Schedule of Submittals (AF Form 66)

Text of this file

PROJECT TITLE SOLICITATION / CONTRACT NO.

APPROVED DISAPPROVED

Detail Work Schedule Identfying

Mobilization Period And Identifying

Significant Project Milestones, By

Discipline, As well As Delivery of

Long-Lead Items ( If Appropriate) And

Anticipated Pre-Final And Final

Inspection Dates

Prior To

NTP

Disclosure of long lead items with delivery dates impacting completion of project

Prior To

NTP

Site Specific Safety Plan Based On

The USACE, Safety and Health

Requirements Manual EM385-1-1, Latest Edition

Prior To

NTP

Daily Contractor Quality Control

Reports 3 As Required

104 ADAB Dig Safe Authority 1 Prior To

Excavation

105 Final As-Built Drawings 3 3

Within 30

Days Final

Acceptance

Including, but not limited to; Full Scale Hardcopy Drawings with

Red Line Deviation On Original Design, CDRom Containing

Adobe PDF of Hardcopy As-Built

Hot Mix Asphalt, Base Course Mix

Design

Conform to UFC 3-250-01 "Pavement Design for Roads, Streets, Walks, and Open Storage Areas", as well as, but not limited to, AASHTO T89, T90, T96, T102, T104, T176 and

ASTM C117, C136, D977, D2027, and other corollary specification within ADAB Project Specification.

Hot Mix Asphalt, Surface Course Mix

Design

Conform to UFC 3-250-01 "Pavement Design for Roads, Streets, Walks, and Open Storage Areas", as well as, but not limited to, AASHTO T89, T90, T96, T102, T104, T176 and

ASTM C117, C136, D977, D2027, and other corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail: Site

Barricades and Construction Fencing

3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Stormwater Piping, Fittings, Clamps, Solvent Cement, Manhole

Seal/Sealant, Fixtures and

Appurtenance

3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail: Below

Grade Structure Access Frames, Rims and Grates

3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Exterior Sanitary Sewer Piping, Fittings, Clamps, Solvent Cement, Manhole Seal/Sealant, Fixtures and

Apputenance

3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Exterior Water Distribution Piping, Fittings, Clamps, Solvent Cement, Fixtures and Appurtenance

3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

NORTH PHANTOM LAUNDRY

BUILDING A

IT

E M

D E

S

IG

N A

T

IO

N

DATE

CONTRACTOR

NOTIFIED

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

C E

R T

IF

IC

A T

IO

N

O F

C

M P

L

IA

N C

E

D R

A W

IN

G

S

S A

M P

L E

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S

S P

E C

IF

IC

A T

IO

N

M A

N U

F A

C T

U R

E

W A

R R

A N

T Y

C A

T A

L O

G

D

A T

A

PROJECT NUMBER

DHAF 12-0012

REMARKS

TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER

SCHEDULE OF MATERIAL SUBMITTALS

D A

T E

T O

C

IV

IL

E N

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

F O

L L

O W

-U P

C O

N T

R A

C T

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

O P

E R

A T

IN

G

T R

U C

T

IO

N S

T E

S T

R E

S U

L T

S

D E

S

IG

N O

T H

E R

R E

Q U

IR

E

D S

U B

M

IS

S

IO

D

T E

D A

T E

R E

C E

IV

E

D I

N T

R A

C T

IN

G

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 1 of 11 odie.freeman Typewritten Text odie.freeman Typewritten Text odie.freeman Typewritten Text

FA5706-12-R-0034

NORTH PHANTOM LAUNDRY

BUILDING A

IT

E M

D E

S

IG

N A

T

IO

N

DATE

CONTRACTOR

NOTIFIED

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

C E

R T

IF

IC

A T

IO

N

M P

L

IA

N C

E

D R

A W

IN

G

S

S A

M P

L E

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E

E C

IF

IC

A T

IO

N

M A

N U

F A

C T

U R

E

R R

A N

T Y

C A

T A

L O

G

D

A T

A

PROJECT NUMBER

DHAF 12-0012

REMARKS

TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER

SCHEDULE OF MATERIAL SUBMITTALS

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

F O

L L

O W

-U P

C O

N T

R A

C T

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

O P

E R

A T

T R

U C

T

IO

N S

T E

S T

R E

S U

L T

S

D E

S

IG

N O

T H

E R

R E

Q U

IR

E

D S

U B

M

IS

S

T E

D A

T E

R E

C E

IV

E

D

N T

R A

C T

IN

G

Contractor Field and/or Fabrication

Drawings: Demolition Plan, Sequence and Details

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Contractor Field and/or Fabrication

