO T 180 (2001; R 2004) Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and an 457-mm (18-in) Drop

AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)

ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition Operations

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2003) Safety -- Safety and Health Requirements

1.2 GENERAL REQUIREMENTS

Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. The work of this section is to be performed in a manner that maximizes salvage and recycling of materials. Remove rubbish and debris from the project site.The work includes demolition, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.

1.3 NOT USED

1.4 REGULATORY AND SAFETY REQUIREMENTS

Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSE/SAFE A10.6.

SECTION 02 41 00 Page 1

1.4.1 Not Used

1.5 DUST AND DEBRIS CONTROL

Prevent the spread of dust and debris and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Sweep pavements as often as necessary to control the spread of debris that may result in foreign object damage potential to aircraft.

1.6 PROTECTION

1.6.1 Traffic Control Signs

Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Notify the Contracting Officer prior to beginning such work.

1.6.2 Existing Conditions Documentation

Before beginning any demolition work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 4 inch will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document.

1.6.3 Items to Remain in Place

Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer.

Coordinate the work of this section with all other work indicated.

Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. Do not overload pavements to remain. Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.

1.6.4 Existing Construction Limits and Protection

Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove dust, dirt, and debris from work areas daily.

SECTION 02 41 00 Page 2

1.6.5 Utility Service

Maintain existing utilities indicated to stay in service and protect against damage during demolition and deconstruction operations.

1.6.6 Facilities

Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract.

1.6.7 Protection of Personnel

Before, during and after the demolition work the Contractor shall continuously evaluate the condition of the structure being demolished and take immediate action to protect all personnel working in and around the project site. No area, section, or component of floors, roofs, walls, columns, pilasters, or other structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.

1.7 BURNING

The use of burning at the project site for the disposal of refuse and debris will not be permitted.

1.8 FOREIGN OBJECT DAMAGE (FOD)

Aircraft and aircraft engines are subject to FOD from debris and waste material lying on airfield pavements. Remove all such materials that may appear on operational aircraft pavements due to the Contractor's operations. If necessary, the Contracting Officer may require the Contractor to install a temporary barricade at the Contractor's expense to control the spread of FOD potential debris. The barricade must include a fence covered with a fabric designed to stop the spread of debris. Anchor the fence and fabric to prevent displacement by winds or jet/prop blasts.

Remove barricade when no longer required.

1.9 REQUIRED DATA

Prepare a Demolition Plan. Include in the plan a detailed description of methods and equipment to be used for each operation and of the sequence of operations. Provide procedures for safe conduct of the work in accordance with EM 385-1-1. Plan shall be approved by Contracting Officer prior to work beginning.

1.10 ENVIRONMENTAL PROTECTION

Comply with the Environmental Protection Agency requirements specified.

1.11 USE OF EXPLOSIVES

Use of explosives will not be permitted.

SECTION 02 41 00 Page 3

PART 2 PRODUCTS

2.1 FILL MATERIAL

Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill voids, depressions or excavations resulting from demolition of structures or pavement.

Fill material must conform to the definition of satisfactory soil material as defined in AASHTO M 145, Soil Classification Groups A-1, A-2-4, A-2-5 and A-3. In addition, fill material must be free from roots and other organic matter, trash, debris, frozen materials, and stones larger than 2 inches in any dimension.

Proposed fill material must be sampled and tested by an approved soil testing laboratory, as follows:

Soil classification AASHTO M 145

Moisture-density relations AASHTO T 180, Method B or D

PART 3 EXECUTION

3.1 Utilities and Related Equipment

3.1.1 General Requirements

Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition or deconstruction work until all utility disconnections have been made.

Shut off and cap utilities for future use, as indicated.

3.2 Paving and Slabs

Remove sawcut concrete and asphaltic concrete paving and slabs including aggregate base as indicated to a depth of 18 inches below new finish grade. Provide neat sawcuts at limits of pavement removal as indicated.

3.3 CONCURRENT EARTH-MOVING OPERATIONS

Do not begin excavation, filling, and other earth-moving operations that are sequential to demolition or deconstruction work in areas occupied by structures to be demolished or deconstructed until all demolition and deconstruction in the area has been completed and debris removed. Fill holes and other hazardous openings.

3.4 DISPOSITION OF MATERIAL

3.4.1 Title to Materials

Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting

SECTION 02 41 00 Page 4 from demolition and deconstruction, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition, and removal procedures, and authorization by the Contracting Officer to begin demolition and deconstruction. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.

3.4.2 Unsalvageable and Non-Recyclable Material

Dispose of unsalvageable and non-recyclable noncombustible material in the disposal area located off site. The fill in the disposal area must remain below elevation and after disposal is completed, the disposal area must be uniformly graded to drain.

3.5 CLEANUP

Remove debris and rubbish from excavations. Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas.

Follow all/any local regulations regarding hauling and disposal.

3.6 DISPOSAL OF REMOVED MATERIALS

3.6.1 Burning on Government Property

Burning of materials removed from demolished and deconstructed structures will not be permitted on Government property.

3.6.2 Removal to Spoil Areas on Government Property

Transport noncombustible materials removed from demolition and deconstruction structures to designated spoil areas on Government property.

3.6.3 Removal from Government Property

Transport waste materials removed from demolished and deconstructed structures, except waste soil, from Government property for legal disposal. Dispose of waste soil as directed.

3.7 REUSE OF SALVAGED ITEMS

Recondition salvaged materials and equipment designated for reuse before installation. Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.

SECTION 02 41 00 Page 5

SECTION 03 30 00.00 20

CAST-IN-PLACE CONCRETE

02/15

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ACI INTERNATIONAL (ACI)

ACI 211.1 (1991; R 2002) Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete

ACI 301 (2005) Specifications for Structural Concrete

ACI 302.1R (2004; Errata 2006; Errata 2007) Guide for Concrete Floor and Slab Construction

ACI 304R (2000) Guide for Measuring, Mixing, Transporting, and Placing Concrete

ACI 305R (1999; Errata 2006) Hot Weather Concreting

ACI 306.1 (1990; R 2002) Standard Specification for Cold Weather Concreting

ACI 347 (2004) Guide to Formwork for Concrete

ASTM INTERNATIONAL (ASTM)

ASTM C 143/C 143M (2005a) Standard Test Method for Slump of Hydraulic-Cement Concrete

ASTM C 150 (2007) Standard Specification for Portland Cement

ASTM C 172 (2004) Standard Practice for Sampling Freshly Mixed Concrete

ASTM C 173/C 173M (2007) Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method

ASTM C 192/C 192M (2006) Standard Practice for Making and Curing Concrete Test Specimens in the Laboratory

ASTM C 227 (2003) Potential Alkali Reactivity of Cement-Aggregate Combinations (Mortar-Bar Method)

SECTION 03 30 00.00 20 Page 1

ASTM C 231 (2004) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method

ASTM C 260 (2006) Standard Specification for Air-Entraining Admixtures for Concrete

ASTM C 295 (2003) Petrographic Examination of Aggregates for Concrete

ASTM C 31/C 31M (2006) Standard Practice for Making and Curing Concrete Test Specimens in the Field

ASTM C 311 (2005) Sampling and Testing Fly Ash or Natural Pozzolans for Use as a Mineral Admixture in Portland-Cement Concrete

ASTM C 33 (2003) Standard Specification for Concrete Aggregates

ASTM C 39/C 39M (2005e1) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens

ASTM C 42/C 42M (2004) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete

ASTM C 494/C 494M (2005a) Standard Specification for Chemical Admixtures for Concrete

ASTM C 618 (2005) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete

ASTM C 94/C 94M (2007) Standard Specification for Ready-Mixed Concrete

ASTM D 1751 (2004) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types)

ASTM D 1752 (2004a) Standard Specification for Preformed Sponge Rubber Cork and Recycled PVC Expansion

ASTM D 5759 (1995; R 2005) Characterization of Coal Fly Ash and Clean Coal Combustion Fly Ash for Potential Uses

1.2 DEFINITIONS

a. "Cementitious material" as used herein shall include all portland cement, pozzolan, fly ash, and ground iron blast-furnace slag.

b. "Exposed to public view" means situated so that it can be seen from eye level from a public location after completion of the

SECTION 03 30 00.00 20 Page 2 building. A public location is accessible to persons not responsible for operation or maintenance of the building.

1.3 SUBMITTALS

Government approval is required for all submittals. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Materials for curing concrete Submit manufacturer's product data, indicating VOC content.

Joint filler Cement

SD-05 Design Data

Concrete mix design

SD-06 Test Reports

Concrete mix design

Compressive strength tests

Air Content

1.4 MODIFICATION OF REFERENCES

Accomplish work in accordance with ACI publications except as modified herein. Consider the advisory or recommended provisions to be mandatory, as though the word "shall" had been substituted for the words "should" or "could" or "may," wherever they appear. Interpret reference to the "Building Official," the "Structural Engineer," and the "Architect/Engineer" to mean the Contracting Officer.

1.5 DELIVERY, STORAGE, AND HANDLING

Do not deliver concrete until vapor barrier, forms, reinforcement, embedded items, and chamfer strips are in place and ready for concrete placement.

ACI 301 for job site storage of materials. Protect materials from contaminants such as grease, oil, and dirt. Ensure materials can be accurately identified after bundles are broken and tags removed. Do not store concrete curing compounds or sealers with materials that have a high capacity to adsorb volatile organic compound (VOC) emissions. Do not store concrete curing compounds or sealers in occupied spaces.

1.5.1 Reinforcement

Store reinforcement of different sizes and shapes in separate piles or racks raised above the ground. Protect from contaminants such as grease, oil, and dirt. Ensure bar sizes can be accurately identified after bundles are broken and tags removed.

SECTION 03 30 00.00 20 Page 3

1.6 Quality Assurance

1.6.1 Test Reports

1.6.1.1 Concrete Mix Design

Submit copies of laboratory test reports showing that the mix has been successfully tested to produce concrete with the properties specified and that mix will be suitable for the job conditions. The laboratory test reports shall include mill test and all other test for cement, aggregates, and admixtures. Provide maximum nominal aggregate size, gradation analysis, percentage retained and passing sieve, and a graph of percentage retained verses sieve size. Test reports shall be submitted along with the concrete mix design. Obtain approval before concrete placement.

PART 2 PRODUCTS

2.1 MATERIALS FOR FORMS

Provide wood,…