Final_PWS_Fire_Suppression_22_April_13.doc
DOC document 102 KB Posted
- Solicitation number
- FA5613-13-R-0021
About this file
Attachment 1 Performance Work Statement (PWS)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_responses_14_Jun_2013.docx | DOCX document | |
| Questions_and_responses_13_Jun_2013.docx | DOCX document | |
| Cancellation_of_Site_Visit.docx | DOCX document | |
| Attachment_3_PPQ.doc | DOC document | |
| EMS_Flyer.pdf | ||
| FA5613-13-R-0021.doc | DOC document | |
| Appendix_A_Fire_Suppression_Systems_Listing_31_Jan_13.xls | XLS spreadsheet | |
| Attachment_5_Site_Visit_Reservation.doc | DOC document | |
| HISTORICAL_WORKLOAD_DATA_FOR_REPAIR_CALLS.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
Performance Work Statement
FA5613-13-R-0021
PERFORMANCE WORK STATEMENT
FOR
MAINTENANCE AND REPAIR OF
FIRE SUPPRESSION SYSTEMS
22 February 2013
786 CEU/CEUS
RAMSTEIN AB, GERMANY
PERFORMANCE WORK STATEMENT (PWS)
FOR
MAINTENANCE AND REPAIR OF FIRE SUPPRESSION SYSTEMS
1. DESCRIPTION OF SERVICES. The contractor shall provide all material, tools, supplies, equipment, labor, management, and transportation necessary to maintain and repair installed kitchen fire suppression systems at Ramstein Air Base, Vogelweh, Einsiedlerhof, Landstuhl Army Regional Medical Center, CTS, Bann and Kapaun Air Station. All maintenance, inspection, and repair work shall be performed in accordance with (IAW) standard German commercial practices and in accordance with local, state, or federal applicable standards and codes or manufacturer recommendations and all required safety regulations Unfallverhuetungsvorschrift (UVV). The most stringent of these shall apply. Prior to the contract start date, the contractor shall submit to the Contracting Officer (CO) and Contracting Officer Representative (COR) certification of employee’s qualification and training for all employees performing work under this contract.
1.1. BASIC SERVICES. The contractor shall perform maintenance semiannually and repair all installed kitchen fire suppression systems listed in Appendix A, Fire Suppression Systems Listing. The Fire Suppression contractor takes total service responsibility for the equipment identified in the contract. The contractor shall perform all inspections, maintenance, routine and emergency repair service calls. The equipment to be maintained and repaired includes all related system detection devices, system control panels and wiring up to the facility main fire alarm system. The systems shall not be changed or modified. The contractor shall maintain and repair the installed kitchen fire suppression systems in accordance with manufacturer’s instructions or the regulations and standards listed in paragraph 1, whichever is more stringent.
1.2 . MAINTENANCE. The contractor shall review the current preventive maintenance records of all installed kitchen fire suppression systems at time of award and semi-annually thereafter and provide a proposed work schedule to the COR within five (5) business days . The contractor shall perform operational tests and recurring preventive maintenance semiannually on all kitchen fire suppression systems in accordance with manufacturer’s instructions or the regulations and standards listed in paragraph 1.8. of the PWS, whichever is more stringent.
1.3 . ROUTINE REPAIRS. The Contracting Officer (CO) or Contracting Officer Representative (COR) will notify the contractor of repairs to be made from the discrepancy reports resulting from the inspections made by the contractor or customer service calls. The contractor shall report to the work location no later than one business day (24 hours) after notification, survey the repair, and provide the COR an estimated overall cost of repair no later than one business day after survey for approval. A detailed cost estimate shall be submitted by the contractor within five (5) business days and be broken out into parts needed, labour hours rate, building number, kind of system, malfunction, and description of work. The contractor shall commence and complete repair work no later than five business days after receiving permission from the CO or COR. All invoices for the repair work shall be annotated with call number, date and time of repair service call, labor hours, parts, building number, kind of system, malfunction and description of work.
1.4 . EMERGENCY REPAIRS. The CO or COR will notify the contractor of repairs to be made based on customer service calls. The contractor shall provide a 24-hour emergency service with a 3-hour response time. This emergency service includes weekends and all German and American holidays. Once the problem is diagnosed, the contractor shall immediately inform the COR about repairs needed and submit an estimated overall cost estimate. Upon receiving approval from the CO or COR to make the needed repairs, the contractor will have 24 hours to complete the work and to submit a written detailed cost estimate broken out into parts needed, labour hours rate, building number, kind of system, malfunction, and description of work. If required parts are not on hand, the contractor shall submit a request for extension in writing to the COR stating the amount of time needed to complete the repair. All invoices for the emergency repair work shall be annotated with call number, date and time of repair service call, parts, building number, kind of system, malfunction and description of work.
1.5 . PARTS AND MATERIAL. The contractor shall be reimbursed for all cost of parts and material needed for repairs for which proper approval has been obtained by the CO or COR. For special ordered or manufactured parts, a copy of the manufacturer/ wholesaler’s invoice shall be attached to the applicable invoice as proof of the amount paid. Reimbursement is limited to the net price of the parts listed. Parts to be used are of original manufacturer or equivalent.
1.5.1. SUBMISSION OF SCHEDULES AND REPORTS. The contractor shall furnish a Maintenance Scheduling Plan in English to the COR from the 786 CES/CEUS, Service Contract Management section five (5) business days before performance of service. The plan shall include: building number, date, and time work will be performed. The contractor shall also include in the inspection report, the year in which hydrostatic testing is required for all storage containers/cylinders. If the hydrostatic test date cannot be obtained from existing cylinder markings/labels, then the contractor shall annotate this in their report.
1.5.2. DEVIATIONS TO SCHEDULE. In the event the contract schedule must be modified for a specific facility, the contractor and building Point of Contact POC/Alternate must agree on the change and in turn must notify the COR of the change in writing. The contractor shall submit any deviations in scheduling to the COR before the date originally scheduled.
1.5.3. CONTRACTOR LABOR HOURS. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Air Force via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.
Reporting inputs will be for the labor executed during the period of performance for each
Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.
*Reporting Period: Contractors are required to input data by 31 October of each year.
1.5.4. Uses and Safeguarding of Information. Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
1.5.5. User Manuals. Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.
1.6. GENERAL INFORMATION.
1.6.1. QUALITY
CONTROL. The contractor shall have a quality control program to ensure services are performed in accordance with manufacturer’s instructions or the regulations and standards listed in paragraph 1. whichever is more stringent. The contractor shall have procedures to identify and prevent defective services from reoccurring. As a minimum, the contractor shall have quality control procedures that address the areas identified in Section 2.0, Services Summary. The contractor shall designate a quality control inspector and provide the name, work address, and a number that can be reached during normal business hours, and after hours to the COR and CO no later than fourteen (14) business days after contract award. The contractor shall submit a copy of his quality control plan to the COR and CO no later than fourteen (14) business days after contract award.
1.6.2. HOURS OF OPERATION. The contractor shall coordinate all work to be accomplished IAW the contract and with the building custodian for each facility to be maintained and repaired.
The contractor shall coordinate all work to be accomplished IAW contract with the building custodian for each facility to be maintained and repaired. Emergency repairs may be required during non-business or off-hours (early AM or late PM), Monday through Sunday including holidays. Business hours are 0700-1600, Monday-Friday. The time for maintenance and repairs to be performed shall be coordinated before any work is scheduled.
List of U.S. Holidays:
1.
January 1st
- New Year’s Day
2.
3rd Monday in January
- Martin Luther King’s Day
3.
3rd Monday in February
- Washington’s Birthday
4.
Last Monday in May
- Memorial Day
5.
July 4th
- Independence Day
6.
1st Monday in September
- Labor Day
7.
2nd Monday in October
- Columbus Day
8.
November 11th
- Veteran’s Day
9.
4th Thursday in November
- Thanksgiving Day
10.
December 25th
- Christmas Day
Note:
When the holiday is on a Saturday, the preceding Friday will be the U.S. Holiday.
When the holiday is on a Sunday, the following Monday will be the U.S. Holiday.
List of German Holidays:
1.
January 1st
- New Year (Neujahr)
2.
Karfreitag
- Good Friday
3.
Ostermontag
- Easter Monday
4.
May 1st
- Labor Day (Tag der Arbeit)
5.
Himmelfahrt
- Ascension Day
6.
Pfingstmontag
- White Monday (7th Monday after Easter Monday)
7.
Fronleichnam
- 2nd Thursday after Ascension Day
8.
October 3rd
- Day of German Unity
9.
November 1st
- All Saints Day
10.
December 25th-26th
- Christmas
1.7. CONTRACTOR PERSONNEL.
1.7.1. OTHER PERSONNEL. At least one individual per work team shall be able to understand and speak a minimum level of conversational English (Able to satisfy minimum courtesy requirements and maintain very simple face-to-face conversations on familiar topics. Sufficient comprehension to read very simple written material). The contractor shall provide a list of names including passport number of all the people working under this contract to the CO and COR. Any required changes to this listing shall be submitted in writing to the CO ten days (10) prior to the change taking effect.
