Contractor_questions.pdf
PDF 341 KB Posted
- Attached to
- Replace Ancillary Explosives Facility Federal contract opportunity
- Solicitation number
- FA5575-19-R-A005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Conformed_Solicitation_Amend2-_FA557519RA0050002.pdf | ||
| Solicitation_Amendment_FA557519RA0050002_SF_30.pdf | ||
| Solicitation_Amendment_FA557519RA0050001_SF_30.pdf | ||
| 18-2001,_Part_6.1,_Concept_Drawings.pdf | ||
| 18-2001,_Attachment_B,_Final_Governing_Standards_for_Spain,_May_2014.pdf | ||
| 18-2001,_Part_8,_Schedule_of_Material_Submittals.xlsx | XLSX spreadsheet | |
| 18-200~2.PDF | ||
| 18-2001,_Part_6.2,_Record_Drawings.pdf | ||
| Solicitation_-_FA557519RA005.pdf | ||
| 18-2001,_Statement_of_Work,_English_SC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA5575-19-R-A005
RPR MSA MAC Pad
Questions and Answers
1) In reference to the following paragraphs:
2.5. Facility 7015, Interior Fence
2.5.1. Civil Works
1. Install a new fence, including vehicle denial cable, enclosing the Access Road, the MAC pad and the berm (new construction works).
1.13. The new fence to be installed enclosing the MAC pad, berm and Access Road shall be joined to the
MSA perimeter fence. The fence shall comply with the Unified Facilities Criteria (UFC) 4-020-01, UFC
4-022-02 and UFC 4-022-03. The new fence, including vehicle denial cable, shall be of the same type as the MSA perimeter fence being designed or installed. The materials and execution of the new fence shall be in accordance with the requirements indicated on UFGS 32 31 13 Chain Link Fences and Gates, UFGS
32 31 13.53, High-Security Chain Link Fences and Gates, UFGS 34 71 13.16, Vehicle Crash Barriers and
UFGS 34 71 13.19, Active Vehicle Barriers.
Due to the reference of UFC 4-022-03 stating the number of vehicle denial cables to be installed depends on, among other factors to the risk assessment of the facility and this assessment is not supplied in the
SOW, we ask you to kindly provide us with this assessment information about these parameters to determine the number of cables to be installed according to regulations.
Government Response: the fence will require (3) Cables @ 1” diameter
2) According to the Solicitation document, Sub Factor – Past Experience, the offeror has to include with the proposal the following documents:
-3 to 5 example projects demonstrating design-build Project experience.
-3 to 5 example projects demonstrating the experience and capability of the A/E firm.
-3 to 5 example projects demonstrating the experience and capability of the Construction firm .
If a Project meets those three (3) requirements above, we would like to clarify if this project can be included to cover each of sections above (design-build, A/E firm experience, and Construction experience). I mean, the same Project would be included three (3) times once for each experience requirements.
Government response: The Contractor shall submit in total three to six example projects but, as a minimum, one of each type, as to say, one design-build, one A&E design and one construction project. These three projects shall belong to different contracts. Sections L and M of the solicitation have been amended to reflect this requirement.