PERFORMANCE WORK STATEMENT

(PWS)

FOR

RPL DISTANCE & BARRIER MARKERS

WO#17147

CIVIL ENGINEERING 496 ABS/CEORM

(30 July 2018)

PERFORMANCE WORK STATEMENT (PWS)

TABLE OF CONTENTS

SECTION PAGE

1. DESCRIPTION OF SERVICES 5

2. SERVICES SUMMARY 5

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES 6

4. GENERAL INFORMATION 6-8

5. APPENDICES 9-22

6. DRAWINGS 1

1. DESCRIPTION OF SERVICES. The contractor shall provide all the management, tools, supplies, equipment and labor needed to replace distance markers (20 units) and barrier markers (4 units) at both sides of runway at Moron Air Base.

1.1. Description of Work.

The work will consist of:

1.1.1. Distance markers: Replace existing halogen signs by a new LEDs technology, insulate transformer power supply shall be replaced under this service contract, the work shall be accomplished in accordance with appendix A requirements.

1.1.2. Barrier markers: Replace existing halogen signs by a new LEDs technology, insulate transformer power supply shall be replaced under this service contract, the work shall be accomplished in accordance with appendix A requirements.

1.1.3. Operation manual, including operation, maintenance, spare parts and procedures.

1.2. Brand Names.

Names indicated for materials are for the purpose of establishing a standard selection only. Other manufacturers' materials are acceptable provided they conform to all specified requirements.

Names indicated for the quality of model, give the quality standard to be achieved. Other manufacturer's materials are acceptable if it is equal to the quality and function of the suggested model. All selected material is subject to the approval of Contracting Officer.

1.3. Final Cleaning.

Final cleaning of installations affected by this contract

1.4. Period of Performance.

The period of performance for this contract is ninety (90) days of field work. The contractor will provide its deadline with its proposal.

The items mentioned and the list of main tasks do not limit in any way the responsibility of the contractor to perform all work required by the contract to provide a complete and operational installation.

2. SERVICES SUMMARY.

Performance Objective SOW Performance Threshold Activities. Par 1.1 100%

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES.

3.1. Use of Base Utilities: Base utilities are available to the Contactor at no additional expense to the Contractor. The following utilities shall be available from the existing Base utility connections in reasonable quantities:

a. Electricity 120/208 volts, 60 Hz.

b. Water.

All of the equipment, materials and labor required to accomplish the aforementioned items stipulated shall be supplied by the Contractor, as part of this contract.

4. GENERAL INFORMATION.

4.1. Security Requirements. The contractor will request installation access through 496

ABS/CE.

4.2. Physical Security. The contractor shall be responsible for safeguarding all government property provided for contractor use. At the close of each work period, government facilities, property, and materials shall be secured.

4.3. Hours of Operation.

4.3.1. Normal Hours of Operation. The contractor shall perform the services required under this contract during the following hours: Monday to Friday, 08:00-17:00. The contractor may work, with prior approval of the Contracting Officer, extended hours to ensure timely completion of work at no additional cost to the Government.

4.3.2. Recognized Holidays. The contractor is not required to provide service on the following days: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Days, Thanksgiving Day and Christmas Day. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.

4.4. Conservation of Utilities. The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions which prevent the waste of utilities which include the following:

4.4.1. Lights shall be used only in areas where and when work is actually being performed.

4.4.2. Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the contractor or by contractor employees unless authorized.

4.4.3. Water faucets or valves shall be turned off after the required use has been accomplished.

4.4.4. Government telephones shall be used only for official government business.

4.5. Records. The contractor shall be responsible for creating, maintaining, and disposing of only those government required records that are specifically cited in this PWS.

4.6. Environmental Controls:

4.6.1. Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect. If there is an increase or decrease in cost as a result of the change, the contractor shall inform the Contracting Officer pursuant to notice requirements and negotiate a modification to the contract.

4.6.2. Notification of Environmental Spills. If the contractor spills or releases any substance contained in 40 CFR 302 into the environment, the contractor or its agent shall immediately report the incident to Moron AB Fire Dept at 117. The liability for the spill or release of such substances rests solely with the contractor and its agent.

4.6.3. Material Storage and Use. The contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling. This includes hazardous materials.

4.7. Government Observations. Government personnel, other than contracting officers (COs) and quality assurance personnel (QAPs), may from time-to-time, with CO coordination, observe contractor operations. However, these personnel may not interfere with contractor performance or make any changes to the contract.

4.8. Safety Requirements. In performing work under this contract, the contractor shall:

4.8.1. Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.

4.8.2. Take such additional immediate precautions as the contracting officer may reasonably require for safety and mishap prevention purposes.

4.8.3. Develop and provide at the start of the orientation period or the start of the first operational performance period (if there is no orientation period) a safety plan for the protection of government facilities and property and to provide a safe work environment for contractor personnel.

4.8.4. Provide protection to government property to prevent damage during the period of time the property is under the control or in possession of the contractor.

4.8.5. Include a clause in all subcontracts to require subcontractors to comply with the safety provisions of this contract as applicable.

4.8.6. Record and report promptly (within one hour) to the contracting officer or designated government representative (GR), all available facts relating to each instance of damage to government property or injury to either contractor or government personnel.

4.8.7. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the contracting officer.

4.8.8. If the government elects to conduct an investigation of the accident/mishap, the contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.

4.8.9. Include a clause in each applicable subcontract requiring the subcontractor's cooperation and assistance in accident reporting and investigation.

4.9. Special Qualifications. The Contractor shall submit any commercial certifications and a reference of past performance on similar works performance to the existing as a means to verify experience in this field of work.

4.10. Continuation of Essential DOD Contractor Services During Crisis IAW DoD I 3020.37.

IAW AFI 63-124, para 2.7.1, and DODI 3020.37 this requirement is not considered mission essential.

4.11. Contract Restriction: In accordance with the Agreement of Defense and Cooperation between the Kingdom of Spain and the United States of America, any contract resulting from this notice/solicitation can only be entered into with companies authorized to carry out these activities in Spain under Spanish law. Companies must meet the requirements established by Spanish legislation for execution of Government works. In addition, in accordance with the Office of Defense Cooperation Policy Directive 400- 5 "(4) Spanish material, labor, and equipment must be used if permitted by the requirements of the contract specifications."

APPENDIX A

NICAL SPECIFICATION

APPENDIX A

SCOPE OF WORK

INDEX

1. SCOPE OF WORK

2. INSULATION TRANSFORMER ITX

3. AGSF-L GUIDANCE SIGNS

1. SCOPE OF THE WORK: This service contract includes the replacement of existing distance and barrier markers in both sides of the runway at Moron Air Base.

1.1. Distance markers:

Existing halogen technology distance signs, which indicate to the pilot the remaining distance of the runway shall be replaced by LED technology signs with the following characteristics:

- In accordance with FAA L858B(L)

- Double side sign, legend color white and background color black.

- Dimensions: 46x46x13 in

- Weight: 81 lb

- Transformer 150W, 60 Hz, 20/6.6 A.

- Power through leg with ON/OFF switch.

- High wind signs tested to a minimum wind load of 327 mph

- Model ADB SS31-72X3210 in accordance with par 3.

- Information of each sign as follow:

a. 1 & 10

b. 2 & 9

c. 3 & 8

d. 4 & 7

e. 5 & 6

f. 6 & 5

g. 7 & 4

h. 8 & 3

i. 9 & 2

j. 10 & 1

- Installed on each side of the runway replacing existing ones, on the existing concrete pads.

1.2. Barrier markers:

Existing halogen technology distance signs, which indicate to the pilot the barrier location shall be replaced by LED technology signs with the following characteristics:

- In accordance with FAA L858B(L)

- Double side sign, yellow circle and background color black.

- Dimensions: 46x46x13 in

- Weight: 81 lb

- Transformer 150W, 60 Hz, 20/6.6 A.

- Power through leg with ON/OFF switch.

- High wind signs tested to a minimum wind load of 327 mph

- Model ADB SS31-72X3210 in accordance with par 3.

- Installed on each side of the runway replacing existing ones, on the existing concrete pads.