Drawings: Site Horizontal Control

Plan

3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Contractor Field and/or Fabrication

Drawings: Site Grading and

Topography Plan with Details

3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Contractor Field and/or Fabrication

Drawings: Site Paving, Sidewalk and

Hardscape Plan with Details

3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Contractor Field and/or Fabrication

Drawings: Stormwater Utility Plans with Details and Supporting Design

Calculations

3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Contractor Field and/or Fabrication

Drawings: Sanitary Sewer Utility

Plans with Details and Supporting

Design Calculations

3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Contractor Field and/or Fabrication

Drawings: Potable Water Utility Plans with Details and Supporting Design

Calculations

3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Report on Standard Penetration Test

(SPT) for each site identified by USG

Conform to UFC 3-220-03 “Soils and Geology Procedures for

Foundation Design of Building and Other Structures”, as well as, ASTM D1586-11 “Standard Test Method for Standard

Penetration Test (SPT) and Split-Barrel Sampling of Soils”, both latest available date.

Soil classification report covering full bore depth of every SPT conducted

Conform to UFC 3-220-03 “Soils and Geology Procedures for

Foundation Design of Building and Other Structures”, as well as, ASTM D2487-11 “Standard Practice for Classification of

Soils for Engineering Purposes (Unified Soil Classification

System)”, both latest available date.

Report on current and probable seasonal high water tables

Conform to UFC 3-220-03, latest available date.

Optimum Moisture Content Test

Report For Existing Soils And

Proposed Import Fill

Conform to ASTM D 698 and corollary specification within

ADAB Project Specification.

Existing Grade In Place Density Test

Reports

Conform to ASTM D 1577 and corollary specification within

ADAB Project Specification. Provide one test per 1000 square-feet.

In-Place Density Test Reports For

Each Site Fill Lift

Conform to ASTM D 1577 and corollary specification within

ADAB Project Specification. Provide one test per 1000 square-feet.

Test Results: In-Place Bituminous

Concrete Pavement Flexural Strength and Modulus of Elasticity

Conform to UFC 3-250-01 "Pavement Design for Roads, Streets, Walks, and Open Storage Areas", Appendix B. Provide one test per lane per 100 meters, or one test per 400 square-meters, whichever is greater.

ABU DHABI Based Cement Concrete

Batching Plant, Third Party Test Lab, Certificate Of Equipment Calibration

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 2 of 11

NORTH PHANTOM LAUNDRY

BUILDING A

IT

E M

D E

S

IG

N A

T

IO

N

DATE

CONTRACTOR

NOTIFIED

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

C E

R T

IF

IC

A T

IO

N

M P

L

IA

N C

E

D R

A W

IN

G

S

S A

M P

L E

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E

E C

IF

IC

A T

IO

N

M A

N U

F A

C T

U R

E

R R

A N

T Y

C A

T A

L O

G

D

A T

A

PROJECT NUMBER

DHAF 12-0012

REMARKS

TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER

SCHEDULE OF MATERIAL SUBMITTALS

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

F O

L L

O W

-U P

C O

N T

R A

C T

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

O P

E R

A T

T R

U C

T

IO

N S

T E

S T

R E

S U

L T

S

D E

S

IG

N O

T H

E R

R E

Q U

IR

E

D S

U B

M

IS

S

T E

D A

T E

R E

C E

IV

E

D

N T

R A

C T

IN

G

Portland Cement Manufacturer

Certification Of Cement Types(s) and

Physical Qualities

Conform to ASTM C150, as well as, but not limited to, corollary specification within ADAB Project Specification.

302 Cement Concrete Mix Design(s) 3

Conform to ACI Absolute Volume Method and ASTM C94

Standard Specification For Ready-Mix Concrete and ASTM C33

Standard Specification For Concrete Aggregates, as well as, but not limited to, corollary specification within ADAB Project

Specification.

