FA557018Q00220002.pdf
PDF 143 KB Posted
- Attached to
- Surveillance System Upgrade Federal contract opportunity
- Solicitation number
- FA557018Q0022
About this file
FA557018Q00220002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA557018Q00220003.pdf | ||
| FA557018Q00220001.pdf | ||
| Attachment_1_Statement_of_Work.pdf | ||
| FA557018Q0022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
FA557018Q00220002
QUESTIONS AND ANSWERS SET 2
FA557018Q0022
SURVEILLANCE SYSTEM UPGRADE
RAF CROUGHTON
UNITED KINGDOM
Question 1) At Gate One, can we assume that the underground ducts leading from the two existing camera poles to the Gatehouse are viable and clear to allow new cables to be installed within them?
Answer 1) There has been no recent survey conducted on the mentioned duct. Offerors must
Question 2) At Gate One, is it a requirement to remove the existing CCTV monitors and replace the same with a 32” ceiling mounted screen displaying all Gate One cameras?
Answer 2) Yes
Question 3) Do you require the following?
· Remove all existing old CRT CCTV monitors at Building 4
· Cover holes where previous CRT CCTV monitors were mounted, remount all existing computer monitors to include corporate IT and Vindicator onto new board, and install new 28” CCTV spot monitor inot the same arrangement.
· Reuse existing large screen monitor for multi camera viewing
· Provide new 43” monitor mounted on the board for multi camera viewing
Answer 3) See revised paragraph 3.d of Statement of Work
Question 4) Can you confirm that all CCTV recording and control equipment is to be installed in the 19” rack?
Answer 4) Yes
Question 5) Can you confirm if there is a requirement for a UPS to be fitted into the 19” rack to support the CCTV equipment mounted in the rack for 4 hours?
Answer 5) Not required
Question 6) Can you confirm that the existing fiber communication cable is multimode or single mode?
Answer 6) Building 1 (front gate) has single mode (coming from Building 4) and a hybrid fiber (coming from Building 30) going to it. The fiber to the poles would come off of Building 1, Building 4 is also fed from Building 30 via 12 strands of multimode fiber.
Question 7) Please provide appendices A and B
Answer 7) Copies of the appendices will be provided through AMRDEC. An email with the download link will be provided to those who request copies of the appendices.
Question 8) The bullet camera model indicated in the solicitation (Bosch NTC-255-PI) is no longer available in the UK.
Answer 8) Provide a camera with similar specifications and capabilities similar or equal to NTC-255-PI
Question 9) What camera should be allowed for in response to this solicitation?
Answer 9) See Answer 8
Question 10) The Statement of Work states that all cameras must have an infrared lighting feature. The solicitation document indicates that 11 Bosch MIC PTZs are required, but only details 3 sets of IR illuminators – is this correct or is there a requirement for 11 sets of IR illuminators to ensure that all cameras have the infrared lighting feature?
Answer 10) All cameras must have infrared lighting feature.
Question 11) Can we assume that electrical mains power will be supplied by the Base contractor outside of this SOW to each camera location i.e. base of the CCTV pole or is this a requirement within our SOW? Can you confirm that mains power and a fiber connection will be provided on the outside of building chosen as the link point (either Outdoor Rec, Gym, or Post Office)?
Answer 11) No, as of the moment the government does not intend to provide electrical mains and communication cables on locations where it does not exist.
Question 12) Does the requested 3-year warranty include all call outs, (whether the issue is equipment related or not), include periodic camera cleaning and all software firmware updates of the 3 years period or is the warranty just relating to equipment failure?
Answer 12) Provide standard commercial warranty good for three years.
Question 13) Can I assume that all of the CCTV control equipment should be manufactured by Bosch?
Answer 13) All control equipment must be compatible with the offeror’s proposed surveillance system.
Question 14) As the contractor will need to provide all mounting solutions, can I assume that the installation of concrete camera pole bases and supporting underground duct network will be undertaken by the base contractor and be outside of the SOW for this contract?
Answer 14) No, the contractor shall be responsible for all mounting solutions to include installation of concrete camera pole bases and supporting underground duct network.
Question 15) Can you confirm that radio in the 60 GHz to 66 GHz should be used?
Answer 15) This information will be provided to the successful offeror.
Question 16) Are we allowed to reuse one of the existing thermal cameras onto the new camera pole?
Answer 16) No, all cameras must be new.
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Yes |
| Check Box5: Yes |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Signature12: |
| Text13: |
| 0: |
| 1: |
| Text14: |
| 0: |
| 1: |
Text15: The purpose of this amendment is to provide the government's response to the questions received from the solicitation (see attached).
Offerors must submit a completed copy of this amendment (15A through C) along with their offer.
| Text16: |
| 0: |
| 1: |
| 2: |
| 3: |
| Text17: 1 |
| Text18: |
| Text19: |
| 0: 1 |
| 1: 1 |
| Text20: 0002 |
| Text21: 20-Sep-18 |
| Text22: |
| Text23: |
| Text24: |
| Text25: |
| Text26: CONTRACTING FLIGHT, 501 CSW/RCO |
BLDG 516, RAF ALCONBURY
HUNTINGDON PE284DA