Attachment_4._13-1016_Schedule_of_Material_Submittals.xlsx

XLSX spreadsheet 57 KB Posted

Attached to
RPL A/C Unit, Bldg 107 Federal contract opportunity
Solicitation number
FA5575-16-B-0001
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Attachment 4. Schedule of Material Submittals

View the file

Other files for this federal contract opportunity

Other files attached to RPL A/C Unit, Bldg 107, newest first.
File Type Posted
Attachment_2._13-1016_Especificaciones_espanol.pdf PDF
Attachment_1._13-1016_Specs_English.pdf PDF
FA5575-16-B-0001_RPL_AC_bldg_107.pdf PDF
Attachment_3._13-1016.pdf PDF
Attachment_5._13-1016_AF_3052_KTR.xlsx XLSX spreadsheet
Attachment_6._-_PPI_reference_list.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 13-1016PROJECT TITLE
REPLACE A/C UNIT, 107 (EXCHANGE)SOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
SECTION 01 11 00
1Construction ScheduleNTP+10
2Work PlanNTP+10
SECTION 01 11 01
3Progress Schedule4NTP+10
4Mobility Plan4NTP+15
5Project Sign4NTP+15
6Quality Control Plan4NTP+15
7Environmental Protection Plan4NTP+15
8As-Built drawings4FI+15
9Spatial Data4FI+15
10Key Personnel4NTP+15
11Personel listing4NTP+15
12Health and Safety Program4NTP+15
13Warranty letter4FI+15
SECTION 02 41 10
14Manager of waste from demolition and construction4
15Manager of Hazardous waste4
16Authorized dump or treatment and recovery plant4
17Delivery and disposal/destruction certicate of waste4
SECTION 09 90 00
18Prime Coat4
19Intermediate and final coat4
20Preliminary cleaning and disinfection treatment4
SECTION 22 00 00
21Galvanized steel pipe DIN 24404
22Hose bibb and hose connection vacuum breaker4
23Ball valve4
SECTION 23 00 00
24O&M Manuals4FI+15
SECTION 23 07 00
25Refrigerant piping insulation4
26Duct insulation4
SECTION 23 30 13
27Sheet metal rectangulat ducts (METU)4
28Circular flexible ductwork4
29Linear supply diffusers4
30Return grilles4
31Manual regulation dampers4
32Fresh air intakes4
33Volume control damper for fresh air intake4
34Rotational diffuser airfoil profile louver4
35Supply diffusers and return grilles4
36Testing and balancing of air conditioning systems4Installation completion
SECTION 23 35 19
37Split heat pump equipment for ducts4
38Ductless split heat pump4
39Test reports4Installation completion
SECTION 26 20 00
40Conduits and fittings (1 of each type)4
41Outlet boxes and covers4
42Junction and pull boxes4
43Wires and cables4
44Emergency HVAC shutoff pushbuttons4
45Circuit breakers and auxiliary trip coils4
46Panelboards44
47Surge Protective Devices4
48Damper actuators and transformers4
49Safety Switches4
50Labels4
51Network Analyzer4
52Intersystem Bonding Termination4
53Receptacles4
54Device Plates4
55One line diagram4
56Devices Subject to Manual Operation4Installation completion
570.6/1 kV insulation test4Installation completion
58Grounding System Test4Installation completion
59Single line diagram of the “as-built” building electrical system4FI-15
60Schematic diagram of electrical control system4FI-15
61Active electrical equipment4FI-15
SECTION 26 51 00
62Fluorescent lighting fixtures4
63Fluorescent lamps4
64Fluorescent electronic ballasts4
65Fixture mounting hardware4
66Field Test Reports4Installation completion
SECTION 28 31 63.00 20
67Point-to-poiny wiring diagrams4
68Plan view drawings4
69Battery Power Calculations4
70Safety switch4
71Fire Alarm Control Panel (FACP)4
72Batteries4
73Battery Charger4
74Thermal sensors4
75Wiring and cable4
76Addressable interface devices4
77Smoke sensor testing procedures4
78Tests4Installation completion
79Qualification of installer4
80O&M Manuals: Interior Fire Alarm System4FI-15
81Record drawing software4FI-15
82System As-Built drawings4FI-15
SECTION 33 71 02.00 20
83Conduits (both types)4
84Underground Low Voltage Cables4
85Buried Warning and Identification Tape4
86Ground wires4
87Handholes4
88Handhole covers4
89Ground rods4
90Grounding Test/Bar Wells4
91Grounding Bars4
92Exothermic welding4
93Test Reports4Installation completion
94System record drawing4FI-15

