Attachment 3 - RFI Responses - Updated 26 Aug.pdf
PDF 102 KB Posted
- Attached to
- 36 WG/CP IDS Federal contract opportunity
- Solicitation number
- FA524021Q0057
About this file
This document contains responses to a Request for Information (RFI) related to an upcoming solicitation for intrusion detection system (IDS) services at a 36th Wing facility. The RFI responses indicate the government will provide fiber for required communication lines but the contractor must supply any additional equipment such as switches, racks, and media converters. While the government may provide as-built drawings of existing cable trays and conduits on a case-by-case basis, surface mounted conduit may be used if existing installations are incomplete or prevent sensor placement. The doors supplied by the government for the project will not include precuts for security locking hardware, which must be provided by the contractor.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA524021Q0057 03 36 WG IDS (signed).pdf | ||
| FA524021Q0057 02 36 WG IDS (signed).pdf | ||
| FA524021Q0057 Amendment 01 36 WG IDS (KO).pdf | ||
| Attachment 3 - Request for Information Responses.pdf | ||
| Attachment 2 - CUI Non-Nuclear CMD List 13 May 2021.pdf | ||
| FA524021Q0057 36 WG IDS.pdf | ||
| CP IDS - Brand Name JA_Redacted.pdf | ||
| Attachment 1 - Performance Work Statement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (RFI) Responses
FA524021Q0057 36 WG IDS
Updated 26 August 2021
Q: Will the Air Force make sure the new doors will have precuts from the manufacturer to accommodate the security locking hardware?
A: Doors provided by the Government will not have precuts to accommodate for the security locking hardware.
Q: Regarding the Main Entry New Inner Door with FF‐L‐2740, will the new door be pre‐cut for the FF‐L‐2740 from the factory?
A: The Government can provide a blank aluminum door but it will not come with the cutout for the FF‐L‐2740.
Q: Will the Government provide as‐built drawing showing the cable trays and conduits that are for the new Vindicator System?
A: These are not available at this time however the Government may provide these on a case‐by‐case basis based upon request by the contractor.
A: The Government may provide these via secure file transfer upon request by an interested vendor.
Q: Will the Government allow surface mounted conduit if existing conduits installed are not complete or installed where sensors must be installed?
A: The Government does not have an answer for this at this time, however information may be provided upon award.
Q: Will the Government take care of all inter building communication requirement for the system to report to 36th Security Forces, to include the switches, fiber connection, rack media converters, etc. if, needed?
A: The Government shall provide fiber, however switches, racks, media converters, etc. shall be provided by the contractor.
Q: Will the Government take care of the fiber communication between the new command center to 36th security forces, to include media converters, rack, switches, etc.?
A: The Government shall provide fiber, however switches, racks, media converters, etc. shall be provided by the contractor.