Question_and_Answer.pdf

PDF 199 KB Posted

Attached to
Install Utility Lines at Vehicle Wash Facility Federal contract opportunity
Solicitation number
FA5270-16-R-0011
Issued by
Department of the Air Force Pacific Air Forces

About this file

Responses to Request for Information

View the file

Other files for this federal contract opportunity

Other files attached to Install Utility Lines at Vehicle Wash Facility, newest first.
File Type Posted
Reference.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
Attachment_2.pdf PDF
Attachment_3.pdf PDF
FA5270-16-R-0011.pdf PDF
Attachment_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers #1

Solicitation FA5270-16-R-0011, Install Utility Lines, Vehicle Wash Rack Facility

No Reference Question Government Response

1 General Could you inform electrical capacity of vehicle wash rack system?

Electrical capacity for this project is 150 AMPS, 230V 3Phase, 60HZ.

(see SOW 1.1(e))

2 General Does the surface needs to be level? Yes, contractor shall modify concrete floor level to suit new wash rack platform. See provided manufacturer’s information

3 General Where is the power coming from? Contractor shall include installation of new transformer.

4 General Please advise exact location to install the water drainage

Water drainage will be install and connected to Wash equipment, see provided manufacturer’s information

5 General Are there acceptable alternative Japanese Standards to use in the project?

Alternative Japanese standard/material can be use as substitute if contractor can provide needed information that justify its equal or better than American standard/materials for government consideration.

6 General Will the contractor require to conduct laboratory test for Legionella and Aerobic organism level before or after the construction?

NOT require

7 General Is it possible to know the characteristics and requirements of the future machine which will install in the future?

See provided manufacturer’s information

8 General Please provide specification for Government furnished wash rack (e.g. watts, Voltage, etc…)

See provided manufacturer’s information

9 Drawings Will there be available elevation drawing or topographic drawing?

Contractor shall modify existing concrete floor elevation to suit Wash rack system platform see provided manufacturer’s information.

10 Electrical Respect to electrical part, what characteristics of panel board is going to install in the future?

Without this information, it is not possible to decide the type and number of conductor for electrical supply.

New panel shall be 150 AMPS, 230V, 3Phase, 60HZ (see SOW 1.1(e))

11 Electrical For the Electrical Trench, will it be Yes, prior to actual construction necessary to Dye in red the exterior level of the concrete encasement?

12 Electrical Please advise if the panels and conduits need to be explosion proof.

Yes

13 SF 1442,

page 4 of 35, SOW 1.1(d)

If the 6” minimum diameter drainage system approximately 42 LM means, that connection between the oil separator and existing manhole?

May not be require, see provided manufacturer’s information of wash rack system.

14 SF 1442,

page 4 of 35, SOW 1.1(c)

Where is the joint of connection for water line have to be located?

Would it be connected to the vehicle washer?

Yes to be connected to vehicle washer See provided manufacturer’s information

15 SF 1442,

page 4 of 35, SOW 1.1(e)

Where is the joint of connection for power line have to be located?

Please provide the information for electrical spec for the vehicle washer.

Power require for the vehicle wash rack is 150 AMPS, 230V, 3 Phase, 60HZ (see SOW 1.1(e))