Delivery tickets for all batch cement concrete deliveries

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Steel Bar Reinforcement

Manufacturer Certification Of Bar

Designations and Physical Qualities

Conform to ASTM A615/A615M, as well as, but not limited to, corollary specification within ADAB Project Specification.

305 Wire mesh reinforcement 3 3 Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Concrete Joint Backer Rod and

Sealant, Including Sealant MSDS

3 3 3

Conform to ASTM C920, as well as, but not limited to, corollary specification within ADAB Project Specification.

Contractor and/or Precast

Manufacturer's Fabrication Plan For

All Reinforced Cement Concrete

Structures with Details and

Supporting Design Calculations

3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Test Results: Three 28 Day Cylinder

Laboratory Break Evaluations Per

Concrete Delivery

Conform to ASTM C39, as well as, but not limited to, corollary specification within ADAB Project Specification.

Sample: Concrete Paver(s) and

Ground Cover(s)

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Precast Reinforced Cement Concrete

Structural Planking

Including, but not limited to; Precaster Qualification Report, Precast Concrete Mix Design, Precast Concrete Test Reports, Design Analysis, Structural Evaluation and Installation Details.

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail"

Prefabricated Steel Trussing

3 3

Including, but not limited to; Prefabricator's Qualification Report, Origin of Steel and Production Quality Designation in accordance with AISI, Truss Design Analysis, Structural

Evaluation and Installation Details, Truss Protective Coating.

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail: Pre-

Engineered Building 3 3

Contractor shall provide complete structural analysis documenting facility compliance with the structural requirements of UFC 3-301 as specified in the SOW. Analysis shall include, but is not limited to, consideration of dead and live loads, wind, and seismic load conditions and combinations specified by the building code.

Contractor Field and/or Fabrication

Drawings: Foundation Plans with

Details and Supporting Design

Calculations 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 3 of 11

NORTH PHANTOM LAUNDRY

BUILDING A

IT

E M

D E

S

IG

N A

T

IO

N

DATE

CONTRACTOR

NOTIFIED

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

C E

R T

IF

IC

A T

IO

N

M P

L

IA

N C

E

D R

A W

IN

G

S

S A

M P

L E

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E

E C

IF

IC

A T

IO

N

M A

N U

F A

C T

U R

E

R R

A N

T Y

C A

T A

L O

G

D

A T

A

PROJECT NUMBER

DHAF 12-0012

REMARKS

TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER

SCHEDULE OF MATERIAL SUBMITTALS

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

F O

L L

O W

-U P

C O

N T

R A

C T

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

O P

E R

A T

T R

U C

T

IO

N S

T E

S T

R E

S U

L T

S

D E

S

IG

N O

T H

E R

R E

Q U

IR

E

D S

U B

M

IS

S

T E

D A

T E

R E

C E

IV

E

D

N T

R A

C T

IN

G

Contractor Field and/or Fabrication

Drawings: Prefabricated Steel Truss

Analysis with Details and Supporting

Calculation 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Contractor Field and/or Fabrication

Drawings: Facility Structural Load

Analysis with Details and Supporting

Calculation 3 3

Contractor shall provide complete structural analysis documenting facility compliance with the structural requirements of UFC 3-301 as specified in the SOW. Analysis shall include, but is not limited to, consideration of dead and live loads, wind, and seismic load conditions and combinations specified by the building code.

Manufacture's product data for each type of masonry unit, accessory and other manufactured masonry products.

Showing all model options as listed in the project specification.

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Masonry Steel Bar Reinforcement

Manufacturer Certification Of Bar

Designations and Physical Qualities in Accordance With ASTM

A615/A615M, maximum yield 78 ksi

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Grout mix design Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Delivery tickets for all masonry grout placements

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Contractor Field and/or Fabrication

Drawings: Exterior Steel Stair, Platforms and Landings with Details and Supporting Design Calculations

Including, but not limited to; Structural Loading Evaluation, Weld and Attachment Specification, Foundation Details.