2. ISOLATION TRANSFORMERS.

J - 8

TRANSFORMERS & CABLES

1215 Rev. Q I No Manual

ITX

Series Circuit Isolation Transformers

Compliance with Standards FAA: L-830 and L-831 AC 150/5345-47 (Current Edition) ICAO: Aerodrome Design Manual, Part 5 para. 3.2.1.7a

MIL: MIL-T-27535A

CSA: C 22.2 No. 180

Uses Designed for use in airfi eld lighting systems to isolate low-voltage lamps from the high operating voltages present on airfi eld series lighting circuits.

Features

• Quick and easy connection by means of factory-molded L-823 plugs and receptacles. Canadian transformers are designed to also accept Amerace 54Super type primary kits.

• Two single-conductor primary cables (8 AWG, 5,000 V) with a molded Style 2 plug on one lead and a molded Style 9 recep-tacle on the other lead; one two-conductor secondary cable (12 AWG 600 V) with Style 8 two-pin receptacle

• Complete water tightness – Cables are an integral part of the transformer and their sheath is molded in the transformer body

• May be buried directly in the ground, exposed to the sun, im-mersed in water, and exposed to other weather elements

• The outer molded jacket is acid-, alkali-, and oil-resistant and also resists deicing fl uids, ozone, and UV radiation

Electrical Supply

• Operates at 60 Hz (L-830) or 50 Hz (L-831) on series circuits rated up to 5,000 VAC

The primary windings of the transformer are connected in a 6.6 A or 20 A series circuit supplied by a constant current regulator. The continuity of the series lighting loop is maintained even if one or more lamps supplied by individual isolation transformer secondar-ies are open-circuited due to lamp failures. In addition, there is a complete separation of the high-voltage primary and low-voltage secondary windings.

Additional Isolation Transformers ADB Airfi eld Solutions is an approved OEM supplier of Amerace and Integro Isolation Transformers. If you would like information on transformers not described in this catalog sheet, please contact the ADB Sales Department.

Note

Series circuit components and connectors must be installed per the recommendations shown in FAA AC 150/5340-30 (latest revi-sion). There are many installation variables outside the control of ADB that may affect the overall circuit insulation resistance. ADB Airfi eld Solutions is not responsible for series circuit insulation resistance requirements above the limits defi ned in FAA AC 150/5340-30 or AC 150/5340-26 (latest revisions).

Ordering Codes

Style Rated Watts Hz

Prim.

Amps

Sec.

Amps

Eff. Min.

at 20°C Part No.

L-830-16 10/15 60 6.6 6.6 70% 35A0578

L-830-17 20/25 60 6.6 6.6 70% 35A0617

L-830-1 L-830-2

30/45 30/45

6.6

6.6 6.6

80% 80%

35C0077 35C0078

L-830-3 65 60 6.6 6.6 80% 35C0092

L-830-4 L-830-5

6.6

6.6 6.6

85% 85%

35C0080 35C0081

L-830-18 L-830-19

6.6

6.6 6.6

85% 85%

35A0650 35A0651

L-830-6 L-830-7

6.6

6.6 6.6

90% 90%

35C0082 35C0083

L-830-8 L-830-9 L-830-10 L-830-11

6.6

6.6

6.6 6.6

90% 90% 90% 90%

35C0084 35C0085 35C0086 35C0087

L-830-12 L-830-13 L-830-14 L-830-15

6.6

6.6

6.6 6.6

90% 90% 90% 90%

35C0088 35C0089 35A0224 35A0228

L-831-16 10/15 50 6.6 6.6 70% 35A0667

L-831-17 20/25 50 6.6 6.6 70% 35A0668

L-831-1 L-831-2

30/45 30/45

6.6

6.6 6.6

80% 80%

35C0077-1 35C0078-1

L-831-3 65 50 6.6 6.6 80% 35C0079-1

L-831-4 L-831-5

6.6

6.6 6.6

85% 85%

35C0080-1 35C0081-1

L-831-18 L-831-19

6.6

6.6 6.6

85% 85%

35A0652 35A0653

L-831-6 L-831-7

6.6

6.6 6.6

90% 90%

35C0082-1 35C0083-1

L-831-8 L-831-9 L-831-10 L-831-11

6.6

6.6

6.6 6.6

90% 90% 90% 90%

35C0084-1 35C0085-1 35C0086-1 35C0087-1

L-831-12 L-831-14

6.6 6.6

6.6

90% 90%

35C0088 35A0224-1

Notes

• All FAA-recognized L-830 and L-831 isolation transformers listed are ETL Certifi ed.

