PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
SCHEDULE OF MATERIAL SUBMITTALS FTQW 07-1116
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
ER
'S
W A
R R
A N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
SE
R
VI
C
E / S
IZ
E
/ U
SE
S C
H
ED
U
LE
O
TH
ER
REQUIRED
SUB-
MISSION
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUSPENSE
DATE
FOLLOW-UP
DATE
CONTRACTOR
NOTIFIED
CONTRACTOR
RESUBMITTAL FINAL APPROVAL REMARKS
APPROVED DIS-
APPROVED
01 14 00 - SAFETY,
ENVIRONMENTAL PROTECTION,
REGULATIONS, AND CODES
1 Construction Operation and Safety Plan, 01 14 00, 1.6 and 1.7 3 30 days prior to
NTP
2 Safety and Health Program, 1.8 3 30 days prior to
NTP
3 Request for use of Ionizing Radiation (if required), 01 14 00, 1.10 3 30 days prior to
NTP
For Information Only. Submit only if applicable.
4 Request for use of Lasers (if required), 01 14 00, 1.11
3 30 days prior to
NTP
For Information Only. Submit only if applicable.
5 Request for use of Radioactive Materials (if required), 01 14 00, 1.12 3 30 days prior to
NTP
For Information Only. Submit only if applicable.
6 Request for use of Radio Frequency radiation (if required), 01 14 00, 1.13 3 30 days prior to
NTP
For Information Only. Submit only if applicable.
7 Request for use of Ultraviolet Radiation (if required), 01 14 00, 1.14 3 30 days prior to
NTP
For Information Only. Submit only if applicable.
8 Environmental Protection Plan, 01 14 00, 1.20 3 4 wks prior to
NTP
9 Solid Waste Weight Tickets, 01 14 00,
1.20 3 Within 3 days of work
10 Hazardous Materials Inventory (Initial, quarterly & final), 01 14 00, 1.21 3
With Environ'l Protection Plan & Quarterly
11 Hazardous Waste Accumulation Log (Initial, quarterly, & final), 01 14 00, 1.22
With Environ'l Protection Plan & Quarterly
12 Lab Test Results (if required), 01 14 00, 1.22, 1.23 3 28 days prior to excavation
13 NOI and asbestos abatement plan (if required), 01 14 00, 1.26 3 10 working days prior to work start Submit only if applicable
14 Asbestos Waste Manifests (if required), 01 14 00, 1.26 3 Within 3 days of work
15 Signed Certificate of Compliance with Land Use Controls (if required), 01 14 00, 1.30
3 w/in 30 days project start
16 Weight Tickets for All Materials or Complete Checklist for Q Hill Landfill (if required)
3 w/in 3 days of material transfer
17 Storm Water Pollution Prevention Plan (if required), 01 14 00, 1.31 3 w/in 30 days project start For Information only. Submit only if applicable.
REPAIR SEWERLINE ON FLIGHTLINE AVE PH 1 (B9039)
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
Page 1 of 2 6/6/2017
REPAIR SEWERLINE ON FLIGHTLINE AVE PH 1
(B9039)
EIELSONAFB,ALASKA
PROJECTNO.:FTQW 07-1116
U.S. GPO 1987-188-148
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
SCHEDULE OF MATERIAL SUBMITTALS FTQW 07-1116
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
ER
'S
W A
R R
A N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
SE
R
VI
C
E / S
IZ
E
/ U
SE
S C
H
ED
U
LE
O
TH
ER
REQUIRED
SUB-
MISSION
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUSPENSE
DATE
FOLLOW-UP
DATE
CONTRACTOR
NOTIFIED
CONTRACTOR
RESUBMITTAL FINAL APPROVAL REMARKS
APPROVED DIS-
APPROVED
REPAIR SEWERLINE ON FLIGHTLINE AVE PH 1 (B9039)
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
18 Copy of APDES NOI and ADEC approval (if required), 01 14 00, 1.31 3 w/in 30 days project start For Information only. Submit only if applicable.
19 Copy of APDES NOT and ADEC approval (if required), 01 14 00, 1.31 3 30 days prior to construction For Information only. Submit only if applicable.
20 Evidence of delivery of SWPPP to ADEC (if required), 01 14 00, 1.31 3 w/in 3 days of notice For Information only. Submit only if applicable.
21 FAA Form 7460-1 (if required), 01 14 00, 1.33 3 45 days before project start For Information only. Submit only if applicable.
01 40 00 - Quality Control 22 Testing Laboratory (if applicable), 01
40 00, 1.3 A., B. & C. 3 30 days prior to construction
23 Testing Agency Certifications (if applicable), 01 40 00, 1.3 D. 3 30 days prior to construction
24 Workmen Certifications (if applicable), 01 40 00, 1.3 E. 3 30 days prior to construction
01 70 00 - Record Docs & Closeout
As-built Drawings, 01 70 00, 1.4 F. 3 within 10 days of construction completion
26 Operations and Maintenance Data, 01 70 00, 1.5 3 within 10 days of construction completion
27 Warranty Documentation, 01 70 00,
1.6 3 within 10 days of construction completion
02 00 00 - CIPP Specifications 28 CIPP Product Information, 02 00 00-
1.2A, 1.3, 1.4 3 30 days prior to construction
29 CIPP Installer Certification, 02 00 00- 1.2B 3 30 days prior to construction
Page 2 of 2 6/6/2017
REPAIR SEWERLINE ON FLIGHTLINE AVE PH 1
(B9039)
EIELSONAFB,ALASKA
PROJECTNO.:FTQW 07-1116