Conform to UFC 1-200-01, as well as, but not limited to, AISC, AWS and corollary specification within ADAB Project

Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Facility thermal insulation 3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Exterior Wall Panels 3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Exterior Roof Panels 3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Interior and Exterior Doors 3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Interior and Exterior Windows

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Interior and Exterior Door Hardware, Hinges, Closers and Kick Plates 3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 4 of 11

NORTH PHANTOM LAUNDRY

BUILDING A

IT

E M

D E

S

IG

N A

T

IO

N

DATE

CONTRACTOR

NOTIFIED

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

C E

R T

IF

IC

A T

IO

N

M P

L

IA

N C

E

D R

A W

IN

G

S

S A

M P

L E

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E

E C

IF

IC

A T

IO

N

M A

N U

F A

C T

U R

E

R R

A N

T Y

C A

T A

L O

G

D

A T

A

PROJECT NUMBER

DHAF 12-0012

REMARKS

TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER

SCHEDULE OF MATERIAL SUBMITTALS

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

F O

L L

O W

-U P

C O

N T

R A

C T

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

O P

E R

A T

T R

U C

T

IO

N S

T E

S T

R E

S U

L T

S

D E

S

IG

N O

T H

E R

R E

Q U

IR

E

D S

U B

M

IS

S

T E

D A

T E

R E

C E

IV

E

D

N T

R A

C T

IN

G

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Interior and Exterior Door Panic Bars and Interlock Rods (if appropriate) 3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Interior and Exterior Door Lock Set 3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Cipher-Locked Door Lock Set and

Hardware

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail: All

Architectural Finishes 3 3 3

Including, but not limited to; Floor, Wall, Baseboard, Trim, Ceiling and Door. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project

Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Epoxy Floor Coating 3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail: ESD, Electrostatic Control Floor Coating

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail: Vinyl

Flooring 3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Carpeting

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Interior and Exterior stucco finishing system, including method, mesh, control joint locations

3 3 3

Including, but limited to; Stucco finishing system, Application

Method, Reinforcing Mesh, Control Joint Locations. Conform to

UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Acoustic Ceiling Tile and Suspension

System

3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Interior molding, trim and kick plates 3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Interior partition construction, wall board, and finish 3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Interior cabinetry and countertop 3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Color Selection:

Including, but not limited to; All Architectural Finishes, Floor, Wall, Baseboard, Trim, Ceiling and Door. Conform to UFC 1-

200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 5 of 11

NORTH PHANTOM LAUNDRY

BUILDING A

IT

E M

D E

S

IG

N A

T

IO

N

DATE

CONTRACTOR

NOTIFIED

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

C E

R T

IF

IC

A T

IO

N

M P

L

IA

N C

E

D R

A W

IN

G

S

S A

M P

L E

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E

E C

IF

IC

A T

IO

N

M A

N U

F A

C T

U R

E

R R

A N

T Y

C A

T A

L O

G

D

A T

A

PROJECT NUMBER

DHAF 12-0012

REMARKS

TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER

SCHEDULE OF MATERIAL SUBMITTALS

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

F O

L L

O W

-U P

C O

N T

R A

C T

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

O P

E R

A T

T R

U C

T

IO

N S

T E

S T

R E

S U

L T

S

D E

S

IG

N O

T H

E R

R E

Q U

IR

E

D S

U B

M

IS

S

T E

D A

T E

R E

C E

IV

E

D

N T

R A

C T

IN

G

Design / Calculation / Construction

Drawing and Detail: Reflected Ceiling

Plan 3 3

Including, but not limited to; Tile and Fixture Layout, Fire Alarm

Detector Layout, Fire Sprinkler Layout, Ceiling HVAC Vent

Layout. Conform to UFC 1-200-01, as well as, ADAB Project

Specification. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project

Specification.

Design / Calculation / Construction

Drawing and Detail: Interior Cabinetry and Countertop Plan 3 3

Including, but not limited to; Cabinets, countertops, sinks and appliances. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project

Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail: Split

Package Heating and Air

Conditioning Units

3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Energy Recovery Ventilator (ERV)

Unit

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Ductwork, Insulation and Mastic 3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Exhaust Fans and Housing 3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Building and Door Louvers 3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Interior Sanitary Sewer Piping, Fittings, Clamps, Solvent Cement, Fixtures and Appurtenance

3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog / Product Data Sheet: Interior

Water Distribution Piping, Fittings, Clamps, Solvent Cement, Fixtures and Appurtenance

3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog / Product Data Sheet:

Plumbing fixtures (including, but not limited to, water closets, lavatorys, sinks, showers, etc.)

