Attachment_4.pdf
PDF 60 KB Posted
- Attached to
- Install Radon Mitigation, Non-GOH (39 Units) Federal contract opportunity
- Solicitation number
- FA5270-15-R-0012
About this file
Attachment 4
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| RFI_Signed.pdf | ||
| Amendment_2.pdf | ||
| REVISED_Attachment_1.pdf | ||
| Attachment_2.pdf | ||
| solicitation.pdf | ||
| Attachment_3_.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4 AF Form 3052
OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN (CONTRACTOR) Expires 31 October 1989
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE Install Radon Mitigation Non-GOH (39 UN)
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
LXEZ 15-4312 Kadena Air Base, Okinawa, Japan
MATERIAL COST LABOR COSTS
UNIT OTHER
LINE ITEM OF QUANTITY MANHOURS AVERAGE DIRECT LINE
NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL COSTS TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUMMARY
I 1-Story Unit
II 2-Story Unit
III Remove and Dispose Existing Mitigation System LS
Total Direct Cost
Design
Sub-Total
Overhead
Sub-Total
Profit
Total Project Cost
@$1.00= 103.9439¥ -$
AF FORM 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE. FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWN (CONTRACTOR) Expires 31 October 1989
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE Install Radon Mitigation Non-GOH (39 UN)
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
LXEZ 15-4312 Kadena Air Base, Okinawa, Japan
MATERIAL COST LABOR COSTS
UNIT OTHER
LINE ITEM OF QUANTITY MANHOURS AVERAGE DIRECT LINE
NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL COSTS TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
I Type : 1-Story (Each Unit)
1 Excavation, Remove and dispose M³
2 Aggregate/Concrete M³
3 4" PVC Vent from Suction Pit M
4 Exhaust Fan with Cover include Electrical Work SET
5 Asbestos/ LBP sampling and testing LOT
6 Misc. Materials and Labor (Sodding, Repair Existing Tile, etc.,) LS
Total Direct Cost
CONSTRUCTION COST ESTIMATE BREAKDOWN (CONTRACTOR) Expires 31 October 1989
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE Install Radon Mitigation Non-GOH (39 UN)
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
LXEZ 15-4312 Kadena Air Base, Okinawa, Japan
MATERIAL COST LABOR COSTS
UNIT OTHER
LINE ITEM OF QUANTITY MANHOURS AVERAGE DIRECT LINE
NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL COSTS TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
II Type : 2-Story (Each Unit)
1 Excavation, Remove and dispose M³
2 Aggregate/Concrete M³
3 4" PVC Vent from Suction Pit M
4 Exhaust Fan with Cover include Electrical Work SET
5 Asbestos/ LBP sampling and testing LOT
6 Misc. Materials and Labor (Sodding, Repair Existing Tile, etc.,) LS
Total Direct Cost
| Attachment 4 |
| (C) Cost Est Non GOH |
| EVKP 15-4269 |