ATTACHMENT 4 - Schedule of Submittals
185 KB Posted
- Attached to
- Construct Phantom North Laundry Facility (A) Federal contract opportunity
- Solicitation number
- FA5706-12-R-0034
About this file
Schedule of Submittals (AF Form 66)
Text of this file
PROJECT TITLE SOLICITATION / CONTRACT NO.
APPROVED DISAPPROVED
Detail Work Schedule Identfying
Mobilization Period And Identifying
Significant Project Milestones, By
Discipline, As well As Delivery of
Long-Lead Items ( If Appropriate) And
Anticipated Pre-Final And Final
Inspection Dates
Prior To
NTP
Disclosure of long lead items with delivery dates impacting completion of project
Prior To
NTP
Site Specific Safety Plan Based On
The USACE, Safety and Health
Requirements Manual EM385-1-1, Latest Edition
Prior To
NTP
Daily Contractor Quality Control
Reports 3 As Required
104 ADAB Dig Safe Authority 1 Prior To
Excavation
105 Final As-Built Drawings 3 3
Within 30
Days Final
Acceptance
Including, but not limited to; Full Scale Hardcopy Drawings with
Red Line Deviation On Original Design, CDRom Containing
Adobe PDF of Hardcopy As-Built
Hot Mix Asphalt, Base Course Mix
Design
Conform to UFC 3-250-01 "Pavement Design for Roads, Streets, Walks, and Open Storage Areas", as well as, but not limited to, AASHTO T89, T90, T96, T102, T104, T176 and
ASTM C117, C136, D977, D2027, and other corollary specification within ADAB Project Specification.
Hot Mix Asphalt, Surface Course Mix
Design
Conform to UFC 3-250-01 "Pavement Design for Roads, Streets, Walks, and Open Storage Areas", as well as, but not limited to, AASHTO T89, T90, T96, T102, T104, T176 and
ASTM C117, C136, D977, D2027, and other corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail: Site
Barricades and Construction Fencing
3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Stormwater Piping, Fittings, Clamps, Solvent Cement, Manhole
Seal/Sealant, Fixtures and
Appurtenance
3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail: Below
Grade Structure Access Frames, Rims and Grates
3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Exterior Sanitary Sewer Piping, Fittings, Clamps, Solvent Cement, Manhole Seal/Sealant, Fixtures and
Apputenance
3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Exterior Water Distribution Piping, Fittings, Clamps, Solvent Cement, Fixtures and Appurtenance
3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
NORTH PHANTOM LAUNDRY
BUILDING A
IT
E M
D E
S
IG
N A
T
IO
N
DATE
CONTRACTOR
NOTIFIED
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
C E
R T
IF
IC
A T
IO
N
O F
C
M P
L
IA
N C
E
D R
A W
IN
G
S
S A
M P
L E
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S
S P
E C
IF
IC
A T
IO
N
M A
N U
F A
C T
U R
E
W A
R R
A N
T Y
C A
T A
L O
G
D
A T
A
PROJECT NUMBER
DHAF 12-0012
REMARKS
TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER
SCHEDULE OF MATERIAL SUBMITTALS
D A
T E
T O
C
IV
IL
E N
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
F O
L L
O W
-U P
C O
N T
R A
C T
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
O P
E R
A T
IN
G
T R
U C
T
IO
N S
T E
S T
R E
S U
L T
S
D E
S
IG
N O
T H
E R
R E
Q U
IR
E
D S
U B
M
IS
S
IO
D
T E
D A
T E
R E
C E
IV
E
D I
N T
R A
C T
IN
G
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 1 of 11 odie.freeman Typewritten Text odie.freeman Typewritten Text odie.freeman Typewritten Text
FA5706-12-R-0034
NORTH PHANTOM LAUNDRY
BUILDING A
IT
E M
D E
S
IG
N A
T
IO
N
DATE
CONTRACTOR
NOTIFIED
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
D R
A W
IN
G
S
S A
M P
L E
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
E C
IF
IC
A T
IO
N
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G
D
A T
A
PROJECT NUMBER
DHAF 12-0012
REMARKS
TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER
SCHEDULE OF MATERIAL SUBMITTALS
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
F O
L L
O W
-U P
C O
N T
R A
C T
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
O P
E R
A T
T R
U C
T
IO
N S
T E
S T
R E
S U
L T
S
D E
S
IG
N O
T H
E R
R E
Q U
IR
E
D S
U B
M
IS
S
T E
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
Contractor Field and/or Fabrication
Drawings: Demolition Plan, Sequence and Details
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Contractor Field and/or Fabrication
Drawings: Site Horizontal Control
Plan
3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Contractor Field and/or Fabrication
Drawings: Site Grading and
Topography Plan with Details
3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Contractor Field and/or Fabrication
Drawings: Site Paving, Sidewalk and
Hardscape Plan with Details
3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Contractor Field and/or Fabrication
Drawings: Stormwater Utility Plans with Details and Supporting Design
Calculations
3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Contractor Field and/or Fabrication
Drawings: Sanitary Sewer Utility
Plans with Details and Supporting
Design Calculations
3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Contractor Field and/or Fabrication
Drawings: Potable Water Utility Plans with Details and Supporting Design
Calculations
3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Report on Standard Penetration Test
(SPT) for each site identified by USG
Conform to UFC 3-220-03 “Soils and Geology Procedures for
Foundation Design of Building and Other Structures”, as well as, ASTM D1586-11 “Standard Test Method for Standard
Penetration Test (SPT) and Split-Barrel Sampling of Soils”, both latest available date.
Soil classification report covering full bore depth of every SPT conducted
Conform to UFC 3-220-03 “Soils and Geology Procedures for
Foundation Design of Building and Other Structures”, as well as, ASTM D2487-11 “Standard Practice for Classification of
Soils for Engineering Purposes (Unified Soil Classification
System)”, both latest available date.
Report on current and probable seasonal high water tables
Conform to UFC 3-220-03, latest available date.
Optimum Moisture Content Test
Report For Existing Soils And
Proposed Import Fill
Conform to ASTM D 698 and corollary specification within
ADAB Project Specification.
Existing Grade In Place Density Test
Reports
Conform to ASTM D 1577 and corollary specification within
ADAB Project Specification. Provide one test per 1000 square-feet.
In-Place Density Test Reports For
Each Site Fill Lift
Conform to ASTM D 1577 and corollary specification within
ADAB Project Specification. Provide one test per 1000 square-feet.
Test Results: In-Place Bituminous
Concrete Pavement Flexural Strength and Modulus of Elasticity
Conform to UFC 3-250-01 "Pavement Design for Roads, Streets, Walks, and Open Storage Areas", Appendix B. Provide one test per lane per 100 meters, or one test per 400 square-meters, whichever is greater.
ABU DHABI Based Cement Concrete
Batching Plant, Third Party Test Lab, Certificate Of Equipment Calibration
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 2 of 11
NORTH PHANTOM LAUNDRY
BUILDING A
IT
E M
D E
S
IG
N A
T
IO
N
DATE
CONTRACTOR
NOTIFIED
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
D R
A W
IN
G
S
S A
M P
L E
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
E C
IF
IC
A T
IO
N
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G
D
A T
A
PROJECT NUMBER
DHAF 12-0012
REMARKS
TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER
SCHEDULE OF MATERIAL SUBMITTALS
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
F O
L L
O W
-U P
C O
N T
R A
C T
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
O P
E R
A T
T R
U C
T
IO
N S
T E
S T
R E
S U
L T
S
D E
S
IG
N O
T H
E R
R E
Q U
IR
E
D S
U B
M
IS
S
T E
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
Portland Cement Manufacturer
Certification Of Cement Types(s) and
Physical Qualities
Conform to ASTM C150, as well as, but not limited to, corollary specification within ADAB Project Specification.
302 Cement Concrete Mix Design(s) 3
Conform to ACI Absolute Volume Method and ASTM C94
Standard Specification For Ready-Mix Concrete and ASTM C33
Standard Specification For Concrete Aggregates, as well as, but not limited to, corollary specification within ADAB Project
Specification.
Delivery tickets for all batch cement concrete deliveries
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Steel Bar Reinforcement
Manufacturer Certification Of Bar
Designations and Physical Qualities
Conform to ASTM A615/A615M, as well as, but not limited to, corollary specification within ADAB Project Specification.
305 Wire mesh reinforcement 3 3 Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Concrete Joint Backer Rod and
Sealant, Including Sealant MSDS
3 3 3
Conform to ASTM C920, as well as, but not limited to, corollary specification within ADAB Project Specification.