Product specifi cations may be subject to change, and specifi cations listed here are not binding.

Confi rm current specifi cations at time of order.

J - 9

ADB Airfi eld Solutions Leuvensesteenweg 585 B-1930 Zaventem Belgium

Telephone: +32 (0)2 722.17.11 www.adb-air.com

ADB Airfi eld Solutions, LLC 977 Gahanna Parkway Columbus, OH 43230

USA

Telephone: +1 614.861.1304 +1 800.545.4157

© ADB Airfi eld Solutions All rights reserved

1215 Rev. Q I No Manual

TRANSFORMERS & CABLES IXT I Series Circuit Isolation Transformers

Packaging

Style Part No.

Avg.

Weight lb (kg) Package Size in (cm)

L-830-16 L-831-16

35A0578 35A0667

4.8 (2.2)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-17 L-831-17

35A0617 35A0668

4.8 (2.2)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-1 L-831-1

35C0077 35C0077-1

7.0 (3.2)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-2 L-831-2

35C0078 35C0078-1

7.0 (3.2)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-3 L-831-3

35C0092 35C0079-1

10.0 (4.6)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-4 L-831-4

35C0080 35C0080-1

11.5 (5.2)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-5 L-831-5

35C0081 35C0081-1

11.5 (5.2)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-18 L-831-18

35A0650 35A0652

13.5 (5.2)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-19 L-831-19

35A0651 35A0653

13.5 (5.2)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-6 L-831-6

35C0082 35C0082-1

13.5 (6.1)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-7 L-831-7

35C0083 35C0083-1

13.5 (6.1)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-8 L-831-8

35C0084 35C0084-1

23.5 (10.7)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-9 L-831-9

35C0085 35C0085-1

23.5 (10.7)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-10 L-831-10

35C0086 35C0086-1

23.5 (10.7)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-11 L-831-11

35C0087 35C0087-1

23.5 (10.7)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-12 L-831-12

35C0088 35C0088-1

28.0 (12.7)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-13 35C0089 28.0 (12.7)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-14 L-831-14

35A0224 35A0224-1

18.0 (8.2)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

L-830-15 35A0228 18.0 (8.4)

12 x 10 x 10 (30.5 x 25.4 x 25.4)

Note: Actual shipping weight may vary by specifi c manufacturer’s transformer. Some orders are bulk shipped in a single container.

Stake Mount Application

Canadian Ordering Code Certifi -cation

Rated Watts

Hz Prim.

Amps

Sec.

Amps

Part No.

CSA 10/15 60 6.6 6.6 CTAG010666-011

CSA 25 60 6.6 6.6 CTAG025666-011

CSA 30/45 60 6.6 6.6 CTAG045666-01

45 60 6.6 6.6 STAG045666-011,2

CSA 65 60 6.6 6.6 CTAG065666-01

CSA 100 60 6.6 6.6 CTAG100666-01

100 60 6.6 6.6 STAG100666-011,2

CSA 150 60 6.6 6.6 CTAG150666-01

CSA 200 60 6.6 6.6 CTAG200666-01

CSA 250 60 6.6 20 CTAG250626-01

CSA 300 60 6.6 6.6 CTAG300666-011

500 60 6.6 6.6 TAG500666-01CS0581

Notes 1 With CSA type ground 2 Saturation-type isolating transformers

Deep Base Application

3. AGSF-L GUIDANCE SIGNS.

Compliance with Standards

FAA: L-858Y(L), L-858R(L), L-858L(L) and L-858B(L) AC 150/5345-44 (Current Edition) and the FAA Engineering Brief No. 67. ETL Certified.

Uses

FAA L-858Y(L)

Direction, Destination, and Boundary (Informational Sign)

FAA L-858R(L)

Mandatory Sign

FAA L-858L(L)

Runway/Taxiway Location Sign: These signs are designed to guide pilots to a particular point on the field, identify holding positions, identify taxiway and runway intersections, and prohibit aircraft entry into designated areas.

FAA L-858B(L)

Runway Distance Remaining Sign: The L-858B is used at 1,000-foot intervals adjacent to the runway edge in order to provide runway distance remaining information to pilots during takeoff and landing operations.

Construction Corrosion-resistant sign construction requires minimal maintenance.

• Aluminum housing

• Acrylic sign legend panels

• Stainless steel hardware

• Retroreflective sheeting

• Translucent plastic panel dividers used between multi-module legend panels

Operating Conditions Temperature -40 °F to +131 °F (-40 °C to +55 °C) Humidity 0 to 100% Wind • ADB Safegate Mode 2 signs withstand wind velocities up to 225 mph

• ADB Safegate Mode 3 signs withstand wind velocities up to 327 mph

Features

• Unique LED Light Bar design maximizes energy efficiency

• Available Battery Tester provides for quick and easy testing of individual LED Light Bars

• Electrical design uses a minimal number of components which maximizes sign MTBF and greatly simplifies troubleshooting efforts.

• Virtually eliminates runway and taxiway shutdowns due to long-lasting LED light source

• Direct replacement for existing sign

• Creates a highly uniform distribution of light, eliminating hot spots and shadows

• Operates on ferroresonant or thyristor CCRs that are designed in compliance with FAA or IEC requirements

• Operates on all steps of a 3-step or 5-step CCR and on a 5.5 A CCR.

• Eliminates re-lamping expenses and reduces on-going maintenance costs

• Improved safety — low, regulated DC voltage inside sign

• Rugged lightning protection that complies with ANSI/IEEE

C62.41-1991 Location Category C2 given in FAA Eng. Brief 67.

Category C2 is defined as a 1.2/50μS – 8/20 μS combination wave, with a peak voltage of 10,000 Volts and a peak current of 5,000 A.

Sign Legends

Type Purpose Legend Color Background Color

L-858Y Direction, Destination & Boundary

Black Yellow

L-858R Mandatory Sign White with Black Outline

Red

L-858L Runway/Taxiway Location

Yellow Black

L-858B Runway Distance Remaining

White Black

Electrical Supply Signs are internally lighted and are connected to a series circuit using the appropriately-sized 50 or 60 Hz L-830/L-831 isolation transformer.

GUIDANCE SIGNS

AGSF-L

FAA LED Light Bar Airfield Guidance Sign

3006 Rev. Q 1

Packaging Data Signs are shipped with L-823 cord set(s), frangible couplings, and floor flanges –ready for installation.

Description Gross Weight1

Carton Dimensions

(lb) (kg) (in) (cm)

Size 1, Module 1 46 21 34 × 34 × 13 87 × 86.4 × 33

Size 1, Module 2 78 35 34 × 63 × 13 87 × 160 × 33

Size 1, Module 3 115 52 34 × 92 × 13 87 × 234 × 33

Size 1, Module 4 169 77 34 × 121 × 13 87 × 307 × 33

Size 2, Module 1 71 32 40 × 40 × 13 102 × 102 × 33

Size 2, Module 2 104 47 40 × 76 × 13 102 × 193 × 33

Size 2, Module 3 153 70 40 × 112 × 13 102 × 285 × 33

Size 2, Module 4 2202 1002 40 × 147 × 13 102 × 374 × 33

Size 3, Module 1 81 37 46 × 46 × 13 117 × 117 × 33

Size 3, Module 2 131 60 46 × 89 × 13 117 × 226 × 33

Size 3, Module 3 199 90 46 × 131 × 13 117 × 333 × 33

Size 3, Module 4 252 114 46 × 173 × 13 117 × 440 × 33

Size 4, Module 1 122 56 62 × 52 × 13 158 × 132 × 33

Size 5, Module 1 81 37 46 × 46 × 13 117 × 117 × 33

Note:

1 Estimated weight 2 Weights listed are for halogen signs. Contact ADB Safegate for high wind speed sign weights.

Sign Load & Transformer Requirements In the table to the right, the number for the total VA load imposed on the CCR represents the actual load imposed on the regulator and accounts for power factor and load imposed by the transformer.

Sign Size No. of Modules

Transformer Power Factor

Volt Amp VA Load

Style 2, 3-Step LED Signs (4.8 - 6.6 A)

65 W 100 W 100 W 100 W

0.83 0.83 0.88 0.91

65 W 100 W 100 W 100 W

0.88 0.88 0.91 0.91

100 W 100 W 100 W 150 W

0.83 0.91 0.91 0.88

4 1 100 W 0.84 95

5 1 100 W 0.83 95

Style 3, 5-Step LED Signs (2.8 - 6.6 A)

100 W 150 W 150 W 150 W

0.88 0.88 0.88 0.90

150 W 150 W 150 W 150 W

0.88 0.90 0.83 0.85

150 W 150 W 150 W 200 W

0.88 0.90 0.83 0.85

4 1 150 W 0.88 95

5 1 150 W 0.83 95

Style 5, Single-Step LED Signs (5.5 A)

65 W 65 W 100 W 100 W

0.84 0.84 0.88 0.88

65 W 100 W 100 W 100 W

0.92 0.89 0.90 0.90

65 W 100 W 100 W 100 W

0.84 0.88 0.92 0.92

4 1 65 W 0.83 85

5 1 65 W 0.92 85

GUIDANCE SIGNS

AGSF-L

3006 Rev. Q 2

L-858 Sign LED Retrofit Kits for ADB Safegate Signs

Application

A retrofit kit is available to convert any existing ADB Safegate tungsten-halogen or fluorescent sign to an LED light source. The same retrofit kit can be used to convert signs using LED light tubes (Part No. 48A0408 and 48A0409) to the new LED light bar design. The kit is available for all FAA Types: L-858Y, L-858R, L-858L and L-858B;

all Sizes: Size 1 through 5; and all module lengths: up to 4 modules.

Retrofitting a sign is fast and easy. It typically takes 20 minutes to retrofit a 2-module sign. The retrofit process converts the sign to the same type as an existing ADB Safegate ETL-Certified sign.

Reduced Maintenance costs

An LED sign virtually eliminates runway and taxiway shutdowns due to the long life LED light source. It eliminates re-lamping expenses and reduces on-going maintenance costs. The LED optical design also creates a highly uniform distribution of light, eliminating hot spots and shadows. Also, the sign provides for improved safety because there is only a low, regulated DC voltage inside sign.

Energy savings

An LED sign provides greatly reduced energy consumption compared to existing types of signs. See chart below for more information.

The LED sign operates on ferroresonant or thyristor CCRs that are designed in compliance with FAA requirements. The sign electronics are designed to operate on 3-step, 5-step and 5.5 A dedicated series circuits.

See chart on previous page for sign loading and optimum sign transformer size. Note that the existing larger size transformer, if present, can be reused. Ask for Service Bulletin ALN158 for details on how to retrofit the sign.

LED Sign Retrofit Kit Size 1 = Size 1 2 = Size 2 3 = Size 3 4 = Size 4 5 = Size 5

Number of Modules 1 = 1 module 2 = 2 modules 3 = 3 modules 4 = 4 modules

94A0628 - X X 0

LED and Halogen Sign Comparison Table

Sign Size Style No. of Modules Isolation Transformer Size Required

LED

Max. CCR VA Load

Tungsten Halogen Max CCR VA Load1

Energy Savings

2, 3 Style 2 (3-step) 3 500 W for T-H 100 W for LED

100 340 71%

1 Style 3 (5-step) 4 500 W for T-H 150 W for LED

100 233 57%

Notes 1 CCR Load includes both sign and isolation transformer load.

GUIDANCE SIGNS

3006 Rev. Q 3

Dimensions

Sign Heights

Type Sign Size No. Sign Face Height in (cm)

Legend Height in (cm)

Sign Style No. Sign Class No. Overall Mounting Height in (cm)

L-858Y/R/L 1 18 12 2,3,5 1,2 29.7

1 (45.7) (30.5) 2,3,5 1,2 (75.5)

L-858Y/R/L 2 24 15 2,3,5 1,2 35.7

2 (61) (38.1) 2,3,5 1,2 (90.8)

L-858Y/R/L 3 30 18 2,3,5 1,2 41.7

3 (76.2) (45.7) 2,3,5 1,2 (106)

L-858B 4 48 40 2,3,5 1,2 58.2

4 (122) (101.6) 2,3,5 1,2 (147.8)

L-858B 5 30 25 2,3,5 1,2 41.7

5 (76.2) (63.5) 2,3,5 1,2 (106)

Sign Lengths - Inches (Centimeters)

Size No. 1 Module 2 Module 3 Module 4 Module

1 29.4 (75) 58.6 (149) 87.9 (223) 117.2 (298)

2 35.9 (91) 71.6 (182) 107.4 (273) 143.2 (364)

3 42.4 (108) 84.6 (215) 126.9 (323) 169.2 (430)

4 47.9 (122) N/A N/A N/A

5 42.4 (108) N/A N/A N/A

Note:

• Sign depth is 9.39 in (23.85 cm).

• See our website for additional dimension and installation information.

GUIDANCE SIGNS

3006 Rev. Q 4

Ordering Code Lamp Type

R = LED

S = LED High Wind1 Sign Size 1 = Size 1 2 = Size 2 3 = Size 3 4 = Size 4 5 = Size 5 Module 1 = 1 Module 2 = 2 Module 3 = 3 Module 4 = 4 Module Style 7 = LED Style 2, Style 3, and Style 5

A = APS

Face 1 = Single 2 = Double Total Number of Panels X = To be determined by the ADB Safegate Sales Department based on legend and module configurations.

Backup Lamps 3 = without backup LEDs Power 1 = Power through leg without ON/OFF switch 2 = Power through leg with ON/OFF switch 3 = Power through side without ON/OFF switch3 4 = Power through side with ON/OFF switch3 5 = Customer-provided entry without ON/OFF switch 2,3 6 = Customer-provided entry with ON/OFF switch 2,3 9 = Power through bottom without ON/OFF switch3 A = Power through bottom with ON/OFF switch3 Tether 0 = No tether3 1 = One tether on one end of sign 2 = Two tethers, one on each end 3 = One tether per leg Lamps Out Indicator (Halogen Only) 0 = Without Notes

• Customer to provide legend information and power connection side. It is important to match power cord exit location with legend side.

1 Use high wind signs in those locations where actual wind speed exceeds

FAA specifications (Mode 3). High wind signs tested to a minimum wind load of 327 mph as recommended by FAA tec hnical paper DOT/FAA/AR - TN00/32: Evaluation of Wind-Loading on Airport Signs. High wind signs require four anchor bolts per floor flange except Size 1, which uses the standard 2-bolt foot.

2 Cord set coiled up inside side. Customer provides entry hole.

3 Not ETL Certified.

S X X X - X X X 3 X X 0 LED Light Engine Tester Battery-powered tester is used during maintenance activities to separately test a single LED light bar. Uses four size D batteries and outputs 350 mA. Output is activated using a momentary switch.

Note: Tester can also be used on all ADB Safegate SB-type LED signs.

44A7264-1

Legend Panel Replacement Size 1 = Size 1 2 = Size 2 3 = Size 3 and 5 4 = Size 4 Number of Modules 1 = 1 module 2 = 2 modules Panel Type 1 = With legend (retroreflective) 2 = Black Sign Type 0 = Standard 1 = Hi-Wind

44A6084 - X X X X

Legend Panel Divider Size 1 = Size 1 2 = Size 2 3 = Size 3 and 5

Paint Coverage A = Solid (black only)1 C = Clear (paint top only) Paint Color R = Red Y = Yellow B = Black1

Note:

1 For option A (solid), customer must se lect option B (black). Option C

(clear) can be paired with either red or yellow.

44A6173 - X X X

GUIDANCE SIGNS

AGSF-L

www.adbsafegate.com

Product specifications may be subject to change, and specifications listed here are not binding. Confirm current specifications at time of order.

3006 Rev. Q 5 http://www.adbsafegate.com

File details come from the government source that posted it.