Attachment_2_AF_Form_66.pdf

PDF 2 MB Posted

Attached to
Enclose Stairwells Federal contract opportunity
Solicitation number
FA5000-19-Q-A050
Issued by
Department of the Air Force Pacific Air Forces

About this file

Please see attached AF Form 66

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION /CONTRACT NUMBER

LI

N

E N

U M

B ER Note: 3 copies required per submittal. Government will retain all submittals.Provide an electronic copy for each submittal.

C

ER

TI

F.

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

NOTES

GENERAL

1 Project Specific Form 66 X NTP + 7 2 Construction Schedule X NTP + 14 3 Contractor's Health, Safety, and Environment Plan X NTP + 14 4 Contractor's QA/QC Plan X NTP + 14 5 DD Form 1354 X Final

6 Copy of Engineering License(s) of person or consultancy responsible for design X Design

ENVIRONMENTAL

7 Section 01120: 5.2.1 X 10 Days Prior To Work Start

8 Safety Data Sheets for all Coatings X NTP + 30

65% DESIGN

All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) and 65% Design Drawings to include:

X NTP + 30 (65%)

10 Work Plan to include access routes, time periods, and phasing for users planning efforts during cons. X NTP + 30 (65%)

11 Canopy Plans, Sections, Schedules X NTP + 30 (65%) 12 Staging/ Access Schedules X NTP + 30 (65%)

95% DESIGN

All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) and 95% Design Drawings to include:

X NTP + 45 (95%)

14 Canopy Plans, Sections, Schedules, and Details X X X NTP + 45 (95%)

100% DESIGN

All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) and 100% Design Drawings to include:

X NTP + 50

(100%)

16 Canopy Plans, Sections, Schedules, and Details X X X NTP + 50 (100%)

ARCHITECTURAL

17 Flashing, Decking, Roof Material etc. X X NTP + 45 18 Paint/Coating System X X X X NTP + 30 Submit Manufacturer's SP Rating for Prep

STRUCTURAL

PROJECT NAME

CONSTRUCT ENCLOSE EXIT

STAIRWAYS B 9443

SCHEDULE OF PROJECT SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NUMBER

FXSB 12-1223

AF FORM 66, OCT 99 Previous Edition Will Be Used

FXSB 12-1223 Construct Enclose Exit Stairways B 9443 Attachment 2 AF Form 66

SOLICITATION /CONTRACT NUMBER

LI

N

E N

U M

B ER Note: 3 copies required per submittal. Government will retain all submittals.Provide an electronic copy for each submittal.

C

ER

TI

F.

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

NOTES

PROJECT NAME

CONSTRUCT ENCLOSE EXIT

STAIRWAYS B 9443

SCHEDULE OF PROJECT SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NUMBER

FXSB 12-1223

19 Section 03300 para 3.0: Cast-In-Place Concrete X NTP+45 & After Tests Stamped Calculations Required

CLOSEOUT

20 As Builts (electronic in AutoCAD and PDF hard copies on Mylar) X Final