ATTACHMENT#2 APPENDIX B TANGO LOOP UTILITY MAPS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_4_Solicitation_FA568218R0001.pdf | ||
| Amendment_2_Solicitation_FA568218R0001.pdf | ||
| Amendment_1_Solicitation_FA568218R0001.pdf | ||
| Attachment_9_Experience_Information_Sheet.docx | DOCX document | |
| Attachment_8Experience_Overview_Sheet.docx | DOCX document | |
| Attachment_6-Appendix_F_-_Tango_Loop_Concept_Communication_Plan.pdf | ||
| PWS_11_October_2017.pdf | ||
| Attachment_3-Appendix_C_-_Tango_Loop_Diagrams.pdf | ||
| Solicitation__FA568218R0001_26_Oct_2017.pdf | ||
| Attachment_5-Appendix_E_-_Tango_Loop_Concept_Furniture_Plan.pdf | ||
| Attachment_4-Appendix_D_-_Tango_Loop_Concept_Dimension_Plan.pdf | ||
| Attachment_1-Appendix_A_-_Tango_Loop_Temporary_Facility_Specifications.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TEMPORARY FACILITIES
UTILITY MAPS
22 AUGUST 2017
Temporary Facility Areas Scope of Work 31st AMXS Administration / Latrine – 465 square meters
57th Admin Office Facility Scope of Work Requirements HVAC (Heating, Ventilation, Air Conditioning) Electrical Connection to Utility Water Connection to Utility
465 SM
Admin Facility
Legend Existing Electrical Substation / Electrical Panel Existing Underground Electrical Conduit New Above Grade Electrical Panel New Above Grade Electrical Line
Existing Above Grade Water Connection Existing Underground Water Line New On-Grade Water Connection New On-Grade Water Line
Existing On-Grade Sewer Connection Existing Underground Sewer Line New On-Grade Sewer Connection New Underground Sewer Line
Existing Communication Handhole Existing Underground Communication Line New Communication Handhole New Underground Communication Line
Latrine