Attachment 4. Schedule of Material Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_2._13-1016_Especificaciones_espanol.pdf | ||
| Attachment_1._13-1016_Specs_English.pdf | ||
| FA5575-16-B-0001_RPL_AC_bldg_107.pdf | ||
| Attachment_3._13-1016.pdf | ||
| Attachment_5._13-1016_AF_3052_KTR.xlsx | XLSX spreadsheet | |
| Attachment_6._-_PPI_reference_list.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||
| QUUG 13-1016 | PROJECT TITLE | |||
| REPLACE A/C UNIT, 107 (EXCHANGE) | SOLICITATION / CONTRACT NO. |
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DISAPPROVED | ||||||||||||||||||||||
| SECTION 01 11 00 | |||||||||||||||||||||||
| 1 | Construction Schedule | NTP+10 | |||||||||||||||||||||
| 2 | Work Plan | NTP+10 | |||||||||||||||||||||
| SECTION 01 11 01 | |||||||||||||||||||||||
| 3 | Progress Schedule | 4 | NTP+10 | ||||||||||||||||||||
| 4 | Mobility Plan | 4 | NTP+15 | ||||||||||||||||||||
| 5 | Project Sign | 4 | NTP+15 | ||||||||||||||||||||
| 6 | Quality Control Plan | 4 | NTP+15 | ||||||||||||||||||||
| 7 | Environmental Protection Plan | 4 | NTP+15 | ||||||||||||||||||||
| 8 | As-Built drawings | 4 | FI+15 | ||||||||||||||||||||
| 9 | Spatial Data | 4 | FI+15 | ||||||||||||||||||||
| 10 | Key Personnel | 4 | NTP+15 | ||||||||||||||||||||
| 11 | Personel listing | 4 | NTP+15 | ||||||||||||||||||||
| 12 | Health and Safety Program | 4 | NTP+15 | ||||||||||||||||||||
| 13 | Warranty letter | 4 | FI+15 | ||||||||||||||||||||
| SECTION 02 41 10 | |||||||||||||||||||||||
| 14 | Manager of waste from demolition and construction | 4 | |||||||||||||||||||||
| 15 | Manager of Hazardous waste | 4 | |||||||||||||||||||||
| 16 | Authorized dump or treatment and recovery plant | 4 | |||||||||||||||||||||
| 17 | Delivery and disposal/destruction certicate of waste | 4 | |||||||||||||||||||||
| SECTION 09 90 00 | |||||||||||||||||||||||
| 18 | Prime Coat | 4 | |||||||||||||||||||||
| 19 | Intermediate and final coat | 4 | |||||||||||||||||||||
| 20 | Preliminary cleaning and disinfection treatment | 4 | |||||||||||||||||||||
| SECTION 22 00 00 | |||||||||||||||||||||||
| 21 | Galvanized steel pipe DIN 2440 | 4 | |||||||||||||||||||||
| 22 | Hose bibb and hose connection vacuum breaker | 4 | |||||||||||||||||||||
| 23 | Ball valve | 4 | |||||||||||||||||||||
| SECTION 23 00 00 | |||||||||||||||||||||||
| 24 | O&M Manuals | 4 | FI+15 | ||||||||||||||||||||
| SECTION 23 07 00 | |||||||||||||||||||||||
| 25 | Refrigerant piping insulation | 4 | |||||||||||||||||||||
| 26 | Duct insulation | 4 | |||||||||||||||||||||
| SECTION 23 30 13 | |||||||||||||||||||||||
| 27 | Sheet metal rectangulat ducts (METU) | 4 | |||||||||||||||||||||
| 28 | Circular flexible ductwork | 4 | |||||||||||||||||||||
| 29 | Linear supply diffusers | 4 | |||||||||||||||||||||
| 30 | Return grilles | 4 | |||||||||||||||||||||
| 31 | Manual regulation dampers | 4 | |||||||||||||||||||||
| 32 | Fresh air intakes | 4 | |||||||||||||||||||||
| 33 | Volume control damper for fresh air intake | 4 | |||||||||||||||||||||
| 34 | Rotational diffuser airfoil profile louver | 4 | |||||||||||||||||||||
| 35 | Supply diffusers and return grilles | 4 | |||||||||||||||||||||
| 36 | Testing and balancing of air conditioning systems | 4 | Installation completion | ||||||||||||||||||||
| SECTION 23 35 19 | |||||||||||||||||||||||
| 37 | Split heat pump equipment for ducts | 4 | |||||||||||||||||||||
| 38 | Ductless split heat pump | 4 | |||||||||||||||||||||
| 39 | Test reports | 4 | Installation completion | ||||||||||||||||||||
| SECTION 26 20 00 | |||||||||||||||||||||||
| 40 | Conduits and fittings (1 of each type) | 4 | |||||||||||||||||||||
| 41 | Outlet boxes and covers | 4 | |||||||||||||||||||||
| 42 | Junction and pull boxes | 4 | |||||||||||||||||||||
| 43 | Wires and cables | 4 | |||||||||||||||||||||
| 44 | Emergency HVAC shutoff pushbuttons | 4 | |||||||||||||||||||||
| 45 | Circuit breakers and auxiliary trip coils | 4 | |||||||||||||||||||||
| 46 | Panelboards | 4 | 4 | ||||||||||||||||||||
| 47 | Surge Protective Devices | 4 | |||||||||||||||||||||
| 48 | Damper actuators and transformers | 4 | |||||||||||||||||||||
| 49 | Safety Switches | 4 | |||||||||||||||||||||
| 50 | Labels | 4 | |||||||||||||||||||||
| 51 | Network Analyzer | 4 | |||||||||||||||||||||
| 52 | Intersystem Bonding Termination | 4 | |||||||||||||||||||||
| 53 | Receptacles | 4 | |||||||||||||||||||||
| 54 | Device Plates | 4 | |||||||||||||||||||||
| 55 | One line diagram | 4 | |||||||||||||||||||||
| 56 | Devices Subject to Manual Operation | 4 | Installation completion | ||||||||||||||||||||
| 57 | 0.6/1 kV insulation test | 4 | Installation completion | ||||||||||||||||||||
| 58 | Grounding System Test | 4 | Installation completion | ||||||||||||||||||||
| 59 | Single line diagram of the “as-built” building electrical system | 4 | FI-15 | ||||||||||||||||||||
| 60 | Schematic diagram of electrical control system | 4 | FI-15 | ||||||||||||||||||||
| 61 | Active electrical equipment | 4 | FI-15 | ||||||||||||||||||||
| SECTION 26 51 00 | |||||||||||||||||||||||
| 62 | Fluorescent lighting fixtures | 4 | |||||||||||||||||||||
| 63 | Fluorescent lamps | 4 | |||||||||||||||||||||
| 64 | Fluorescent electronic ballasts | 4 | |||||||||||||||||||||
| 65 | Fixture mounting hardware | 4 | |||||||||||||||||||||
| 66 | Field Test Reports | 4 | Installation completion | ||||||||||||||||||||
| SECTION 28 31 63.00 20 | |||||||||||||||||||||||
| 67 | Point-to-poiny wiring diagrams | 4 | |||||||||||||||||||||
| 68 | Plan view drawings | 4 | |||||||||||||||||||||
| 69 | Battery Power Calculations | 4 | |||||||||||||||||||||
| 70 | Safety switch | 4 | |||||||||||||||||||||
| 71 | Fire Alarm Control Panel (FACP) | 4 | |||||||||||||||||||||
| 72 | Batteries | 4 | |||||||||||||||||||||
| 73 | Battery Charger | 4 | |||||||||||||||||||||
| 74 | Thermal sensors | 4 | |||||||||||||||||||||
| 75 | Wiring and cable | 4 | |||||||||||||||||||||
| 76 | Addressable interface devices | 4 | |||||||||||||||||||||
| 77 | Smoke sensor testing procedures | 4 | |||||||||||||||||||||
| 78 | Tests | 4 | Installation completion | ||||||||||||||||||||
| 79 | Qualification of installer | 4 | |||||||||||||||||||||
| 80 | O&M Manuals: Interior Fire Alarm System | 4 | FI-15 | ||||||||||||||||||||
| 81 | Record drawing software | 4 | FI-15 | ||||||||||||||||||||
| 82 | System As-Built drawings | 4 | FI-15 | ||||||||||||||||||||
| SECTION 33 71 02.00 20 | |||||||||||||||||||||||
| 83 | Conduits (both types) | 4 | |||||||||||||||||||||
| 84 | Underground Low Voltage Cables | 4 | |||||||||||||||||||||
| 85 | Buried Warning and Identification Tape | 4 | |||||||||||||||||||||
| 86 | Ground wires | 4 | |||||||||||||||||||||
| 87 | Handholes | 4 | |||||||||||||||||||||
| 88 | Handhole covers | 4 | |||||||||||||||||||||
| 89 | Ground rods | 4 | |||||||||||||||||||||
| 90 | Grounding Test/Bar Wells | 4 | |||||||||||||||||||||
| 91 | Grounding Bars | 4 | |||||||||||||||||||||
| 92 | Exothermic welding | 4 | |||||||||||||||||||||
| 93 | Test Reports | 4 | Installation completion | ||||||||||||||||||||
| 94 | System record drawing | 4 | FI-15 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| 13-1015 | TÍTULO DE PROYECTO: | |||
| REEMPLAZAR SISTEMA DE AIRE ACONDICIONADO 107 | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA | FECHA RECEPCIÓN EN CONTRATACIÓN | FECHA EN INGENIERíA CIVIL | FECHA LÍMITE DE DEVOLUCIÓN | NÚMERO DE MUESTRA | FECHA NOTIFICACIÓN A CONTRATISTA | SEGUNDA PRESENTACIÓN DEL CONTRATISTA | APROBACIÓN FINAL | OBSERVACIONES | |
| APROBADO | DESAPROBADO | ||||||||||||||||||||||
| SECCIÓN 01 11 00 | |||||||||||||||||||||||
| 1 | Plan de construcción | NTP+10 | |||||||||||||||||||||
| 2 | Plan de obra | NTP+10 | |||||||||||||||||||||
| SECCIÓN 01 11 01 | |||||||||||||||||||||||
| 3 | Programa de avance de obras | 4 | NTP+10 | ||||||||||||||||||||
| 4 | Plan de movilización | 4 | NTP+15 | ||||||||||||||||||||
| 5 | Cartel informativo de proyecto | 4 | NTP+15 | ||||||||||||||||||||
| 6 | Plan de control de calidad | 4 | NTP+15 | ||||||||||||||||||||
| 7 | Plan de protección medioambiental | 4 | NTP+15 | ||||||||||||||||||||
| 8 | Planos As-Builts | 4 | IF+15 | ||||||||||||||||||||
| 9 | Datos espaciales | 4 | IF+15 | ||||||||||||||||||||
| 10 | Personal clave | 4 | NTP+15 | ||||||||||||||||||||
| 11 | Listado de personal | 4 | NTP+15 | ||||||||||||||||||||
| 12 | Plan de salud y seguridad | 4 | NTP+15 | ||||||||||||||||||||
| 13 | Carta de garantía | 4 | IF+15 | ||||||||||||||||||||
| SECCIÓN 02 41 10 | |||||||||||||||||||||||
| 14 | Gestor de residuos | 4 | |||||||||||||||||||||
| 15 | Gestor de residuos peligrosos | 4 | |||||||||||||||||||||
| 16 | Vertedero autorizado o planta de tratamiento y valorización de residuos | 4 | |||||||||||||||||||||
| 17 | Depósito/destrucción de residuos | 4 | |||||||||||||||||||||
| SECCIÓN 09 90 00 | |||||||||||||||||||||||
| 18 | Imprimación | 4 | |||||||||||||||||||||
| 19 | Capa intermedia y final | 4 | |||||||||||||||||||||
| 20 | Tratamientos previos de limpieza y desinfección | 4 | |||||||||||||||||||||
| SECCIÓN 22 00 00 | |||||||||||||||||||||||
| 21 | Tubería de acero galvanizado DIN 2440 | 4 | |||||||||||||||||||||
| 22 | Grifo para manguera y rompedor de vacío | 4 | |||||||||||||||||||||
| 23 | Válvulas de bola | 4 | |||||||||||||||||||||
| SECCIÓN 23 00 00 | |||||||||||||||||||||||
| 24 | Manuales de mantenimiento | 4 | IF+15 | ||||||||||||||||||||
| SECCIÓN 23 07 00 | |||||||||||||||||||||||
| 25 | Aislamiento de tubería de refrigerante | 4 | |||||||||||||||||||||
| 26 | Aislamiento de conductos | 4 | |||||||||||||||||||||
| SECCIÓN 23 30 13 | |||||||||||||||||||||||
| 27 | Conductos rectangulares de chapa metálica (METU) | 4 | |||||||||||||||||||||
| 28 | Conductos circulares flexibles | 4 | |||||||||||||||||||||
| 29 | Difusores de impulsión lineales | 4 | |||||||||||||||||||||
| 30 | Rejillas de retorno | 4 | |||||||||||||||||||||
| 31 | Compuertas de regulación manual | 4 | |||||||||||||||||||||
| 32 | Rejillas de toma de aire exterior | 4 | |||||||||||||||||||||
| 33 | Compuertas de regulación para toma de aire exterior | 4 | |||||||||||||||||||||
| 34 | Lama con perfil aerodinámico de difusor de impulsión | 4 | |||||||||||||||||||||
| 35 | Difusores de impulsión y rejillas de retorno | 4 | |||||||||||||||||||||
| 36 | Pruebas y equilibrado del sistema completo de A/A | 4 | Al término instalación | ||||||||||||||||||||
| SECCIÓN 23 35 19 | |||||||||||||||||||||||
| 37 | Bomba de calor partida para conductos | 4 | |||||||||||||||||||||
| 38 | Consola bomba de calor partida | 4 | |||||||||||||||||||||
| 39 | Informes de Pruebas | 4 | Al término instalación | ||||||||||||||||||||
| SECCIÓN 26 20 00 | |||||||||||||||||||||||
| 40 | Tubos y accesorios (1 x cada tipo) | 4 | |||||||||||||||||||||
| 41 | Cajas para mecanismos y tapas | 4 | |||||||||||||||||||||
| 42 | Cajas de conexión y paso | 4 | |||||||||||||||||||||
| 43 | Conductores y cables | 4 | |||||||||||||||||||||
| 44 | Pulsadores de paro de emergencia de climatización | 4 | |||||||||||||||||||||
| 45 | Interruptores magnetotérmicos y bobinas de disparo | 4 | |||||||||||||||||||||
| 46 | Cuadros eléctricos | 4 | 4 | ||||||||||||||||||||
| 47 | Descargador de Sobretensiones | 4 | |||||||||||||||||||||
| 48 | Servomotores de compuertas y transformadores | 4 | |||||||||||||||||||||
| 49 | Desconectadores fusibles | 4 | |||||||||||||||||||||
| 50 | Etiquetas | 4 | |||||||||||||||||||||
| 51 | Analizador de redes | 4 | |||||||||||||||||||||
| 52 | Embarrado común de tierra | 4 | |||||||||||||||||||||
| 53 | Bases de enchufe | 4 | |||||||||||||||||||||
| 54 | Placas de mecanismos | 4 | |||||||||||||||||||||
| 55 | Esquema unifilar | 4 | |||||||||||||||||||||
| 56 | Dispositivos sujetos a operación manual | 4 | Al término instalación | ||||||||||||||||||||
| 57 | Ensayos de aislamiento cableado 0.6/1 kV | 4 | Al término instalación | ||||||||||||||||||||
| 58 | Pruebas del Sistema de Puesta a Tierra | 4 | Al término instalación | ||||||||||||||||||||
| 59 | Esquema unifilar del sistema eléctrico del edificio tal como se ha instalado en obra | 4 | IF-15 | ||||||||||||||||||||
| 60 | Diagrama esquemático | 4 | IF-15 | ||||||||||||||||||||
| 61 | Equipo eléctrico activo | 4 | IF-15 | ||||||||||||||||||||
| SECCIÓN 26 51 00 | |||||||||||||||||||||||
| 62 | Aparatos de alumbrado fluorescente | 4 | |||||||||||||||||||||
| 63 | Lámparas fluorescentes | 4 | |||||||||||||||||||||
| 64 | Reactancias fluorescentes electrónicas | 4 | |||||||||||||||||||||
| 65 | Material montaje de luminarias | 4 | |||||||||||||||||||||
| 66 | Informes de Pruebas en Obra | 4 | Al término instalación | ||||||||||||||||||||
| SECCIÓN 28 31 63.00 20 | |||||||||||||||||||||||
| 67 | Diagramas de cableado punto a punto | 4 | |||||||||||||||||||||
| 68 | Planos de planta del sistema | 4 | |||||||||||||||||||||
| 69 | Cálculos de baterías | 4 | |||||||||||||||||||||
| 70 | Seccionador fusible | 4 | |||||||||||||||||||||
| 71 | Central de Alarma de Incendios | 4 | |||||||||||||||||||||
| 72 | Baterías | 4 | |||||||||||||||||||||
| 73 | Cargador de Baterías | 4 | |||||||||||||||||||||
| 74 | Detectores de calor | 4 | |||||||||||||||||||||
| 75 | Cableado | 4 | |||||||||||||||||||||
| 76 | Dispositivos de monitorización direccionables | 4 | |||||||||||||||||||||
| 77 | Procedimiento de pruebas de los detectores de humos | 4 | |||||||||||||||||||||
| 78 | Informes de pruebas | 4 | Al término instalación | ||||||||||||||||||||
| 79 | Cualificaciones del instalador | 4 | |||||||||||||||||||||
| 80 | Manuales del sistema de alarma interior de incendios | 4 | IF-15 | ||||||||||||||||||||
| 81 | Planos en software | 4 | IF-15 | ||||||||||||||||||||
| 82 | Planos As-Built del Sistema | 4 | IF-15 | ||||||||||||||||||||
| SECCIÓN 28 31 63.00 20 | |||||||||||||||||||||||
| 83 | Conductos (ambos tipos) | 4 | |||||||||||||||||||||
| 84 | Cables de Baja Tensión Enterrados | 4 | |||||||||||||||||||||
| 85 | Cinta de Aviso e Identificación | 4 | |||||||||||||||||||||
| 86 | Conductores de Tierra | 4 | |||||||||||||||||||||
| 87 | Arquetas | 4 | |||||||||||||||||||||
| 88 | Tapas de Arquetas | 4 | |||||||||||||||||||||
| 89 | Picas de Tierra | 4 | |||||||||||||||||||||
| 90 | Arquetas para Lecturas de Tierra | 4 | |||||||||||||||||||||
| 91 | Barras Equipotenciales | 4 | |||||||||||||||||||||
| 92 | Soldadura exotérmica | 4 | |||||||||||||||||||||
| 93 | Informes de Pruebas | 4 | Al término instalación | ||||||||||||||||||||
| 94 | Planos del sistema | 4 | IF-15 |
&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N