Contractor and/or Precast
Manufacturer's Fabrication Plan For
All Reinforced Cement Concrete
Structures with Details and
Supporting Design Calculations
3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Test Results: Three 28 Day Cylinder
Laboratory Break Evaluations Per
Concrete Delivery
Conform to ASTM C39, as well as, but not limited to, corollary specification within ADAB Project Specification.
Sample: Concrete Paver(s) and
Ground Cover(s)
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Precast Reinforced Cement Concrete
Structural Planking
Including, but not limited to; Precaster Qualification Report, Precast Concrete Mix Design, Precast Concrete Test Reports, Design Analysis, Structural Evaluation and Installation Details.
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail"
Prefabricated Steel Trussing
3 3
Including, but not limited to; Prefabricator's Qualification Report, Origin of Steel and Production Quality Designation in accordance with AISI, Truss Design Analysis, Structural
Evaluation and Installation Details, Truss Protective Coating.
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail: Pre-
Engineered Building 3 3
Contractor shall provide complete structural analysis documenting facility compliance with the structural requirements of UFC 3-301 as specified in the SOW. Analysis shall include, but is not limited to, consideration of dead and live loads, wind, and seismic load conditions and combinations specified by the building code.
Contractor Field and/or Fabrication
Drawings: Foundation Plans with
Details and Supporting Design
Calculations 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 3 of 11
NORTH PHANTOM LAUNDRY
BUILDING A
IT
E M
D E
S
IG
N A
T
IO
N
DATE
CONTRACTOR
NOTIFIED
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
D R
A W
IN
G
S
S A
M P
L E
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
E C
IF
IC
A T
IO
N
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G
D
A T
A
PROJECT NUMBER
DHAF 12-0012
REMARKS
TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER
SCHEDULE OF MATERIAL SUBMITTALS
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
F O
L L
O W
-U P
C O
N T
R A
C T
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
O P
E R
A T
T R
U C
T
IO
N S
T E
S T
R E
S U
L T
S
D E
S
IG
N O
T H
E R
R E
Q U
IR
E
D S
U B
M
IS
S
T E
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
Contractor Field and/or Fabrication
Drawings: Prefabricated Steel Truss
Analysis with Details and Supporting
Calculation 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Contractor Field and/or Fabrication
Drawings: Facility Structural Load
Analysis with Details and Supporting
Calculation 3 3
Contractor shall provide complete structural analysis documenting facility compliance with the structural requirements of UFC 3-301 as specified in the SOW. Analysis shall include, but is not limited to, consideration of dead and live loads, wind, and seismic load conditions and combinations specified by the building code.
Manufacture's product data for each type of masonry unit, accessory and other manufactured masonry products.
Showing all model options as listed in the project specification.
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Masonry Steel Bar Reinforcement
Manufacturer Certification Of Bar
Designations and Physical Qualities in Accordance With ASTM
A615/A615M, maximum yield 78 ksi
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Grout mix design Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Delivery tickets for all masonry grout placements
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Contractor Field and/or Fabrication
Drawings: Exterior Steel Stair, Platforms and Landings with Details and Supporting Design Calculations
Including, but not limited to; Structural Loading Evaluation, Weld and Attachment Specification, Foundation Details.
