Statement_of_Work_Refurbish_RHU.docx
DOCX document 22 KB Posted
- Attached to
- Refurbish and Enhancement of CONEX Containers
- Solicitation number
- FA5240-15-Q-M038
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statement_of_Work_Refurbish_RHU_(updated).docx | DOCX document | |
| Updated_Answers.docx | DOCX document | |
| Q A.docx | DOCX document | |
| CONNEX_REFAB.pptx | PPTX presentation | |
| Combo_Atmospherics.doc | DOC document | |
| Wage_Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRELIMINARY STATEMENT OF WORK
REFURBISH AND ENHANCE CONEX’s
ANDERSEN AIR FORCE BASE (GUAM)
1. GENERAL The work covered by this contract consists of, but is not limited to, the maintenance, labor, services, tools, materials, equipment, transportation, supervision and all requirements to perform all operations in conjunction with maintenance and servicing of the PACOM village urban operations containers on North West Field, Andersen Air Force Base (AAFB), Guam in support of the 736 Commando Warrior regional training area.
2. CONTRACTOR REQUIREMENTS
a. The contractor shall provide one time service; refurbish and enhance the containers listed below to 736 SFS at Northwest Field AAFB.
b. Contractor shall complete repairs for the 736 Commando Warrior (AAFB), Guam.
c. All work shall be in accordance with the container repair checklist below.
d. Full Equipment List:
| Make |
| Model |
| Estimated Last Service Date (month/year) |
| Qty |
| CONEX |
| 40 ft double wide container |
| unknown |
| 5 |
| CONEX |
| 20 ft container |
| unknown |
| 11 |
| CONEX |
| Pedestrian bridges |
| unknown |
| 2 |
e. Estimated Service List:
The list below is an estimate of the maintenance and service needs for container repairs. If additional service or maintenance items are needed, approval must first be obtained through the Contracting Officer prior to proceeding with repairs.
CONTAINER REPAIR CHECKLIST
A. (1 Exterior enhancement of 11 each 8 ft x 20 ft CONEX boxes. This will include a minimum of four (2) doors and four (4) windows per CONEX box. Textures to resemble Southeast Asia.
B. Interior enhancement of five (5) each CONEX Boxes. This will include false walls, hides and wall placement to create rooms and hallways.
C. 15 sets of stairs made of galvanized steel for doors that are going into containers.
D. Covering of two each pedestrian bridges.
E. Exterior Atmospherics Specifics: Livestock Pen that includes fencing, gates, troughs, buckets, harnesses, covered area and faux livestock.
4. BASE ACCESS The contractor must notify the Contracting Officer’s Representative (COR) 24 hours prior to completing repairs and arrange a time to meet at AAFB visitors center Bldg. 2403, provide a valid photograph, vehicle registration form, and proof of insurance to obtain an AF Form 75, visitor and vehicle pass if needed.
5. LOCATION All work shall be performed at Northwest Field work site.
6. WORK INTERRUPTION All work must be accomplished in such a manner that minimum inconvenience will be caused to the using agency.
7. SCHEDULE All routine work shall be completed within 6-8 weeks. Notification is needed for any container needing more than 6-8 weeks servicing due to parts being ordered from off island vendors.
8. PERFORMANCE The performance period will begin within 30 working days after receipt of contract.
9. QUALITY ASSURANCE
a. Inspection at Contractor’s Location - After completion of service the vendor must inspect the containers to ensure proper function at their facility and provide a copy of the repair invoice to the GTR. If there any additional services required to a container a written quote must be submitted to the GTR and CO for approval prior to providing additional service.
b. Inspection at AAFB - Upon completion of repairs, 736 SFS personnel and the company representative will ensure proper functioning of all serviced containers prior to departure of the company rep to ensure that all repairs were made and all are functioning properly.
File details come from the government source that posted it. Updated .