3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog / Product Data Sheet: Water supply and sanitary sewage collection

Tank(s)

Catalog / Product Data Sheet:

Petroleum fuel tank(s) and containment berm.

Catalog / Product Data Sheet: Dryer

Exhaust Connection, vent line and wall penetration with outdoor hood. 3 3 3

Ensure diameter of fitting is U.S. standard four inch diameter.

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 6 of 11

NORTH PHANTOM LAUNDRY

BUILDING A

IT

E M

D E

S

IG

N A

T

IO

N

DATE

CONTRACTOR

NOTIFIED

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

C E

R T

IF

IC

A T

IO

N

M P

L

IA

N C

E

D R

A W

IN

G

S

S A

M P

L E

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E

E C

IF

IC

A T

IO

N

M A

N U

F A

C T

U R

E

R R

A N

T Y

C A

T A

L O

G

D

A T

A

PROJECT NUMBER

DHAF 12-0012

REMARKS

TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER

SCHEDULE OF MATERIAL SUBMITTALS

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

F O

L L

O W

-U P

C O

N T

R A

C T

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

O P

E R

A T

T R

U C

T

IO

N S

T E

S T

R E

S U

L T

S

D E

S

IG

N O

T H

E R

R E

Q U

IR

E

D S

U B

M

IS

S

T E

D A

T E

R E

C E

IV

E

D

N T

R A

C T

IN

G

Design / Calculation / Construction

Drawing and Detail: Mechanical, Plumbing, Hot and Cold Water

System; Cold water palletized water pressure pump station with filtration.

3 3

Including, but not limited to; Water Usage Calculation based on

Specified Occupancy, Hot Water Demand Calculation, Plumbing Design and Isometrics. Submit cut sheets for all fixtures, valves, pipe material, water heaters, toilets, and other appurtenance. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project

Specification.

Design / Calculation / Construction

Drawing and Detail: Mechanical, Plumbing, Sanitary Waste System 3 3

Including, but not limited to; Plumbing Design and Isometrics.

Submit cut sheets for all fixtures, valves, pipe material, water heaters, and other appurtenance. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB

Project Specification.

Design / Calculation / Construction

Drawing and Detail: HVAC

3 3

Including, but not limited to; Load Calculations, HVAC Unit

Selection, System Drawings, Performance Data Sheets, Cycle

Time Calculations, and Controls. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB

Project Specification.

Design / Calculation / Construction

Drawing and Detail: HVAC Duct Work

Including, but not limited to; Air Flow Requirement Calculation, Duct Design and System Designer's Commisioning Report on

Installed System. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project

Specification.

Test Result: Facility water system

Hydrostatic Testing

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Test Result: Split Type HVAC

System Leak Testing; Water Lines, and Refrigeration Lines

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail: Fire

Alarm System Components 3 3 3

Including, but not limited to; Detector, Fire Alarm Control Panel, Signal Wiring, Monaco Link System, Fittings, Attachments and

Anchors. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail: Fire

Suppression System Components

Including, but not limited to; Interior and Exterior Piping / Valves

/ Fittings / Actuators / Controls and Alarms, Sprinkler Head, Hangars / Attachments and Anchors. Conform to UFC 1-200-

01, as well as, but not limited to, corollary specification within

ADAB Project Specification.

Design / Calculation / Construction

Drawing and Detail: Fire Alarm

System 3 3

Including, but not limited to; Interior and Exterior Wiring, Detector Layout, Single Line Design, Panel Schedule, Circuit

Evaluation. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NFPA and ADAB Project

Specification.

Design / Calculation / Construction

Drawing and Detail: Fire Alarm

System Battery Calculations

3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NFPA and ADAB Project

Specification.

