EVKP_154383_Radon_Solicitation_Amendment.pdf

PDF 214 KB Posted

Attached to
Install Radon Mitigation Non GOH (32 Units) Federal contract opportunity
Solicitation number
FA5270-15-T-0054
Issued by
Department of the Air Force Pacific Air Forces

About this file

Solicitation Amendment 1

View the file

Other files for this federal contract opportunity

Other files attached to Install Radon Mitigation Non GOH (32 Units), newest first.
File Type Posted
RFI_Responses_Radon_Mitigation.doc DOC document
FA5270-15-T-0054_Radon_Mitigation.pdf PDF
SOW-Radon_Mitigation.pdf PDF
AF_Form_3052_Blank.pdf PDF
As-Built_Drawings_Radon_Mitigation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EVKP 154383

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment to clause CONST-L-7300.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Apr-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5270-15-T-0054

X 9B. DATED (SEE ITEM 11)

26-Mar-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Apr-2015

CODE

18 CONS

UNIT 5199, BLDG 95 KADENA AB

APO AP 96368

FA5270 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA5270-15-T-0054

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The Issued By organization has changed from

18 CONS/INFRASTRUCTURE ACQUISITION

POC: VENICE PAMPARO

UNIT 5199, BLDG 95

APO AP 96368

to

18 CONS/INFRASTRUCTURE ACQUISITION

POC: AMBER SCYOC

UNIT 5199, BLDG 95 KADENA AB

APO AP 96368

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

CONST-L-7300 PROPOSAL PREPARATION INSTRUCTIONS (JUN 2006)

A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.

Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements.

Failure to meet a requirement may result in an offer being ineligible for award. The response shall consist of one (1) part, Part I - Price Proposal.

B. The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer’s opinion, adequate price competition exists, no additional cost information will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists, offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.

C. Specific Instructions:

1. PART I — PRICE PROPOSAL - Submit original and one (1) copy.

(a) Complete blocks 14, 15, 16, 19 (as appropriate), 20A, 20B, and 20C of the RFP Section A, Standard

Form 1442. In doing so, the offeror accedes to the contract terms and conditions as written in the Request for

Proposal (RFP) Sections A through K. These sections constitute the model contract.

(b) Insert proposed unit prices in the attachment labled EXHIBIT and extended sum prices in Section B for each Contract Line Item Number (CLIN), including all options, ensure that the EXHIBIT is submitted both in electronic form via a CD disk and 2 paper copies .

(c) Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For any other sections, the offeror shall only submit the pages, if any, that require a fill-in. Section J

EXHIBIT shall be filled in and submitted both in paper form and electronic CD, and must be submitted in the same

FA5270-15-T-0054

excel format provided in the attachment. (offerors must request a CD containing the EXHIBIT from the contracting officer).

D. Documents submitted in response to this RFP must be fully responsive to and consistent with the following:

1. Requirements of the RFP Contract Line Items Numbers (CLINs), specifications and drawings, and government standards and regulations pertaining to the specifications and drawings.

2. Evaluation Factors for Award in Section M of this RFP.

3. Any limitation on the number of proposal pages. Pages exceeding the page limitations set forth in this Section

L will not be read or evaluated, and will be removed from the proposal.

4. Format for proposal shall be as follows:

(a) A page is defined as one face of an 8 ½” x 11” sheet of paper containing information.

(b) Typing shall not be less than 12 pitch.

E. Proposal Submission:

1) Submit your proposal to arrive NOT LATER THAN MONDAY, 27 APRIL 2015 2:00 P.M., LOCAL

TIME.

2) All proposals delivered in response to this solicitation shall reflect the following information on the address label:

a. Solicitation Number FA5270-15-R-0054.

b. The legend, "To be delivered unopened to the Contracting Officer", and

c. The volume and copy numbers contained in each box/envelope.

3) Submit your proposal to the following address:

Amber Scyoc/Venice Pamparo

18th Contracting Squadron / LGCC

Unit 5199, Bldg 95

APO, AP 96368 (Okinawa, Japan)

(End of Provision)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .