Attach_2-_AF_Form_3052 _Construction_Cost_Estimate_Breakdown.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Install Radon Mitigation, Non-GOH (91 Units) Federal contract opportunity
Solicitation number
FA5270-16-R-0018
Issued by
Department of the Air Force Pacific Air Forces

About this file

AF Form 3052 Construction Cost Estimate

View the file

Other files for this federal contract opportunity

Other files attached to Install Radon Mitigation, Non-GOH (91 Units), newest first.
File Type Posted
RFI-003_Summary.pdf PDF
(C)_AF_3052__14_Jul_16.pdf PDF
Amendment_03.pdf PDF
RFI-002_Summary.pdf PDF
Amendment_2.pdf PDF
Revised_SOW_7_July_2016.pdf PDF
RFI_Q A_(Part_1).pdf PDF
Revised_SOW_5_July_2016.doc DOC document
Amendment.pdf PDF
Attach_1_-_Submission_of_Relevant_Experience.pdf PDF
Attachment_4-_Other_Contracting_Requirements.docx DOCX document
Attach_3_-_As-Built_Drawings.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EVKP 15-4269

OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN(CONTRACTOR)Expires 31 October 1989
CONTRACTORADDRESS
CONTRACT FOR(Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Install Radon Mitigation, NON-GOH (91UN)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
LXEZ 164313Various MFH, Okinawa, Japan
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYMANHOURSAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALMANDAYSRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
SUMMARY
I1-Story
II2-Story
IIIRemove and Dispose Existing Mitigation System
Total Direct Cost
Design%
Sub-Total
Overhead%
Sub-Total
Profit%
Total Project Cost
@$1.00=¥ 121.8300$ - 0
AF FORM 3052, JAN 88PREVIOUS EDITION IS OBSOLETE.FOR OFFICIAL USE ONLY
IType : 1-Story (Each Unit)
1Excavation, Remove and disposeM³
2Aggregate/ConcreteM³
34" PVC Vent from Suction PitM
4Exhaust Fan with Cover include Electrical WorkSET
5Asbestos/ LBP sampling and testingLOT
6Misc. Materials and Labor (Sodding, Repair Existing Tile, etc.,)LS
Total Direct Cost
AF FORM 3052, JAN 88PREVIOUS EDITION IS OBSOLETE.FOR OFFICIAL USE ONLY
IIType : 2-Story (Each Unit)
1Excavation, Remove and disposeM³
2Aggregate/ConcreteM³
34" PVC Vent from Suction PitM
4Exhaust Fan with Cover include Electrical WorkSET
5Asbestos/ LBP sampling and testingLOT
6Misc. Materials and Labor (Sodding, Repair Existing Tile, etc.,)LS
Total Direct Cost

AF FORM 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE. FOR OFFICIAL USE ONLY