Design / Calculation / Construction

Drawing and Detail: Fire Suppression

System Designer's Qualifications

Fire suppression system shall be designed by a qualifed engineer, with experience and training in the design of NFPA compliant fire suppression systems

Design / Calculation / Construction

Drawing and Detail: Fire Suppression

System

Including, but not limited to; Interior and Exterior System

Diagram and Construction Detail, Alarm and Notification

Layout, Sprinkler Head Layout, System Pressure and Flow

Analysis. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NFPA and ADAB Project

Specification.

Test Result: Fire Alarm System

Notification 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NFPA and ADAB Project

Specification.

Test Result: Facility Fire Suppression

System Pressure

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NFPA and ADAB Project

Specification.

Test Results: Fire Alarm System Test

Notification 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NFPA and ADAB Project

Specification.

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 7 of 11

NORTH PHANTOM LAUNDRY

BUILDING A

IT

E M

D E

S

IG

N A

T

IO

N

DATE

CONTRACTOR

NOTIFIED

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

C E

R T

IF

IC

A T

IO

N

M P

L

IA

N C

E

D R

A W

IN

G

S

S A

M P

L E

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E

E C

IF

IC

A T

IO

N

M A

N U

F A

C T

U R

E

R R

A N

T Y

C A

T A

L O

G

D

A T

A

PROJECT NUMBER

DHAF 12-0012

REMARKS

TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER

SCHEDULE OF MATERIAL SUBMITTALS

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

F O

L L

O W

-U P

C O

N T

R A

C T

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

O P

E R

A T

T R

U C

T

IO

N S

T E

S T

R E

S U

L T

S

D E

S

IG

N O

T H

E R

R E

Q U

IR

E

D S

U B

M

IS

S

T E

D A

T E

R E

C E

IV

E

D

N T

R A

C T

IN

G

Record: System Designer's

Commissioning Report, Record of

Completion and Certification of

Operational Capacity

Record: Fire Alarm System Operation and Maintenance Manual 3

Record: Fire Alarm System Record

Drawing

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Electrical Conduit System

Components

3 3 3

Including, but not limited to; Conduit, Fittings, Clamps, Solvent

Cement, Manhole Seals/Sealant, Duct Bank Spacer and Pull

Tape. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Electrical Distribution Tray and

Hanger System Componenets 3 3 3

Including, but not limited to; Cable Tray, Tray and Conduit

Hanger, Tray and Conduit Attachment and Anchor. Conform to

UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Facility Power Wire Way 3 3 3

Including, but not limited to; Wire Way, Markings, Hanger, Attachment and Anchor. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project

Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Electrical Enclosures 3 3 3

Including, but not limited to; Enclosure, NEMA Rating, Mounting

Bracket, Stand/Strut, Utility Pad and Conduit Sweep. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Electrical Sensors 3 3 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Electrical Wiring 3 3 3

Including, but not limited to; Interior and Exterior Power Cabling, Direct Bury Cabling, High/Med/Low Voltage Cabling. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Facility, Interior Power System

Components

3 3 3

Including, but not limited to; Circuit Breakers, Isolator, Transfer and Cutoff Switches, Panel Board, Junction and Enclosure.

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Facility, Exterior Power System

Components

3 3 3

Including, but not limited to; Circuit Breakers, Isolator, Transfer and Cutoff Switches, Panel Board, Junction and Enclosure.

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Interior and Exterior, Dedicated

Lighting System Power Components

Including, but not limited to; Circuit Breakers, Isolator, Transfer and Cutoff Switches, Panel Board, Junction and Enclosure.

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Lightning Protection System

Components

3 3 3

Including, but not limited to; Terminals, Rods, Conductors, Welds, Junctions, Sensors, Alarms, Panel Boards, Enclosures, Handholes and Covers

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Grounding Protection System

Components

3 3 3

Including, but not limited to; Terminals, Rods, Conductors, Welds, Junctions, Sensors, Alarms, Panel Boards, Enclosures, Handholes and Covers. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project

Specification.