Conform to UFC 1-200-01, as well as, but not limited to, AISC, AWS and corollary specification within ADAB Project
Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Facility thermal insulation 3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Exterior Wall Panels 3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Exterior Roof Panels 3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Interior and Exterior Doors 3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Interior and Exterior Windows
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Interior and Exterior Door Hardware, Hinges, Closers and Kick Plates 3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 4 of 11
NORTH PHANTOM LAUNDRY
BUILDING A
IT
E M
D E
S
IG
N A
T
IO
N
DATE
CONTRACTOR
NOTIFIED
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
D R
A W
IN
G
S
S A
M P
L E
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
E C
IF
IC
A T
IO
N
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G
D
A T
A
PROJECT NUMBER
DHAF 12-0012
REMARKS
TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER
SCHEDULE OF MATERIAL SUBMITTALS
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
F O
L L
O W
-U P
C O
N T
R A
C T
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
O P
E R
A T
T R
U C
T
IO
N S
T E
S T
R E
S U
L T
S
D E
S
IG
N O
T H
E R
R E
Q U
IR
E
D S
U B
M
IS
S
T E
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Interior and Exterior Door Panic Bars and Interlock Rods (if appropriate) 3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Interior and Exterior Door Lock Set 3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Cipher-Locked Door Lock Set and
Hardware
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail: All
Architectural Finishes 3 3 3
Including, but not limited to; Floor, Wall, Baseboard, Trim, Ceiling and Door. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project
Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Epoxy Floor Coating 3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail: ESD, Electrostatic Control Floor Coating
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail: Vinyl
Flooring 3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Carpeting
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Interior and Exterior stucco finishing system, including method, mesh, control joint locations
3 3 3
Including, but limited to; Stucco finishing system, Application
Method, Reinforcing Mesh, Control Joint Locations. Conform to
UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Acoustic Ceiling Tile and Suspension
System
3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Interior molding, trim and kick plates 3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Interior partition construction, wall board, and finish 3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Interior cabinetry and countertop 3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Color Selection:
Including, but not limited to; All Architectural Finishes, Floor, Wall, Baseboard, Trim, Ceiling and Door. Conform to UFC 1-
200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 5 of 11
NORTH PHANTOM LAUNDRY
BUILDING A
IT
E M
D E
S
IG
N A
T
IO
N
DATE
CONTRACTOR
NOTIFIED
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
D R
A W
IN
G
S
S A
M P
L E
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
E C
IF
IC
A T
IO
N
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G
D
A T
A
PROJECT NUMBER
DHAF 12-0012
REMARKS
TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER
SCHEDULE OF MATERIAL SUBMITTALS
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
F O
L L
O W
-U P
C O
N T
R A
C T
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
O P
E R
A T
T R
U C
T
IO
N S
T E
S T
R E
S U
L T
S
D E
S
IG
N O
T H
E R
R E
Q U
IR
E
D S
U B
M
IS
S
T E
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
Design / Calculation / Construction
Drawing and Detail: Reflected Ceiling
Plan 3 3
Including, but not limited to; Tile and Fixture Layout, Fire Alarm
Detector Layout, Fire Sprinkler Layout, Ceiling HVAC Vent
Layout. Conform to UFC 1-200-01, as well as, ADAB Project
Specification. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project
Specification.
Design / Calculation / Construction
Drawing and Detail: Interior Cabinetry and Countertop Plan 3 3
Including, but not limited to; Cabinets, countertops, sinks and appliances. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project
Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail: Split
Package Heating and Air
Conditioning Units
3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Energy Recovery Ventilator (ERV)
Unit
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Ductwork, Insulation and Mastic 3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Exhaust Fans and Housing 3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Building and Door Louvers 3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Interior Sanitary Sewer Piping, Fittings, Clamps, Solvent Cement, Fixtures and Appurtenance
3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog / Product Data Sheet: Interior
Water Distribution Piping, Fittings, Clamps, Solvent Cement, Fixtures and Appurtenance
3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog / Product Data Sheet:
Plumbing fixtures (including, but not limited to, water closets, lavatorys, sinks, showers, etc.)
3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog / Product Data Sheet: Water supply and sanitary sewage collection
Tank(s)
Catalog / Product Data Sheet:
Petroleum fuel tank(s) and containment berm.
Catalog / Product Data Sheet: Dryer
Exhaust Connection, vent line and wall penetration with outdoor hood. 3 3 3
Ensure diameter of fitting is U.S. standard four inch diameter.
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 6 of 11
NORTH PHANTOM LAUNDRY
BUILDING A
IT
E M
D E
S
IG
N A
T
IO
N
DATE
CONTRACTOR
NOTIFIED
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
D R
A W
IN
G
S
S A
M P
L E
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
E C
IF
IC
A T
IO
N
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G
D
A T
A
PROJECT NUMBER
DHAF 12-0012
REMARKS
TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER
SCHEDULE OF MATERIAL SUBMITTALS
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
F O
L L
O W
-U P
C O
N T
R A
C T
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
O P
E R
A T
T R
U C
T
IO
N S
T E
S T
R E
S U
L T
S
D E
S
IG
N O
T H
E R
R E
Q U
IR
E
D S
U B
M
IS
S
T E
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
Design / Calculation / Construction
Drawing and Detail: Mechanical, Plumbing, Hot and Cold Water
System; Cold water palletized water pressure pump station with filtration.
3 3
Including, but not limited to; Water Usage Calculation based on
Specified Occupancy, Hot Water Demand Calculation, Plumbing Design and Isometrics. Submit cut sheets for all fixtures, valves, pipe material, water heaters, toilets, and other appurtenance. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project
Specification.
