Innovation Lab 2.0 (Rev.2).pdf

PDF 1 MB Posted

Attached to
INNOVATION LAB ROOM 149, BLDG. 10480 (JBER) Federal contract opportunity
Solicitation number
FA500020R0035
Issued by
Department of the Air Force Pacific Air Forces

View the file

Other files for this federal contract opportunity

Other files attached to INNOVATION LAB ROOM 149, BLDG. 10480 (JBER), newest first.
File Type Posted
Questons 2.pdf PDF
01020 SOW_Innovation Lab 2.0(Rev 2).pdf PDF
Q and A Innovation Lab.docx DOCX document
FA500020R0035.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A B C D E F G H

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

JOINT BASE ELMENDORF-RICHARDSON, AK

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PROJ. ENG.

DESIGN

PRELIMINARY

DRAWINGS

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

NTS

FXSB20-XXXX

X.DWG

PUTT

PUTT

FACILITY:

DATE APPR

04/20/2020

04/20/2020DATE:

04/20/2020DATE:

DATE:

DATE:

DRAWING NO:

I

U.S. AIR FORCE

TITLE SHEET

G-1

RENOVATE ROOM 149 BLDG 10480

10480

SCHEDULE OF DRAWINGS

SHEET REFERENCE NUMBER SHEET TITLE

G-1

TITLE SHEET

AD-1

DEMOLITION PLAN

A-1

FLOOR PLAN

A-2

FLOOR PLAN

E-1

EXISTING ELECTRICAL

E-2

ELECTRICAL PLAN

E-3

LIGHTING PLAN

MAP KEY

LOCATION DESCRIPTION

RICHARDSON VISITORS GATE

ARCTIC VALLEY GATE GLENN HWY SOUTHBOUND EXIT

ELMENDORF VISITORS GATE

654 6TH STREET: FIRE STATION 4

8517 20TH STREET: SECURITY FORCES

730 QUARTERMASTER ROAD: 673D CES CONTRACT MANAGEMENT

2204 3RD STREET: CORP OF ENGINEERS DISTRICT OFFICE

10480 SIJAN AVENUE: CONTRACTING

PROJECT LOCATION

JOINT BASE ELMENDORF-RICHARDSON

673RD CIVIL ENGINEER SQUADRON

KEY PLAN

NIC

A B C D E F G H

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

JOINT BASE ELMENDORF-RICHARDSON, AK

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PROJ. ENG.

DESIGN

PRELIMINARY

DRAWINGS

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

NTS

FXSB20-XXXX

X.DWG

PUTT

PUTT

FACILITY:

DATE APPR

04/20/2020DATE:

04/20/2020DATE:

DATE:

DATE:

DRAWING NO:

I

U.S. AIR FORCE

DEMOLITION PLAN

AD-1

RENOVATE ROOM 149 BLDG 10480

10480

DEMOLITION NOTES

1. DEMOLISH DOORS AND FRAMES.

2. DEMOLISH WOOD PANELING UNDER WINDOWS,

TRIM, AND SOUTHEAST WALL.

3. DEMOLISH DOWN TO STUDS; SOME AREAS HAVE

2 LAYERS OF GWB, SOME HAVE ONE LAYER.

4. CMU/CONCRETE WALLS CONTAIN LBP.

5. DEMOLISH LIGHT FIXTURES.

6. DEMOLISH CEILING GRID AND PANELS.

1 1

2 2

NOT FOR CONSTRUCTION.

CONTRACTOR TO FIELD VERIFY ALL

DISTANCES, DIMENSIONS, & LOCATIONS.

04/20/2020

3 3

3 3 3

5 5 5 5 5

5 5 5 5 5

AutoCAD SHX Text N

NIC

≈13'-0"

A B C D E F G H

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

JOINT BASE ELMENDORF-RICHARDSON, AK

DESIGNED BY: PUTT

DRAWN BY: PUTT

CHECKED BY:

PROJ. ENG.

DESIGN

PRELIMINARY

DRAWINGS

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

NTS

FXSB20-XXXX

X.DWG

FACILITY:

DATE APPR

DATE: 04/20/2020

DATE: 04/20/2020

DATE:

DATE:

DRAWING NO:

I

U.S. AIR FORCE

FLOOR PLAN

A-1 10480

NOT FOR CONSTRUCTION.

CONTRACTOR TO FIELD VERIFY ALL

DISTANCES, DIMENSIONS, & LOCATIONS.

4/20/2020

RENOVATE ROOM 149 BLDG 10480

CONSTRUCTION NOTES

1. PROVIDE NEW DOORS, FRAMES, AND

ASSOCIATED HARDWARE

2. PROVIDE NEW GLASS PARTITION AND GLASS

DOOR

3. FUR OUT AND FINISH WALLS

A B C D E F G H

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

JOINT BASE ELMENDORF-RICHARDSON, AK

DESIGNED BY: PUTT

DRAWN BY: PUTT

CHECKED BY:

PROJ. ENG.

DESIGN

PRELIMINARY

DRAWINGS

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

NTS

FXSB20-XXXX

X.DWG

FACILITY:

DATE APPR

DATE: 04/20/2020

DATE: 04/20/2020

DATE:

DATE:

DRAWING NO:

I

U.S. AIR FORCE

FLOOR PLAN

A-2 10480

NOT FOR CONSTRUCTION.

CONTRACTOR TO FIELD VERIFY ALL

DISTANCES, DIMENSIONS, & LOCATIONS.

4/20/2020

RENOVATE ROOM 149 BLDG 10480

SEE SOW (01020)

SECTION 4.5.1

SEE SOW (01020)

SECTION 4.5.1

20 MIN FIRE RATING

20 MIN FIRE RATING

PANEL "G" OUTSIDE HALLWAY DOUBLE DOORS

A B C D E F G H

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

JOINT BASE ELMENDORF-RICHARDSON, AK

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PROJ. ENG.

DESIGN

PRELIMINARY

DRAWINGS

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

NTS

FXSB20-XXXX

X.DWG

PUTT

PUTT

FACILITY:

DATE APPR

04/20/2020DATE:

04/20/2020DATE:

DATE:

DATE:

DRAWING NO:

I

U.S. AIR FORCE

EXISTING ELECTRICAL

E-1 10480

CONSTRUCTION NOTES

1. EXISTING CONDITIONS MUST BE FIELD

VERIFIED BY THE CONTRACTORS PRIOR TO

BIDDING. IF ANY FIXTURES OR DEVICES ARE

NOT SHOWN ON THIS DRAWING, THE

CONTRACTOR IS STILL RESPONSIBLE FOR

REPLACING AS DESCRIBED IN THE SOW.

2. ALL EXISTING RECEPTACLES MUST BE

REPLACED AS DESCRIBED IN THE SOW.

NOT FOR CONSTRUCTION.

CONTRACTOR TO FIELD VERIFY ALL

DISTANCES, DIMENSIONS, & LOCATIONS.

04/20/2020

RENOVATE ROOM 149 BLDG 10480

PANEL "G"

A B C D E F G H

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

JOINT BASE ELMENDORF-RICHARDSON, AK

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PROJ. ENG.

DESIGN

PRELIMINARY

DRAWINGS

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

NTS

FXSB20-XXXX

X.DWG

PUTT

PUTT

FACILITY:

DATE APPR

04/20/2020DATE:

04/20/2020DATE:

DATE:

DATE:

DRAWING NO:

I

U.S. AIR FORCE

ELECTRICAL PLAN

E-2 10480

CONSTRUCTION NOTES

1. Provide and install new 20 Amp, NEMA 5-20 duplex receptacles in the same locations as the existing receptacles. Receptacle and cover colors shall be selected by the government prior to install.

NOT FOR CONSTRUCTION.

CONTRACTOR TO FIELD VERIFY ALL

DISTANCES, DIMENSIONS, & LOCATIONS.

04/20/2020

RENOVATE ROOM 149 BLDG 10480

S

DM-3

S

DM

S

DM-3

A B C D E F G H

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

JOINT BASE ELMENDORF-RICHARDSON, AK

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PROJ. ENG.

DESIGN

PRELIMINARY

DRAWINGS

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

NTS

FXSB20-XXXX

X.DWG

PUTT

PUTT

FACILITY:

DATE APPR

04/20/2020DATE:

04/20/2020DATE:

DATE:

DATE:

DRAWING NO:

I

U.S. AIR FORCE

LIGHTING PLAN

E-3 10480

CONSTRUCTION NOTES

1. Provide and install new 6” x 4' LED flush lens light fixtures. New fixtures shall be 4000K color temperature, CRI 80+, 4000 lumens.

2. Provide and install new 20A light switches at each doorway. The large room must have 3-way dimmer switches installed at the main entry door and just outside the small room door. The small room shall be on a different switch than the large room, and have a single dimmer switch installed at the hallway door entry. Lighting in both rooms shall be on 1-100% dimmers.

NOT FOR CONSTRUCTION.

CONTRACTOR TO FIELD VERIFY ALL

DISTANCES, DIMENSIONS, & LOCATIONS.

04/20/2020

RENOVATE ROOM 149 BLDG 10480

2 2 2

Sheets and Views
Innovation Lab 2.0-Cover Sheet
Innovation Lab 2.0-AD-1
Innovation Lab 2.0-A-1
Innovation Lab 2.0-A-2
Innovation Lab 2.0-E-1
Innovation Lab 2.0-E-2
Innovation Lab 2.0-E-3

File details come from the government source that posted it. Updated .