Attachment 5. AF 3052 Cost Estimate Breakdown

View the file

Other files for this federal contract opportunity

Other files attached to RPL A/C Unit, Bldg 107, newest first.
File Type Posted
Attachment_4._13-1016_Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
Attachment_1._13-1016_Specs_English.pdf PDF
FA5575-16-B-0001_RPL_AC_bldg_107.pdf PDF
Attachment_3._13-1016.pdf PDF
Attachment_2._13-1016_Especificaciones_espanol.pdf PDF
Attachment_6._-_PPI_reference_list.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KTR (SUS)

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPL A/C UNIT, 107 (EXCHANGE) - SUSTAINMENT
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 13-1016 (SUSTAINMENT)MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
MECHANICAL WORK
OBRA MECÁNICA
1Removal of existing HVAC system and accessories
Desmontaje de sistema existente HVAC y accesoriosEa
2Ductless split heat pump system and accessories
Sistema sconsolas plit bomba de calor y accesoriosEa
3Reinforced concrete slab
Bancada de hormigón armadom3
4Ducted split heat pump equipment and accessories
Equipo partido bomba de calor para conductos y accesoriosEa
5Support structure and accessories for ducted interior unit
Estructura de soporte y accesorios para unidad interior de conductosEa
6Rectangular galvanized steel supply duct (insulated)
Conducto de chapa rectangular de impulsión (aislado)m2
7Rectangular galvanized steel return duct (insulated)
Conducto de chapa rectangular de retorno (aislado)m2
8Roof slab opening for diffusers and grilles
Apertura de huecos en forjado para difusores y rejillasEa
9Linear supply diffusers SD-1
Difusores de impulsión lineales SD-1Ea
10Return grilles RR-1
Rejillas de retorno RR-1Ea
11Manual regulation dampers
Compuertas de regulación manualesEa
12Volume motorized control damper for fresh air and accessories
Compuerta motorizada de aire exterior y accesoriosEa
13Fresh air intake grille and accessories
Rejilla de toma de aire exterior y accesoriosEa
14Tests, setup and regulation
Pruebas, puesta en marcha y regulaciónJOB
15Galvanized steel pipe 3/4" and connection accessories
Tubería acero galvanizado 3/4" y accesorios de conexiónLm
16Ball valve 3/4"
Válvula de bola 3/4"Ea
17Hose bibb and hose connection vacuum breaker 3/4"
Grifo y rompedor de vacío para conexión de manguera 3/4"Ea
18Repair roof access platform handrail
Reparar barandilla de plataforma de acceso acubiertaEa
19Repair elements affected by the project execution
Reparar elementos afectados por la ejecución del proyectoJOB
TOTAL MECHANICAL WORK
TOTAL OBRA MECÁNICA
FIRE ALARM WORK
OBRA DE ALARMA CONTRAINCENDIOS
20Demolition of existing fire alarm panel installation
Demolición de la instalación alarma contraincendios existenteJOB
21New Addressable Fire Alarm Control Panel
Nuevo Panel de Alarma DireccionableEa
22Duct Smoke Detectors, conduit, cabling & acc.
Detectores de humo de conducto, conducto, cableado y acc.Ea
23Heat Detectors, bases, conduit, cabling & acc.
Detectores de calor, bases, conducto, cableado y acc.Ea
24Addressable interfacedevice conduit, wiring & acc.
Módulo monitorización direcc., cond., cableado y acc.Ea
TOTAL FIRE ALARM WORK
TOTAL OBRA ALARMA CONTRAICENDIOS
SUMMARY (SUSTAINMENT COST)
RESUMEN (SUSTAINMENT COST)
TOTAL MECHANICAL WORK
TOTAL OBRA MECÁNICA
TOTAL FIRE ALARM WORK
TOTAL OBRA ALARMA CONTRAICENDIOS
TOTAL (SUSTAINMENT COST)
TOTAL (SUSTAINMENT COST)
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD %

SUBTOTAL

PROFIT %

TOTAL SUSTAINMENT COST EUROS

DATE: FIRM NAME:

TITLE: BY:

TITLE: BY:

TITLE: CHECKED BY:

&"Times New Roman,Regular"AF Form 3052 (Computer Generated) &"Times New Roman,Regular"Page &P of &N

KTR (REST&MOD)

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPL A/C UNIT, 107 (EXCHANGE) - RESTORATION & MODERNIZATION
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 13-1016 (REST & MODERN)MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
ELECTRICAL WORK
OBRA ELÉCTRICA
1Demolition of existing electrical installation
Demolición de la instalación eléctrica existenteJOB
2New 6A, Phase + Neutral, Curve C 10kA Circuit Breaker
Nuevos magnetotérmico 6A, Fase + Neutro, Curva C 10 kAEa
3New 10A, Phase + Neutral, Curve C 10kA Circuit Breaker
Nuevos magnetotérmico 10A, Fase + Neutro, Curva C 10 kAEa
4New 16A, 2- Phase, Curve C 10kA Circuit Breaker
Nuevo magnetotérmico 16A, 2 Fases, Curva C 10 kAEa
5New MDP Panel
Nuevo Panel MDPEa
66" RMC including couplings & accessories
Conducto rígido acero galv. 6", incluso manguitos y accesoriosLm
73 1/2" RMC including couplings & accessories
Conducto acero galv. 3 1/2", incluso manguitos y accesoriosLm
82 1/2" RMC including couplings & accessories
Conducto acero galv. 2 1/2", incluso manguitos y accesoriosLm
91 1/2" RMC including couplings & accessories
Conducto acero galv. 1 1/2", incluso manguitos y accesoriosLm
103/4" RMC including couplings & accessories
Conducto rígido acero galv. 3/4", incluso manguitos y accesoriosLm
112" EMT including couplings & accessories
Conducto acero galv. 2", incluso manguitos y accesoriosLm
121" EMT including couplings & accessories
Conducto acero galv. 1", incluso manguitos y accesoriosLm
133/4" EMT including couplings & accessories
Conducto acero galv. 3/4", incluso manguitos y accesoriosLm
14PG21 Flexible Metal Conduit including couplings & accesories
Cond. Flexible Metálico PG21 incluso prensaestopas y acc.Lm
15Copper cable 1x2.5 mm2 H07V-K 450/750V
Cable de cobre 1x2.5 mm2 H07V-K 450/750VLm
16Copper cable 1x2.5 mm2 RZ1-K(AS) 1000V
Cable de cobre 1x2.5 mm2 RZ1-K(AS) 1000VLm
17Copper cable 1x4 mm2 H07V-K 450/750V
Cable de cobre 1x4 mm2 H07V-K 450/750VLm
18Copper cable 1x6 mm2 H07V-K 450/750V
Cable de cobre 1x6 mm2 H07V-K 450/750VLm
19Copper cable 1x16 mm2 RZ1-K(AS) 1000V
Cable de cobre 1x16 mm2 RZ1 K(AS) 1000VLm
20Copper cable 1x70 mm2 RZ1-K(AS) 1000V
Cable de cobre 1x70 mm2 RZ1 K(AS) 1000VLm
21Copper cable 1x95 mm2 RZ1-K(AS) 1000V
Cable de cobre 1x95 mm2 RZ1 K(AS) 1000VLm
22Copper cable 1x185 mm2 RZ1-K(AS) 1000V
Cable de cobre 1x185 mm2 RZ1 K(AS) 1000VLm
23Copper cable 1x300 mm2 RZ1-K(AS) 1000V
Cable de cobre 1x300 mm2 RZ1 K(AS) 1000VLm
24Pull Boxes
Cajas de PasEa
25Re-location of EXIT light
Re-colocación de luz de salida de emergenciaEa
26Lighting fixtures (Type A) 2xTL5 35W HFP
Luminaria estanca (Tipo A)Ea
27Emergency lighting fixtures (Type A) 2xTL5 35W HFP
Luminaria estanca de emergencia (Tipo A)Ea
28Receptacles NEMA 6-20R
Enchufes tipo NEMA 6-20REa
29Emergency HVAC Shutoff Pushbutton
Paro de Emergencia de ClimatizaciónEa
30Safety Switches
Seccionadores FusiblesEa
31Repair elements affected by the project execution
Reparar elementos afectados por la ejecución del proyectoJOB
32Underground service line to MDP Panelboard
Acometida eléctrica a panel MDPLm
33New electrical manholes
Nuevas arquetas eléctricasEa
34New Grounding Hanholes
Nuevas arquetas de PATEa
35Stranded bare copper cable, 50mm2, incl. exothermic weld
Cable trenzado desnudo de cobre, 50mm2, incl. sold. exotérmicaLm
36Stranded bare copper cable, 35mm2, incl. exothermic weld
Cable trenzado desnudo de cobre, 35mm2, incl. sold. ExotérmicaLm
37Copper-clad grounding rods Ø19x3000mm and handhole
Picas de tierra acero cobreado Ø19x3000mm y registroEa
TOTAL ELECTRICAL WORK
TOTAL OBRA ELÉCTRICA
PAINT WORK
OBRA DE PINTURA
38Desmontaje y reinstalación cables, acces y equipos
Removal & reinstall cables, accessor. & equipmentsSM
39Eliminación de capas de pintura
Paint removalSM
40Limpiar con fungicida superficies cubiertas de hongos
Clean with fungicide midew-covered surfacesSM
41Paint mechanical room interior walls and ceiling
Pintar paredes y techo interiores cuarto técnicoSM
42Paint mechanical room double doors
Pintar puerta doble interiores cuarto técnicoSM
TOTAL PAINT WORK
TOTAL OBRA PINTURA
SUMMARY (RESTORATION & MODERNIZATION)
RESUMEN (RESTORATION & MODERNIZATION)
TOTAL ELECTRICAL WORK
TOTAL OBRA ELÉCTRICA
TOTAL PAINT WORK
TOAL OBRA PINTURA
TOTAL (RESTORATION & MODERNIZATION)
TOTAL (RESTORATION & MODERNIZATION)
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD %

SUBTOTAL

PROFIT %

TOTAL REST & MODERNIZATION EUROS

DATE: FIRM NAME:

TITLE: BY:

TITLE: BY:

TITLE: CHECKED BY:

&"Times New Roman,Regular"AF Form 3052 (Computer Generated) &"Times New Roman,Regular"Page &P of &N

KTR (SUMMARY)

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPL A/C UNIT, 107 (EXCHANGE) - SUMMARY
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 13-1016 (SUMMARY)MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
SUMMARY
RESUMEN
TOTAL SUSTAINMENT
TOTAL SUSTAINMENT
TOTAL RESTORATION & MODERNIZATION
TOTAL RESTORATION & MODERNIZATION
TOTAL (SUMMARY)
TOTAL (RESUMEN)
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD %

SUBTOTAL

PROFIT %

TOTAL SUMMARY EUROS

DATE: FIRM NAME:

TITLE: BY:

TITLE: BY:

TITLE: CHECKED BY:

&"Times New Roman,Regular"AF Form 3052 (Computer Generated) &"Times New Roman,Regular"Page &P of &N