Design / Calculation / Construction
Drawing and Detail: Mechanical, Plumbing, Sanitary Waste System 3 3
Including, but not limited to; Plumbing Design and Isometrics.
Submit cut sheets for all fixtures, valves, pipe material, water heaters, and other appurtenance. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB
Project Specification.
Design / Calculation / Construction
Drawing and Detail: HVAC
3 3
Including, but not limited to; Load Calculations, HVAC Unit
Selection, System Drawings, Performance Data Sheets, Cycle
Time Calculations, and Controls. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB
Project Specification.
Design / Calculation / Construction
Drawing and Detail: HVAC Duct Work
Including, but not limited to; Air Flow Requirement Calculation, Duct Design and System Designer's Commisioning Report on
Installed System. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project
Specification.
Test Result: Facility water system
Hydrostatic Testing
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Test Result: Split Type HVAC
System Leak Testing; Water Lines, and Refrigeration Lines
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail: Fire
Alarm System Components 3 3 3
Including, but not limited to; Detector, Fire Alarm Control Panel, Signal Wiring, Monaco Link System, Fittings, Attachments and
Anchors. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail: Fire
Suppression System Components
Including, but not limited to; Interior and Exterior Piping / Valves
/ Fittings / Actuators / Controls and Alarms, Sprinkler Head, Hangars / Attachments and Anchors. Conform to UFC 1-200-
01, as well as, but not limited to, corollary specification within
ADAB Project Specification.
Design / Calculation / Construction
Drawing and Detail: Fire Alarm
System 3 3
Including, but not limited to; Interior and Exterior Wiring, Detector Layout, Single Line Design, Panel Schedule, Circuit
Evaluation. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NFPA and ADAB Project
Specification.
Design / Calculation / Construction
Drawing and Detail: Fire Alarm
System Battery Calculations
3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NFPA and ADAB Project
Specification.
Design / Calculation / Construction
Drawing and Detail: Fire Suppression
System Designer's Qualifications
Fire suppression system shall be designed by a qualifed engineer, with experience and training in the design of NFPA compliant fire suppression systems
Design / Calculation / Construction
Drawing and Detail: Fire Suppression
System
Including, but not limited to; Interior and Exterior System
Diagram and Construction Detail, Alarm and Notification
Layout, Sprinkler Head Layout, System Pressure and Flow
Analysis. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NFPA and ADAB Project
Specification.
Test Result: Fire Alarm System
Notification 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NFPA and ADAB Project
Specification.
Test Result: Facility Fire Suppression
System Pressure
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NFPA and ADAB Project
Specification.
Test Results: Fire Alarm System Test
Notification 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NFPA and ADAB Project
Specification.
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 7 of 11
NORTH PHANTOM LAUNDRY
BUILDING A
IT
E M
D E
S
IG
N A
T
IO
N
DATE
CONTRACTOR
NOTIFIED
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
D R
A W
IN
G
S
S A
M P
L E
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
E C
IF
IC
A T
IO
N
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G
D
A T
A
PROJECT NUMBER
DHAF 12-0012
REMARKS
TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER
SCHEDULE OF MATERIAL SUBMITTALS
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
F O
L L
O W
-U P
C O
N T
R A
C T
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
O P
E R
A T
T R
U C
T
IO
N S
T E
S T
R E
S U
L T
S
D E
S
IG
N O
T H
E R
R E
Q U
IR
E
D S
U B
M
IS
S
T E
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
Record: System Designer's
Commissioning Report, Record of
Completion and Certification of
Operational Capacity
Record: Fire Alarm System Operation and Maintenance Manual 3
Record: Fire Alarm System Record
Drawing
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Electrical Conduit System
Components
3 3 3
Including, but not limited to; Conduit, Fittings, Clamps, Solvent
Cement, Manhole Seals/Sealant, Duct Bank Spacer and Pull
Tape. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Electrical Distribution Tray and
Hanger System Componenets 3 3 3
Including, but not limited to; Cable Tray, Tray and Conduit
Hanger, Tray and Conduit Attachment and Anchor. Conform to
UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Facility Power Wire Way 3 3 3
Including, but not limited to; Wire Way, Markings, Hanger, Attachment and Anchor. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project
Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Electrical Enclosures 3 3 3
Including, but not limited to; Enclosure, NEMA Rating, Mounting
Bracket, Stand/Strut, Utility Pad and Conduit Sweep. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Electrical Sensors 3 3 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Electrical Wiring 3 3 3
Including, but not limited to; Interior and Exterior Power Cabling, Direct Bury Cabling, High/Med/Low Voltage Cabling. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Facility, Interior Power System
Components
3 3 3
Including, but not limited to; Circuit Breakers, Isolator, Transfer and Cutoff Switches, Panel Board, Junction and Enclosure.