1.7.2 SECURITY REQUIREMENTS. All personnel employed by the contractor in the performance of this PWS and any representative of the contractor entering the Government installation in the performance of this PWS, shall abide by all security regulations of the installation and obtain a Polizeiliches Fuehrungszeugnis in order to register at the Pass Office for a base pass. Citizens from certain countries are currently banned from entering U.S. installations; Security Forces maintains a list of these banned countries. This includes individual contractor employees, therefore any contractor employee who is a citizen of one of these countries will not be allowed to access the installation. The list of excluded countries is subject to change without modification or amendment of the PWS or contract.
1.7.3. ACCESS TO RESTRICTED AREAS. Access to secure areas must be coordinated with the COR at 06371-47-4879. Restricted areas require a notification through the COR to the building custodian at least one week prior to the starting date to allow time for coordination. The following building is in secure and restricted areas:
RAB
Bldg 543
1.7.4. PERFORMANCE OF SERVICES DURING MILITARY EXERCISES OR OPERATIONS. Work stoppages may occur during the execution of this PWS due to military exercises or operations. During these times, access to areas supporting the exercise or operation may be curtailed or not allowed. During scheduled and unscheduled exercises or operations, the contractor shall be prepared to move to other work locations or suspend operations at no additional cost to the Government.
1.8. APPLICABLE GUIDANCE. The following list of regulations is the bare minimum requirements to which the contractor shall comply. Regulations may be added or deleted from this list.
a. UFC 3-600-02, 2-2.14 (table 2-20), 2-2.15 (table 2-21), and 2-2.18 (table 2-25) – Unified Facilities Criteria b.
NFPA Section 17 – Standard for Dry Chemical Extinguishing System, 2013 Edition c.
NFPA Section 17A – Standard of Wet Chemical Extinguishing Systems, 2013 Edition d.
NFPA Section 72 – National Fire Alarm and Signaling Code, 2013 Edition e.
NFPA Section 12 – Standard on Carbon Dioxide Extinguisher Systems, 2011 Edition f.
VDE Regulations g.
VBG Regulations h.
VDS Regulations i.
DIN 14675
j.
DIN EN ISO 9001:2000
1.8.1. CONFORMANCE with Environmental Management Systems. The Contractor shall perform work under this contract consistent with the relevant environmental policy and objectives identified in the installation Environmental Management System (EMS) applicable for your contract. The Contractor shall perform work in a manner that conserves water, energy and other resources to the maximum extent feasible and ensure minimum production of waste as possible, giving preference to recycling and reutilization opportunities. Furthermore, the Contractor shall give preference to less toxic materials whenever available and still reliable for their work. In the event an environmental nonconformance or noncompliance of host nation and USAF environmental laws and regulations associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall respond and take corrective action immediately. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the EMS Coordinator. In addition, the Contractor shall ensure that their employees are aware of the EMS on base and how these requirements affect their work performed under this contract.
All on-site contractor personnel shall receive the installation EMS awareness level information.
The contractor shall perform all work in accordance with applicable German and US Air Force environmental laws, regulations and operating standards, including but not limited to the Final Governing Standards (FGS) for Germany. The contractor shall be immediately capable of understanding and addressing environmental laws and regulations as they pertain to work performed under this contract.
2.0. SERVICES SUMMARY.
Performance Objective
| PWS Paragraph |
| Performance Threshold |
SS-1 Perform Maintenance.
All systems are properly maintained in accordance with the PWS. All schedules, reports, and other documents submitted accurately and in time.
| 1., 1.1., 1.2. and 1.5.1. |
| 100% of the time |
SS-2 Perform Routine Repairs.
Responds to notification for routine repair within 24 hours; provides detailed cost estimate within 5 working days after permission from the COR to perform the repair is received. Parts used are of original manufacturer or equivalent. All schedules, reports, and other documents submitted accurately and on time.
| 1., 1.3., 1.5. and 1.5.1. |
| 100% of the time |
SS-3 Perform Emergency Repairs.
Responds to notification for emergency repair within 3 hours; and work completed within 24 hours after approval. Parts used are of original manufacturer or equivalent. All reports submitted accurately and in time.
| 1.4., 1.5. and 1.5.1. |
| 100% of the time |
| SS-4 Submit Quality Control Plan |
| 1.6.1. |
| 100% of the time |
3.0. GOVERNMENT FURNISHED PROPERTY AND SERVICES.
3.1 . UTILITIES. The Government will furnish electricity in the performance of services in this contract. The Government is not responsible for furnishing adaptors for connecting contractor-furnished equipment to Government-furnished utilities.
3.2 . DAMAGE TO GOVERNMENT PROPERTY. The contractor shall report all damages to U.S. Government property within one hour after occurrence to the COR (480-4879). The contractor shall be responsible for reimbursing the U.S. Government no later than 30 calendar days of receipt of claim for all costs associated with damages to U.S. Government property in the performance of services in this contract.
APPENDICES.
A.
Fire Suppression Systems Listing