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
13-1015TÍTULO DE PROYECTO:
REEMPLAZAR SISTEMA DE AIRE ACONDICIONADO 107SOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGAFECHA RECEPCIÓN EN CONTRATACIÓNFECHA EN INGENIERíA CIVILFECHA LÍMITE DE DEVOLUCIÓNNÚMERO DE MUESTRAFECHA NOTIFICACIÓN A CONTRATISTASEGUNDA PRESENTACIÓN DEL CONTRATISTAAPROBACIÓN FINALOBSERVACIONES
APROBADODESAPROBADO
SECCIÓN 01 11 00
1Plan de construcciónNTP+10
2Plan de obraNTP+10
SECCIÓN 01 11 01
3Programa de avance de obras4NTP+10
4Plan de movilización4NTP+15
5Cartel informativo de proyecto4NTP+15
6Plan de control de calidad4NTP+15
7Plan de protección medioambiental4NTP+15
8Planos As-Builts4IF+15
9Datos espaciales4IF+15
10Personal clave4NTP+15
11Listado de personal4NTP+15
12Plan de salud y seguridad4NTP+15
13Carta de garantía4IF+15
SECCIÓN 02 41 10
14Gestor de residuos4
15Gestor de residuos peligrosos4
16Vertedero autorizado o planta de tratamiento y valorización de residuos4
17Depósito/destrucción de residuos4
SECCIÓN 09 90 00
18Imprimación4
19Capa intermedia y final4
20Tratamientos previos de limpieza y desinfección4
SECCIÓN 22 00 00
21Tubería de acero galvanizado DIN 24404
22Grifo para manguera y rompedor de vacío4
23Válvulas de bola4
SECCIÓN 23 00 00
24Manuales de mantenimiento4IF+15
SECCIÓN 23 07 00
25Aislamiento de tubería de refrigerante4
26Aislamiento de conductos4
SECCIÓN 23 30 13
27Conductos rectangulares de chapa metálica (METU)4
28Conductos circulares flexibles4
29Difusores de impulsión lineales4
30Rejillas de retorno4
31Compuertas de regulación manual4
32Rejillas de toma de aire exterior4
33Compuertas de regulación para toma de aire exterior4
34Lama con perfil aerodinámico de difusor de impulsión4
35Difusores de impulsión y rejillas de retorno4
36Pruebas y equilibrado del sistema completo de A/A4Al término instalación
SECCIÓN 23 35 19
37Bomba de calor partida para conductos4
38Consola bomba de calor partida4
39Informes de Pruebas4Al término instalación
SECCIÓN 26 20 00
40Tubos y accesorios (1 x cada tipo)4
41Cajas para mecanismos y tapas4
42Cajas de conexión y paso4
43Conductores y cables4
44Pulsadores de paro de emergencia de climatización4
45Interruptores magnetotérmicos y bobinas de disparo4
46Cuadros eléctricos44
47Descargador de Sobretensiones4
48Servomotores de compuertas y transformadores4
49Desconectadores fusibles4
50Etiquetas4
51Analizador de redes4
52Embarrado común de tierra4
53Bases de enchufe4
54Placas de mecanismos4
55Esquema unifilar4
56Dispositivos sujetos a operación manual4Al término instalación
57Ensayos de aislamiento cableado 0.6/1 kV4Al término instalación
58Pruebas del Sistema de Puesta a Tierra4Al término instalación
59Esquema unifilar del sistema eléctrico del edificio tal como se ha instalado en obra4IF-15
60Diagrama esquemático4IF-15
61Equipo eléctrico activo4IF-15
SECCIÓN 26 51 00
62Aparatos de alumbrado fluorescente4
63Lámparas fluorescentes4
64Reactancias fluorescentes electrónicas4
65Material montaje de luminarias4
66Informes de Pruebas en Obra4Al término instalación
SECCIÓN 28 31 63.00 20
67Diagramas de cableado punto a punto4
68Planos de planta del sistema4
69Cálculos de baterías4
70Seccionador fusible4
71Central de Alarma de Incendios4
72Baterías4
73Cargador de Baterías4
74Detectores de calor4
75Cableado4
76Dispositivos de monitorización direccionables4
77Procedimiento de pruebas de los detectores de humos4
78Informes de pruebas4Al término instalación
79Cualificaciones del instalador4
80Manuales del sistema de alarma interior de incendios4IF-15
81Planos en software4IF-15
82Planos As-Built del Sistema4IF-15
SECCIÓN 28 31 63.00 20
83Conductos (ambos tipos)4
84Cables de Baja Tensión Enterrados4
85Cinta de Aviso e Identificación4
86Conductores de Tierra4
87Arquetas4
88Tapas de Arquetas4
89Picas de Tierra4
90Arquetas para Lecturas de Tierra4
91Barras Equipotenciales4
92Soldadura exotérmica4
93Informes de Pruebas4Al término instalación
94Planos del sistema4IF-15

&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N

File details come from the government source that posted it. Updated .