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Facility, Exterior Power System
Components
3 3 3
Including, but not limited to; Circuit Breakers, Isolator, Transfer and Cutoff Switches, Panel Board, Junction and Enclosure.
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Interior and Exterior, Dedicated
Lighting System Power Components
Including, but not limited to; Circuit Breakers, Isolator, Transfer and Cutoff Switches, Panel Board, Junction and Enclosure.
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Lightning Protection System
Components
3 3 3
Including, but not limited to; Terminals, Rods, Conductors, Welds, Junctions, Sensors, Alarms, Panel Boards, Enclosures, Handholes and Covers
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Grounding Protection System
Components
3 3 3
Including, but not limited to; Terminals, Rods, Conductors, Welds, Junctions, Sensors, Alarms, Panel Boards, Enclosures, Handholes and Covers. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project
Specification.
NOT ANTICIPATED FOR THIS PROJECT
USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 8 of 11
NORTH PHANTOM LAUNDRY
BUILDING A
IT
E M
D E
S
IG
N A
T
IO
N
DATE
CONTRACTOR
NOTIFIED
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
D R
A W
IN
G
S
S A
M P
L E
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
E C
IF
IC
A T
IO
N
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G
D
A T
A
PROJECT NUMBER
DHAF 12-0012
REMARKS
TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER
SCHEDULE OF MATERIAL SUBMITTALS
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
F O
L L
O W
-U P
C O
N T
R A
C T
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
O P
E R
A T
T R
U C
T
IO
N S
T E
S T
R E
S U
L T
S
D E
S
IG
N O
T H
E R
R E
Q U
IR
E
D S
U B
M
IS
S
T E
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
Catalog Specification / Data Sheet /
Installation Drawing and Detail: Light
Pole Assembly
Including, but not limited to; Pole, Foundation, Conduit Sweep, Mounting, Bracket, Light Fixture and Lamp. Conform to UFC 1-
200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Facility, Interior and Exterior Lighting
System Components 3 3 3
Including, but not limited to; Fixture, Lamp, Enclosure, Mounting, Bracket, Conduit Sweep and Switching. Conform to
UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Interior and Exterior, Switches and
Receptacles
3 3 3
Including, but not limited to; Switch, Receptacle, Fitting, Enclosure, Mounting, Bracket, Conduit Sweep. Conform to UFC
1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Design / Calculation / Construction
Drawing and Detail: Power
Distribution System
3 3
Including, but not limited to; Interior and Exterior Wiring, Interior and Exterior Duct Bank / Conduit / Tray Layout, Interior and
Exterior Switch and Receptacle Layout, Single Line Design, Panel and Power Schedule, Circuit Load Evaluation. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC, ADWEA and ADAB Project
Specification.
Design / Calculation / Construction
Drawing and Detail: Lighting System 3 3
Including, but not limited to; Photometric and Cutoff Evaluation.
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and ADAB Project
Specification.
Design / Calculation / Construction
Drawing and Detail: Lightning
Protection System 3 3
Including, but not limited to; Strike Risk Evaluation. Conform to
UFC 1-200-01, as well as, but not limited to, corollary specification within NFPA, NEC, IEC and ADAB Project
Specification.
Design / Calculation / Construction
Drawing and Detail: Grounding
Protection System 3 3
Including, but not limited to; Soil Conductivity Evaluation.
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NFPA, NEC, IEC and ADAB
Project Specification.
Design / Calculation / Construction
Drawing and Detail: Electrical
Manhole / Handhole and Covers
Including, but not limited to; Structural Loading Evaluation and
Bouyancy Evaluation. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and
ADAB Project Specification.
Test Result: Power Distribution
System
Including, but not limited to; Wire Insulation, Voltage and
Continuity. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and ADAB Project
Specification.
Test Result: Lightning Protection
System 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and ADAB Project
Specification.
Test Result: Grounding Protection
System 3
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and ADAB Project
Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Communication Conduit System
Components
Including, but not limited to; Conduit, Fittings, Clamps, Solvent
Cement, Manhole Seals/Sealant, Duct Bank Spacer and Pull
Tape. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Communication Distribution Tray and
Hanger System Componenets
Including, but not limited to; Cable Tray, Tray and Conduit
Hanger, Tray and Conduit Attachment and Anchor. Conform to
UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Facility Communication Wire Way
Including, but not limited to; Wire Way, Markings, Hanger, Attachment and Anchor. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project
Specification.
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 9 of 11
NORTH PHANTOM LAUNDRY
BUILDING A
IT
E M
D E
S
IG
N A
T
IO
N
DATE
CONTRACTOR
NOTIFIED
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
D R
A W
IN
G
S
S A
M P
L E
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
E C
IF
IC
A T
IO
N
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G
D
A T
A
PROJECT NUMBER
DHAF 12-0012
REMARKS
TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER
SCHEDULE OF MATERIAL SUBMITTALS
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
F O
L L
O W
-U P
C O
N T
R A
C T
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
O P
E R
A T
T R
U C
T
IO
N S
T E
S T
R E
S U
L T
S
D E
S
IG
N O
T H
E R
R E
Q U
IR
E
D S
U B
M
IS
S
T E
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Communication Enclosures
Including, but not limited to; Enclosure, NEMA Rating, Mounting
Bracket, Stand/Strut, Utility Pad and Conduit Sweep. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Communication Wiring
Including, but not limited to; Interior and Exterior Data Cabling, CATV Cabling, Telephony Cabling. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB
Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Communication Exterior Termination
Including, but not limited to; Wall Penetration, Conduit Sweep, Mounting, Attachment, Anchor, Grounding Bus, Backplane and
Termination Hardware. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project
Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Communication Data Server Cabinet
Including, but not limited to; Cabinet, Mounting, Attachment, Anchor, Grounding Bus, Backplane and Termination Hardware.
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
CATV Wall Mounting
Including, but not limited to; Mounting, Bracket, Attachment and
Anchor. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.
Catalog Specification / Data Sheet /
Installation Drawing and Detail:
Interior and Exterior, Communication
Distribution
Including, but not limited to; Receptacle, Face Plate, Connectors, Enclosure, J-Box, Patch Panel, Mounting, Bracket, Conduit Sweep. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project
Specification.
Design / Calculation / Construction
Drawing and Detail: Communication
Distribution System
Including, but not limited to; Interior and Exterior Wiring, Interior and Exterior Duct Bank / Conduit / Tray Layout, Interior and
Exterior Switch and Receptacle Layout, Single Line Design and
Service Schedule. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and ADAB
Project Specification.
Design / Calculation / Construction
Drawing and Detail: Communication
Manhole / Handhole and Covers
Including, but not limited to; Structural Loading Evaluation and
Bouyancy Evaluation. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and
ADAB Project Specification.
Test Result: CAT 6 (Class E) Data
Cable Testing
Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and ADAB Project
Specification.
Test Result: Communication
Distribution System Including, but not limited to; Wire Insulation, Voltage, Continuity and Data Integrity. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and ADAB
Project Specification.
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
NOT ANTICIPATED FOR THIS PROJECT
USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 10 of 11
NORTH PHANTOM LAUNDRY
BUILDING A
IT
E M
D E
S
IG
N A
T
IO
N
DATE
CONTRACTOR
NOTIFIED
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
D R
A W
IN
G
S
S A
M P
L E
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
E C
IF
IC
A T
IO
N
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G
D
A T
A
PROJECT NUMBER
DHAF 12-0012
REMARKS
TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER
SCHEDULE OF MATERIAL SUBMITTALS
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
F O
L L
O W
-U P
C O
N T
R A
C T
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
O P
E R
A T
T R
U C
T
IO
N S
T E
S T
R E
S U
L T
S
D E
S
IG
N O
T H
E R
R E
Q U
IR
E
D S
U B
M
IS
S
T E
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 11 of 11
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre Proposal Confrence.pptx | PPTX presentation | |
| QUESTIONS AND ANSWERS.pdf | ||
| ATTACHMENT 3 | — | |
| FA5706-12-R-0034-0001 Laundry A.pdf | ||
| ATTACHMENT 1 - Statement of Work.pdf | ||
| ATTACHMENT 2 - Specifications.pdf | ||
| FA5706-12-R-0034.pdf | ||
| ATTACHMENT 3 - Plans - DHAF12-0012 Facility A.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .