QandA.docx

DOCX document 27 KB Posted

Attached to
Uninterrupted Power Supply (UPS) Federal contract opportunity
Solicitation number
FA5215-13-T-0002
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

Questions and Answers from emails and the site visit including a fact sheet on each UPS unit.

View the file

Other files for this federal contract opportunity

Other files attached to Uninterrupted Power Supply (UPS), newest first.
File Type Posted
FA5215-13-T-0002-0003 _Extend_Sol_Closing_Time.pdf PDF
QandA2.docx DOCX document
FA5215-13-T-0002-00002 _Amendment_for_CLIN_0002.pdf PDF
FA5215-13-T-0002-0001.pdf PDF
FA5215-13-T-0002.pdf PDF
Performance-Work-Statement_UPS.pdf PDF
WD.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

What was the Incumbent contract number? And award amount?

For contract number FA5215-12-C-0008, the contract award amount was $59,959.85.

A list for the serial numbers for all the UPS units, and a listing of the battery jars used in each unit.

All units use sealed batteries.

Powerware 9390-80 - EA252CBA06 – 2 strings w/40 Jars per string Powerware 9315-225 – EA202ZBX01 – 3 strings w/40 Jars per string Powerware 9315 – EU253ZXX02 – 4 strings w/40 Jars per string Powerware 9315 – EX132ZXX09 – 4 strings w/40 Jars per string Powerware 9315 – EX131ZXX02 – 4 strings w/40 Jars per string Powerware S50 – J12E027291EDA – 2 strings w/40 Jars per string

Entry into building 988?

The awarded contractor will have to have an Entry Authority Listing (EAL) posted for authorized personnel to enter this building.

PACAF Headquarters building, how to bring maintenance truck closer?

Entry to PACAF headquarters maintenance roads are behind security check points, a member of 747 CS can permit access at the gate. This can be coordinated with the contracting officer representative (COR).

Building 1102 UPS is being replaced; does this affect the preventative maintenance (PM) plan?

The new UPS will be covered under the contract in addition to its manufacturer warranty. Preventative maintenance will be scheduled according to the Performance Work Statement (PWS).

Can you clarify the CLIN on Unscheduled Maintenance?

Warrenty CLIN (Unscheduled Maintenance) has been amended in the solicitation, it is no longer priced per occurance, it is now listed as Firm Fixed Price. This CLIN is a warrenty, it covers duty day unscheduled maintenance. Priced per year of coverage. You can find this on Amendment FA5215-13-T-0002-00002 which will be posted on 21 Nov 2012.

image1.emf

Microsoft_Office_Excel_Worksheet1.xlsx Sheet1

BLDG 998 RM 101 BLDG 998 RM 120

Powerware 9390-80 Powerware 9315-225, Model 225

40kVA 225kVA/190kW

EA252CBA06 EA202ZBX01

Battery: C&D Type

UPS12-475

Sealed battery Sealed battery

40 Jars 120 Jars

2 strings w/ 40 Jars per string 3 Strings w/40 Jars per string

Notes: Installed in 2007, Batteries replaced week ending 17 Nov 12 Notes: Installed in 2007

BLDG 1102 RM M-114A BLDG 1109

Powerware 9315 Powerware 500

500kVA 500kVA

EU253ZXX02 EX132ZXX09 / EX131ZXX02

Battery: C&D Type Battery: Dynasty

UPS12-475-FR

Sealed battery Sealed battery

160 Jars 160 Jars per serial number

4 Strings w/40 Jars per string 4 Strings w/ 40 Jars per string x2

Notes: Incident with sprinklers in room, Slated to be replaced (powerware 9395) Notes:

BLDG 1073

Powerware S50

50kVA

J12E027291EDA

Battery: C&D Type

DM80-12

Sealed battery

80 Jars

2 Strings w/40 Jars per string

Notes: Will be covered, May be removed later.

File details come from the government source that posted it. Updated .