NOT ANTICIPATED FOR THIS PROJECT

USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 8 of 11

NORTH PHANTOM LAUNDRY

BUILDING A

IT

E M

D E

S

IG

N A

T

IO

N

DATE

CONTRACTOR

NOTIFIED

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

C E

R T

IF

IC

A T

IO

N

M P

L

IA

N C

E

D R

A W

IN

G

S

S A

M P

L E

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E

E C

IF

IC

A T

IO

N

M A

N U

F A

C T

U R

E

R R

A N

T Y

C A

T A

L O

G

D

A T

A

PROJECT NUMBER

DHAF 12-0012

REMARKS

TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER

SCHEDULE OF MATERIAL SUBMITTALS

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

F O

L L

O W

-U P

C O

N T

R A

C T

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

O P

E R

A T

T R

U C

T

IO

N S

T E

S T

R E

S U

L T

S

D E

S

IG

N O

T H

E R

R E

Q U

IR

E

D S

U B

M

IS

S

T E

D A

T E

R E

C E

IV

E

D

N T

R A

C T

IN

G

Catalog Specification / Data Sheet /

Installation Drawing and Detail: Light

Pole Assembly

Including, but not limited to; Pole, Foundation, Conduit Sweep, Mounting, Bracket, Light Fixture and Lamp. Conform to UFC 1-

200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Facility, Interior and Exterior Lighting

System Components 3 3 3

Including, but not limited to; Fixture, Lamp, Enclosure, Mounting, Bracket, Conduit Sweep and Switching. Conform to

UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Interior and Exterior, Switches and

Receptacles

3 3 3

Including, but not limited to; Switch, Receptacle, Fitting, Enclosure, Mounting, Bracket, Conduit Sweep. Conform to UFC

1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Design / Calculation / Construction

Drawing and Detail: Power

Distribution System

3 3

Including, but not limited to; Interior and Exterior Wiring, Interior and Exterior Duct Bank / Conduit / Tray Layout, Interior and

Exterior Switch and Receptacle Layout, Single Line Design, Panel and Power Schedule, Circuit Load Evaluation. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC, ADWEA and ADAB Project

Specification.

Design / Calculation / Construction

Drawing and Detail: Lighting System 3 3

Including, but not limited to; Photometric and Cutoff Evaluation.

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and ADAB Project

Specification.

Design / Calculation / Construction

Drawing and Detail: Lightning

Protection System 3 3

Including, but not limited to; Strike Risk Evaluation. Conform to

UFC 1-200-01, as well as, but not limited to, corollary specification within NFPA, NEC, IEC and ADAB Project

Specification.

Design / Calculation / Construction

Drawing and Detail: Grounding

Protection System 3 3

Including, but not limited to; Soil Conductivity Evaluation.

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NFPA, NEC, IEC and ADAB

Project Specification.

Design / Calculation / Construction

Drawing and Detail: Electrical

Manhole / Handhole and Covers

Including, but not limited to; Structural Loading Evaluation and

Bouyancy Evaluation. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and

ADAB Project Specification.

Test Result: Power Distribution

System

Including, but not limited to; Wire Insulation, Voltage and

Continuity. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and ADAB Project

Specification.

Test Result: Lightning Protection

System 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and ADAB Project

Specification.

Test Result: Grounding Protection

System 3

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and ADAB Project

Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Communication Conduit System

Components

Including, but not limited to; Conduit, Fittings, Clamps, Solvent

Cement, Manhole Seals/Sealant, Duct Bank Spacer and Pull

Tape. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Communication Distribution Tray and

Hanger System Componenets

Including, but not limited to; Cable Tray, Tray and Conduit

Hanger, Tray and Conduit Attachment and Anchor. Conform to

UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Facility Communication Wire Way

Including, but not limited to; Wire Way, Markings, Hanger, Attachment and Anchor. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project

Specification.

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 9 of 11

NORTH PHANTOM LAUNDRY

BUILDING A

IT

E M

D E

S

IG

N A

T

IO

N

DATE

CONTRACTOR

NOTIFIED

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

C E

R T

IF

IC

A T

IO

N

M P

L

IA

N C

E

D R

A W

IN

G

S

S A

M P

L E

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E

E C

IF

IC

A T

IO

N

M A

N U

F A

C T

U R

E

R R

A N

T Y

C A

T A

L O

G

D

A T

A

PROJECT NUMBER

DHAF 12-0012

REMARKS

TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER

SCHEDULE OF MATERIAL SUBMITTALS

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

F O

L L

O W

-U P

C O

N T

R A

C T

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

O P

E R

A T

T R

U C

T

IO

N S

T E

S T

R E

S U

L T

S

D E

S

IG

N O

T H

E R

R E

Q U

IR

E

D S

U B

M

IS

S

T E

D A

T E

R E

C E

IV

E

D

N T

R A

C T

IN

G

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Communication Enclosures

Including, but not limited to; Enclosure, NEMA Rating, Mounting

Bracket, Stand/Strut, Utility Pad and Conduit Sweep. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Communication Wiring

