PWS_-_JTAC_01_Aug_14.pdf
PDF 54 KB Posted
- Attached to
- Joint Terminal Attack Controller (JTAC) training Federal contract opportunity
- Solicitation number
- FA5641-14-R-0003
About this file
PWS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP_Questions_Upload.pdf | ||
| Atch_L-2_Cov_Ltr_ _PPQ.docx | DOCX document | |
| Atch_L-1_PPID.docx | DOCX document | |
| Atch_L-3_Subcontract_Consent _Client_Auth_Ltr.docx | DOCX document | |
| FA5641-14-R-0003_RFP_13_Aug_14.pdf | ||
| JTAC_Synopsis.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Flying Hours and Close Air Support Training
(JTAC II)
Performance Work Statement (PWS)
USAFE/AGOS, 4 ASOG, and WPC, Det 2
01 Aug 2014
TABLE OF CONTENTS
SECTION 1 DESCRIPTION OF SERVICES/GENERAL INFORMATION/ADMIN
1.0. Description of Services
1.1. Background
1.2. Specific Tasks
1.2.1. Support for USAFE AGOS, 4 ASOG, and WPC, Det 2
1.2.2. Work Period
1.2.3. Night Operations
1.2.4. Aircrew/Pilot Requirements
1.2.5. Aircraft
1.2.6. Tactical Employment
1.2.7. Place of Performance
1.2.8. Briefing Requirements
1.3. Access to US Government Facilities
1.4. Conformance with Environmental Management Systems
SECTION 2 SERVICES SUMMARY
2.0. Services Summary
SECTION 3 GOVERNMENT-FURNISHED PROPERTY AND SERVICES
3.0. Government Furnished Property and Services
3.1. Government Furnished Equipment
SECTION 4 APPENDICES
Appendix A – Acronyms
Appendix B – Publications
Appendix C – Contractor Manpower Reporting
SECTION 1 DESCRIPTION OF SERVICES/GENERAL INFORMATION/ADMIN
1.0. Description of Services. The contractor shall provide non-personal services to include all management, tools, equipment, aircraft and labor to provide up to 320 flying hours per year for Close Air
Support (CAS) Joint Terminal Attack Controller (JTAC) training in support of; 1) the United States Air
Force in Europe (USAFE), Warrior Preparation Center (WPC), USAFE Air Ground Operations School
(AGOS); 2) 4th Air Support Operations Group (ASOG) and subordinate units and; 3) WPC, Detachment
2 in their primary training areas in Germany and/or in areas agreed upon by user organization and contractor. Performance includes flying a maximum of 12 hours per day to include night and may include
Saturdays and Sundays. In addition, the Government reserves the right to negotiate an increase to the requirement to include real time Video Down Link (VDL) capabilities with the contractor. The VDL capability is not presently part of the contract requirements; the information is provided solely for the contemplation of interested parties. For the purpose of this contract/PWS, all reference to 4 ASOG includes members of the 4 ASOG and their associated subordinate units. The services required under this
PWS are not mission essential.
1.1. Background. From forward positions, JTACs direct the action of combat aircraft engaged in close air support and other offensive air operations. A qualified and current JTAC will be recognized across the
U.S. Department of Defense as capable and authorized to perform terminal attack control. JTAC personnel are recognized experts in directed release of ordnance during covert and non-covert operations, expert in all aspects of rotary & fixed wing close air support and non-traditional intelligence, surveillance, reconnaissance (ISR) operations. They are also trained radio operators and work with tactical computers, moving map displays, field expedient antennas, air to ground digital & video downlinks, LASER & thermal optics, orienteering, global positioning system (GPS)-Falcon View vehicle navigation, maps, mission planning, radar beacon operations and integrating multiple airborne command and control & attack assets.
1.2. Specific Tasks.
1.2.1. Support for USAFE, WPC AGOS, 4 ASOG, and WPC Detachment 2. Contractor shall provide
CAS support at times and days of the week as determined by USAFE AGOS, 4 ASOG and WPC
Detachment 2 schedulers, weather dependent in accordance with (IAW) International Civil Aviation
Organization (ICAO) Visual Flight Rules (VFR ) weather minimums as identified in Air Force
Instruction (AFI) 11-202V3, Table 7.2. The USAFE AGOS scheduler is the lead scheduling agent for contract flying hours, irreconcilable conflicts between customers will be resolved by HQ USAFE-
AFAFRICA/A3C.
1.2.2. Work Period. Contractor will provide CAS support, as coordinated with USAFE AGOS, 4 ASOG and WPC Detachment 2 schedulers, Monday through Friday (primary) and Saturday/Sunday
(approximately 4 weekends per year).
1.2.2.1. Flying Hours Execution. The contractor shall provide up to 35 flying hours per flying week, with a maximum of 12 flying hours per day/night and a minimum of 1.5 hours per flying day. Flying schedules (fly weeks/days) are drafted yearly, and confirmed quarterly. The United States Government
(USG) will provide the draft yearly schedule to the contractor. The USAFE AGOS, 4 ASOG and WPC, Detachment 2 schedulers will provide to the contractor the specific fly week/days dates, hours and locations to the contractor 90 days prior to the event. Flying weeks may require the employment of more than one aircraft to meet scheduling needs with each aircraft providing a maximum of 12 flying hours per day/night. Contractor must possess the flexibility to increase or decrease weekly planned flying support by 10 hours (not to exceed 35 hours) if notified a minimum of two working days prior to the first scheduled mission.
1.2.2.2. Saturday and Sunday flying periods/requirements. The contractor is responsible to obtain any
Host Nation (HN) waivers required to fly weekends, to include waivers for the takeoff and landing base and the designated training areas. Flying period may include German holidays. The contractor’s available flying period during a single day/night schedule will not exceed 12 hours.
1.2.2.3. Contingency Scheduling. The contractor shall have the ability to adapt scheduled times to actual needs, i.e. weather conditions, student progress, etc. The contractor and customer/user organization will coordinate any same day scheduling changes no later than one hour prior to the scheduled aircraft takeoff time.
1.2.3. Night Operations. The contractor shall have night CAS tactical employment capability; period of
“night” is defined in AFI 11-202V3, Atch 1. Contractor must possess their own IR pointer and pilot/aircrew night vision device capable of viewing both the JTAC and pilot/aircrew pointers
1.2.4. Pilot/Aircrew and Aircraft Requirements. Contractor pilots/aircrew must speak/understand English and be licensed IAW HN rules. The contractor shall possess and provide copies to USG all required aircraft and pilot certification and/or licenses allowing them to conduct CAS flying operations in
Germany.
1.2.5. Aircraft. The contractor’s aircraft must be fixed-wing aircraft capable of speeds in excess of 300
Knots Indicated Air Speed (KIAS). The contractor’s aircraft must be fighter/attack aircraft which has been specifically designed for Close Air Support/air-to-ground combat operations or Close Air
Support/air-to-ground training operations.
1.2.5.1. Minimum Equipment. The contractor’s aircraft must possess Ultra High Frequency (UHF) and
Very High Frequency (VHF) radio capability for CAS operations IAW Air Force Tactics, Techniques and
Procedures (Instruction) (AFTTP(I)) 3-2.6, November 2012.
1.2.6. Tactical Employment (Day/Night). The contractor aircrew/pilots must be proficient in CAS procedures and techniques IAW Joint Publication (JP) 3-09.3, July 2009 Chapter V and AFTTP(I) 3-2.6, November 2012 Chapter IV. Contractor will execute CAS procedures in scenarios as provided by customer/user organization.
1.2.6.1. The contractor aircrew/pilots must be proficient in high, medium and low altitude tactical employment and attack deliveries to include pop-up-attacks IAW JP 3-09.3, Chapter V. High altitude is defined as simulated weapons release above 15,000 feet AGL, medium altitude is defined as tactics flown above 8,000 feet AGL and low altitude is defined as tactics flown below 8,000 feet AGL IAW HN directives.
1.2.6.2. The contractor aircrew/pilots must be proficient in night employment and attack deliveries to include use of Night Vision Devices as outlined in JP 3-09.3.
1.2.6.3. The contractor must possess the ability to simulate varying combat aircraft weapons loads/deliveries in accordance with the CAS scenarios provided by and coordinated with the user.
Specific CAS scenarios will be coordinated between contractor and user no later than one week prior to sortie execution.
1.2.6.4. The contractor aircrew/pilots must be proficient in target plotting, both in latitude/longitude
(Lat/Long) and Military Grid Reference System (MGRS), and possess ability to convert between
Lat/Long and MGRS.
1.2.7. Place of Performance: 1) 100 kilometer (km) radius centering on the USAFE AGOS, Kaiserstrasse
84, 67661 Kaiserslautern - Einsiedlerhof, Germany and; 2) 100 km radius centering on the city of
Amberg, Germany with primary working areas of Grafenwoehr and Hohenfels training ranges. Additional training ranges/areas include but are not limited to: Baumholder, Polygone, and/or anywhere in
Temporary Reserved Airspace (TRA) 205 A thru D (TRA: refers to designated training airspace in
Germany. Any other location/area(s) may be used if agreed upon by user organization, contractor and
Host Nation. The amount of requests for other locations are unknown at this time but are estimated at seven times annually. Contractor sorties will be flown single-ship (single-aircraft) unless coordinated prior with USG user. Contractor shall have the capability to support CAS operations at two different locations simultaneously i.e., an aircraft at both locations at the same time working separate CAS scenarios. The USAFE AGOS, 4 ASOG, and/or WPC Det 2 organizations are responsible to schedule range and associated air space.
1.2.7.1. Contractor aircraft home station must be within a 500 kilometer (km) radius centering on
Nuremburg (Bavaria), Germany. Contractor must be able to forward deploy and employ aircraft, for up to 7 continuous days, within a 125 kilometer (km) radius of the planned target area (as coordinated with
USAFE AGOS, 4 ASOG and WPC, Det 2). Deployment periods of longer than 7 days are possible if agreed upon by user organization, contractor and Host Nation if no impact to contract cost. Any changes that could increase costs to the Government require CO approval through contract modification.
1.2.8. Briefing Requirements. Contractor must have the ability to pre-brief and de-brief (ex: telephonic, e-mail, face-to-face) with customer units IAW AFI 11-214, Attachment 3.
1.3. Access to USG Facilities. Contractor will not need or be provided access to USG facilities.
1.4. Conformance with Environmental Management Systems
The contractor shall perform work under this contract consistent with the relevant environmental policy and objectives identified in the installation environmental management system (EMS) applicable for your contract. The contractor shall perform work in a manner that conserves water, energy and other resources to the maximum extent feasible and ensure minimum production of waste as possible, giving preference to less toxic materials whenever available and still reliable for their work. In the event an environmental non-conformance or non-compliance of host nation and USAF environmental laws and regulations associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of non-compliance, the contractor shall respond and take corrective action immediately. In the case of non-conformance, the contractor shall respond and take corrective action based on the time schedule established by the EMS coordinator.
Conformance with Environmental Requirements
The contractor shall perform all work IAW applicable host nation and US Air Force environmental laws, regulations and operating standards. The contractor shall be immediately capable of understanding and addressing environmental laws and regulations as they pertain to work performed under this contract.
USAF environmental laws & requirements can be found at the EMS Sharepoint Website:
https://ice.usafe.af.mil/sites/EMS/Legal%20%20Other%20Requirements/Forms/AllItems.aspx
SECTION 2 SERVICES SUMMARY
2.0. The contract service requirements are summarized in performance objectives that relate directly to mission critical items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement.
SS# Performance Objective PWS
Reference
Performance
Threshold
1 Check in on schedule time with
JTAC/Range Control
1.2.1., 1.2.2., 1.2.2.1., 1.2.2.2., 1.2.2.3.
80% on time / remaining 20 % w/in 30 minutes of scheduled time
2 Check out on scheduled time, unless previously arranged with JTAC/ Range
Control
1.2.1., 1.2.2., 1.2.2.1., 1.2.2.2., 1.2.2.3.
90% on scheduled time / remaining
10% no earlier than
10 minutes before scheduled time
3 Provided terminal attack control procedures in accordance with (IAW)
JP 3-09.3 & AFTTP(I) 3-2.6
1.2.6, 1.2.6.1., 1.2.6.2., 1.2.6.3,1.2.6.4
100% of the time
4 Aircrew/Pilots & Aircraft capable of flying Close Air Support
1.2.3., 1.2.4, 1.2.5, 1.2.6, 1.2.8.
100% of the time
SECTION 3 GOVERNMENT-FURNISHED PROPERTY AND SERVICES
3.0. Government Furnished Property and Services. None.
3.1. Government Furnished Equipment. None.
SECTION 4 APPENDICES
Appendix A – Acronyms
AFAFRICA Air Force Africa
AFTTP(I) Air Force Tactics, Techniques and Procedures (Instruction)
AGOS Air Ground Operations School
ASOG Air Support Operations Group
AFI Air Force Instructions
CAS Close Air Support
EO Electro-Optical
FL Flight Level
GPS Global Positioning System
HN Host Nation
IAW In Accordance With
ICAO International Civil Aviation Organization
IR Infra-red
ISR Intelligence, Surveillance, and Reconnaissance
JP Joint Publication
JTAC Joint Terminal Attack Controllers
JT Joint Terminal
KIAS Knots Indicated Air Speed
Km Kilometer
Lat Latitude
Long Longitude
MGRS Military Grid Reference System
NATO North Atlantic Treaty Agreement
PRF Pulse Repetition Frequency
PWS Performance Work Statement
QC Qualification Course
ROVER Remote Optical Video Enhanced Receiver
STANAG Standardization Agreement
TRA Temporary Reserved Airspace
UHF Ultra High Frequency
US United States
USG United States Government
USAFE United States Air Force in Europe
VDL Video Down Link
VHF Very High Frequency
VFR Visual Flight Rules
WPC Warrior Preparation Center
Appendix B – Publications
AFI 11-202 Volume (Vol) 3, Flying Operations, General Flight Rules, 22 October 2010, http://www.e-publishing.af.mil/.
AFTTP(I), Air Force Tactics, Techniques and Procedures (Instruction), 3-2.6, Nov 2012.
AFI 11-214, Air Operations Rules and Procedures, 14 Aug 2012, http://www.e-publishing.af.mil/.
AFI 13-112, Vol I, Joint Terminal Attack Controller (JTAC) Training Program, 15 Feb 2008, IC 2 22 Jul
2013, http://www.e-publishing.af.mil/.
AFI 13-112, Vol II, Joint Terminal Attack Controller (JTAC) Standardization /Evaluation Program, 21
Feb 2008, IC 1, 18 May 2009, http://www.e-publishing.af.mil/.
AFI 13-113, Vol I, Tactical Air Control Party (TACP) and Air support Operations Center (ASOC)
Training Program, 14 June 2012, http://www.e-publishing.af.mil/.
JP 3-09.3., Close Air Support, 8 July 2009, supplied by Quality Assurance Personnel (QAP).
STANAG 3797, Ed 6, (ATP-3.3.2.2.); Minimum Qualifications for Forward Air Controllers and Laser
Operators in Support Of Forward Air Controllers, 4 February 2014, supplied by QAP.
STANAG 7144 Ed 4, (ATP 3.3.2.1); Tactics, Techniques and Procedures for Close Air Support and Air
Interdiction, 17 February 2011, supplied by QAP.
Air Combat Command JTAC QC syllabus Dec 2009, Joint Terminal Attack Controller (JTAC)
Qualification Course (QC) Syllabus, supplied by QAP.
Appendix C – Contrator Manpower Reporting
General Information. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for Flying Hours and Close Air Support Training via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.
Reporting. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the
FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.
Uses and Safeguarding of Information. Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
User Manuals. Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.
File details come from the government source that posted it. Updated .