Revised AF 3052 Construction Cost Estimate Breakdown

View the file

Other files for this federal contract opportunity

Other files attached to Install Radon Mitigation, Non-GOH (91 Units), newest first.
File Type Posted
RFI-003_Summary.pdf PDF
Amendment_03.pdf PDF
RFI-002_Summary.pdf PDF
Revised_SOW_7_July_2016.pdf PDF
Amendment_2.pdf PDF
RFI_Q A_(Part_1).pdf PDF
Revised_SOW_5_July_2016.doc DOC document
Amendment.pdf PDF
Attach_1_-_Submission_of_Relevant_Experience.pdf PDF
Attach_2-_AF_Form_3052 _Construction_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
Attach_3_-_As-Built_Drawings.pdf PDF
Attachment_4-_Other_Contracting_Requirements.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB No. 0704-0193

CONSTRUCTION COST ESTIMATE BREAKDOWN (CONTRACTOR) Expires 31 October 1989

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

Install Radon Mitigation, NON-GOH (91UN)

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

LXEZ 164313 Various MFH, Okinawa, Japan

MATERIAL COST LABOR COSTS

UNIT OTHER

LINE ITEM OF QUANTITY MANHOURS AVERAGE DIRECT LINE

NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL COSTS TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

SUMMARY

I 1-Story

II 2-Story

III Remove and Dispose Existing Mitigation System

Total Direct Cost

Design %

Sub-Total

Overhead %

Sub-Total

Profit %

Total Project Cost

@$1.00= 121.8300¥ -$

AF FORM 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE. FOR OFFICIAL USE ONLY

CONSTRUCTION COST ESTIMATE BREAKDOWN (CONTRACTOR) Expires 31 October 1989

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

Install Radon Mitigation, NON-GOH (91UN)

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

LXEZ 164313 Various MFH, Okinawa, Japan

MATERIAL COST LABOR COSTS

UNIT OTHER

LINE ITEM OF QUANTITY MANHOURS AVERAGE DIRECT LINE

NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL COSTS TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

I Type : 1-Story (Each Unit)

1 Excavation, Remove and dispose M³

2 Aggregate/Concrete M³

3 4" PVC Vent from Suction Pit M

4 Exhaust Fan with Cover include Electrical Work SET

5 Asbestos/ LBP sampling and testing LOT

6 Post Mitigation Testing EA

7 Misc. Materials and Labor (Sodding, Repair Existing Tile, etc.,) LS

Total Direct Cost

CONSTRUCTION COST ESTIMATE BREAKDOWN (CONTRACTOR) Expires 31 October 1989

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

Install Radon Mitigation, NON-GOH (91UN)

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

LXEZ 164313 Various MFH, Okinawa, Japan

MATERIAL COST LABOR COSTS

UNIT OTHER

LINE ITEM OF QUANTITY MANHOURS AVERAGE DIRECT LINE

NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL COSTS TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

II Type : 2-Story (Each Unit)

1 Excavation, Remove and dispose M³

2 Aggregate/Concrete M³

3 4" PVC Vent from Suction Pit M

4 Exhaust Fan with Cover include Electrical Work SET

5 Asbestos/ LBP sampling and testing LOT

6 Post Mitigation Testing EA

7 Misc. Materials and Labor (Sodding, Repair Existing Tile, etc.,) LS