Including, but not limited to; Interior and Exterior Data Cabling, CATV Cabling, Telephony Cabling. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB

Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Communication Exterior Termination

Including, but not limited to; Wall Penetration, Conduit Sweep, Mounting, Attachment, Anchor, Grounding Bus, Backplane and

Termination Hardware. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project

Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Communication Data Server Cabinet

Including, but not limited to; Cabinet, Mounting, Attachment, Anchor, Grounding Bus, Backplane and Termination Hardware.

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

CATV Wall Mounting

Including, but not limited to; Mounting, Bracket, Attachment and

Anchor. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project Specification.

Catalog Specification / Data Sheet /

Installation Drawing and Detail:

Interior and Exterior, Communication

Distribution

Including, but not limited to; Receptacle, Face Plate, Connectors, Enclosure, J-Box, Patch Panel, Mounting, Bracket, Conduit Sweep. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within ADAB Project

Specification.

Design / Calculation / Construction

Drawing and Detail: Communication

Distribution System

Including, but not limited to; Interior and Exterior Wiring, Interior and Exterior Duct Bank / Conduit / Tray Layout, Interior and

Exterior Switch and Receptacle Layout, Single Line Design and

Service Schedule. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and ADAB

Project Specification.

Design / Calculation / Construction

Drawing and Detail: Communication

Manhole / Handhole and Covers

Including, but not limited to; Structural Loading Evaluation and

Bouyancy Evaluation. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and

ADAB Project Specification.

Test Result: CAT 6 (Class E) Data

Cable Testing

Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and ADAB Project

Specification.

Test Result: Communication

Distribution System Including, but not limited to; Wire Insulation, Voltage, Continuity and Data Integrity. Conform to UFC 1-200-01, as well as, but not limited to, corollary specification within NEC, IEC and ADAB

Project Specification.

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

NOT ANTICIPATED FOR THIS PROJECT

USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 10 of 11

NORTH PHANTOM LAUNDRY

BUILDING A

IT

E M

D E

S

IG

N A

T

IO

N

DATE

CONTRACTOR

NOTIFIED

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

C E

R T

IF

IC

A T

IO

N

M P

L

IA

N C

E

D R

A W

IN

G

S

S A

M P

L E

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E

E C

IF

IC

A T

IO

N

M A

N U

F A

C T

U R

E

R R

A N

T Y

C A

T A

L O

G

D

A T

A

PROJECT NUMBER

DHAF 12-0012

REMARKS

TO BE COMPLETED BY CONTRACT ADMINISTRATORTO BE COMPLETED BY PROJECT ENGINEER

SCHEDULE OF MATERIAL SUBMITTALS

D A

T E

T O

C

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

F O

L L

O W

-U P

C O

N T

R A

C T

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

O P

E R

A T

T R

U C

T

IO

N S

T E

S T

R E

S U

L T

S

D E

S

IG

N O

T H

E R

R E

Q U

IR

E

D S

U B

M

IS

S

T E

D A

T E

R E

C E

IV

E

D

N T

R A

C T

IN

USAF Form 66, SEP86 COPY 1 - CONTRACT FILES Page 11 of 11

Other files for this federal contract opportunity

Other files attached to Construct Phantom North Laundry Facility (A), newest first.
File Type Posted
Pre Proposal Confrence.pptx PPTX presentation
QUESTIONS AND ANSWERS.pdf PDF
ATTACHMENT 3 —
FA5706-12-R-0034-0001 Laundry A.pdf PDF
ATTACHMENT 1 - Statement of Work.pdf PDF
ATTACHMENT 2 - Specifications.pdf PDF
FA5706-12-R-0034.pdf PDF
ATTACHMENT 3 - Plans - DHAF12-0012 Facility A.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .