Q A_4_Doc.pdf

PDF 176 KB Posted

Attached to
Wash Station Federal contract opportunity
Solicitation number
FA5270-15-Q-A013
Issued by
Department of the Air Force Pacific Air Forces

View the file

Other files for this federal contract opportunity

Other files attached to Wash Station, newest first.
File Type Posted
Q A_3_Doc.pdf PDF
Q A_2_Doc.pdf PDF
Q A_Doc.pdf PDF
Combined_Amendment.pdf PDF
Amendment_1.pdf PDF
Combined_Synopsis_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ#: FA5270-15-Q-A013

Questions and Answers

Wash Station

1. The Specification calls for a "Has 42L x 18W Regular Rack System with integrated Parallel 1 inch width Trough Assy, 16 feet wide drive on/off ramps." Typically this part number would have 24" wide troughs with covered grating. Should the 1" width actually state 24"?

A: 24" or 12" troughs are both fine

2. The filtration and pressure washer equipment is typically packaged in an insulated and ventilated 20' long ISO container to protect the equipment from weather and allow the equipment to be easily moved. The container typically includes all electrical distribution panels, convenience outlets, lights and has insulation with aluminum skin walls. Should the filtration and pressure washer equipment be packaged in a 20' ISO container with the above specifications?

A: Yes

3. Should the pressure washers be controlled by a remote control panel? The remote panel would allow the operator to turn the pressure washers on/off without having to walk into the container or to the pressure washer.

4. Is the refueler with a 68,000lb GVW a standard refueler with 3 axles?

MCTAGUE, KILE J A1C USAF

CONTRACT SPECIALIST

File details come from the government source that posted it. Updated .