Amendment_2.pdf
PDF 42 KB Posted
- Attached to
- Install Radon Mitigation, Non-GOH (39 Units) Federal contract opportunity
- Solicitation number
- FA5270-15-R-0012
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_Signed.pdf | ||
| Amendment_1.pdf | ||
| Attachment_4.pdf | ||
| Attachment_2.pdf | ||
| solicitation.pdf | ||
| REVISED_Attachment_1.pdf | ||
| Attachment_3_.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LXEZ 15-4312
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate the requirements for the technical proposal in Section L.
Receipt of offers remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Apr-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5270-15-R-0012
X 9B. DATED (SEE ITEM 11)
30-Mar-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Apr-2015
CODE
18 CONS/INFRASTRUCTURE ACQUISITION
POC: AMY JENKINS
UNIT 5199, BLDG 95
APO AP 96368
FA5270 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA5270-15-R-0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
PROPOSAL INSTRUCTIONS
L- PROPOSAL PREPARATION INSTRUCTIONS
A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.
Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors.
Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of three (3) separate parts; Part I - Summary and Miscellaneous Data, Part II - Price Proposal, and Part III - Technical Proposal.
B. Specific Instructions:
1. PART I – SUMMARY AND MISCELLANEOUS DATA. Submit original plus 1 copy.
(a) The offeror shall provide a concise summary and master table of contents of the entire proposal.
(b) Complete blocks 14, 15, 17, 18, 20a, 20b and 20c of the RFP Section A, SF 1442. In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through K. These sections constitute the model contract.
(c) Complete block 19 of the RFP Section A, SF 1442, if any solicitation amendment(s) to the original solicitation documents was/were issued. Amendments will not be counted against the page limits.
(d) Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For Sections C through I, the offeror shall submit only those pages that require a fill-in.
2. PART II – PRICE PROPOSAL - Submit original plus 1 copy.
(a) This part shall contain a completed Section B (Prices and costs).
(b) Insert proposed unit prices and extended amounts in Section B for each Contract Line Item Number
(CLIN). The extended amount must equal the unit price multiplied by the number of units. It is imperative that mathematical calculations are correct; particular care should be taken to ensure the amounts match when using the EXCEL program and the rounding of figures, limited to two decimal places.
(c) Extreme care should be exercised to ensure that no price data of any kind are included in any other Part of the proposal.
3. PART III – TECHNICAL PROPOSAL - Limited to no more than 15 pages. Submit original plus 1 copy.
(a) Recent/Relevant Experience
Complete and submit Attachment 3, Submission of Recent/Relevant Experience. Describe, in detail, projects that the offeror’s proposed project team has completed on schedule that are similar or greater in type, scope, size and complexity to this acquisition. Provide sufficient factual information to demonstrate the capability of the project team proposed for this project to successfully complete the current acquisition on schedule. Specifically address the role, degree of involvement and responsibility, and range of duties performed by the proposed key personnel for this acquisition in the projects selected to demonstrate the proposed team’s experience.
(b) Licenses/Qualifications – Submit two (2) copies
Submit a copy of the required documentation showing your proposed Designer engineer and installer requirement have the required licenses/certificates per the SOW, paragraph 3.5.
C. Format for proposal Parts I and III shall be as follows:
(a) Each written Part of the proposal shall be separately bound and labeled in standard three ring loose-leaf binders and clearly identified on the front and side. Each Part shall contain a Table of Contents, Cross References, and the List of Tables and Drawings (if applicable).
Cover pages, Table of Contents, and Tabs will not be counted against the page limits. However, pages depicting tables, charts, graphs and figures will count toward the page limit. The number of copies of each part is specified in paragraph B, Specific Instructions, above.
(b) The proposals will be on 8 1/2” x 11” paper, except for fold-outs used for charts, tables, or diagrams, which may not exceed 11” x 17”.
(c) A page is defined as one face of a sheet of paper containing information. Two pages may be printed on one sheet of paper.
(d) All printing shall be single-spaced. Spacing characteristics are applicable to charts and graphs.
(e) Typing shall not be less than 10 pitch. Size of print is applicable to charts and graphs.
(f) Page margins shall be a minimum of 1 inch top, bottom, and each side.
(g) In addition to the paper copies specified for each Part, one electronic copy of each Part of the entire offer must be submitted. The electronic version of the proposal shall be submitted in a format readable by Microsoft Office 2007 which includes software programs such as WORD, EXCEL, or PowerPoint. For those pages of the proposal that cannot be submitted using Microsoft Office, such as the Standard Form 33, offerors shall include those pages electronically using Adobe Acrobat portable document files (.pdf) format. The Price Part shall be submitted in spreadsheet format, such as EXCEL, and MS WORD for price narrative. The electronic version shall be submitted on a compact disc (CD). USB flash drives, floppy disks, and zip disks are not acceptable.
Indicate on each CD the Part number and title. The paper copies and electronic versions shall be identical in all respects. In the event there are any discrepancies between the hard and electronic copies, the hard copies take precedence and will be used for evaluation. Ensure the electronic documents stored on the CD can be opened. Use separate files and folders to permit rapid location of all portions, including exhibits and attachments, if any.
Replacement CDs will be required to update the final proposal resulting from any discussions and updates, if applicable.
(i) Each Part shall be complete in itself and shall not reference information contained in other Parts. Page
1 of a Part is defined as the first page after the Table of Contents. All pages shall be numbered.
(j) Price data of any kind shall be presented only in the Price Proposal Part.
(k) Elaborate formats, bindings, and color presentations are not desired or required.
The following table summarizes the proposal submission:
(Insert the number of electronic copies, number of paper copies, maximum allowable pages, and the due date.)
D. General Information:
1. Information regarding submission of proposals: Hand carried or mailed proposals must be delivered to the following address:
18 Contracting Squadron/LGCC Attn: Amy Jenkins Unit 5199, Bldg 95 APO, AP 96368 (Okinawa, Japan)
2. The sealed envelope or package used to submit your proposal must show the time and date specified for receipt, the solicitation number, and the name and address of the offeror.
3. Offerors are cautioned that Kadena Air Base has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. SOME DELAY SHOULD BE EXPECTED WHEN HAND-CARRYING PROPOSALS. If an escort is required, arrangements must be made by contacting the contract specialist, Ms. Amy Jenkins, via email at amy.jenkins.3@us.af.mil no later than three (3) business days prior to the proposal due date. Late proposals will be processed in accordance with FAR 52.215-1(c)(3),“Submission, modification, revision, and withdrawal of proposals.”
4. FEDERAL HOLIDAYS: The following Federal Legal Holidays are observed by this base:
New Year’s Day 1 January Birthday of Martin Luther King Third Monday in January Washington’s Birthday Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November
PART TITLE ELECTRONIC
COPY
PAPER
COPY PAGE LIMIT DUE DATE
I
Summary and Misc Data (File Name: Part I) 0 2 N/A 30 April 2015
II
Price (File Name: Part II) 0 2 N/A 30 April 2015
III
Technical (File Name: Part III) 0 2 N/A 30 April 2015 mailto:amy.jenkins.3@us.af.mil
Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
JOINT VENTURE AGREEMENTS. Joint Ventures are allowable on competitive 8(a) set-asides; however, the joint venture agreement must be received by SBA prior to proposal due date and approved before award of any resulting contract. If you are contemplating a joint venture on this project, you must advise your assigned SBA Business Opportunity Specialist (BOS) as soon as possible. It is also recommended that the agreement be submitted as soon as practicable to ensure compliance with established regulations. Any corrections and/or changes needed can be made only when your BOS has adequate time for a thorough review before the proposal due date. NO
CORRECTIONS AND/OR CHANGES ARE ALLOWED AFTER TIME OF SUBMISSION OF PROPOSAL OR
BIDS.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .