Attachment_1_-_Statement_of_Work.pdf

PDF 436 KB Posted

Attached to
Firewall Opening
Solicitation number
FA500019QA011
Issued by

About this file

Statement of Work

View the file

Other files

File Type Posted
Attachment_2_-_Drawing.pdf PDF
Solicitation_-_FA500019QA011.pdf PDF
Attachment_3_-_Wage_Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

773d Civil Engineer Squadron Joint Base Elmendorf-Richardson, AK

11 Jan 2019

STATEMENT OF WORK

Building 6326

Work Order # 35367

SECTION 1: PROJECT INFORMATION

1.1 PROJECT LOCATION: Project 35367 shall be completed as a routine requirement at building 6326, on Joint Base Elmendorf-Richardson, Alaska. Project hours are standard work hours.

1.2 UNIQUE REQUIREMENT: Notification of asbestos to workers. Upon completion of Demo work, 773 CES must perform a site visit to ensure demo work is fully completed.

Also, 773 CES must perform a site visit upon completion of the renovation to ensure all work is done in an acceptable manor.

1.3 PROJECT DESCRIPTION: Cut a 6’ wide by 7’ tall opening in a firewall between rooms 121 and 111, in marked location.

SECTION 2: GENERAL REQUIREMENTS

2.1 WORKMANSHIP: All work shall be accomplished in accordance with all applicable building and fire codes. Contractor shall field verify all measurements, quantities, or value stated by the Government. Liquidated damages shall be assessed for work that is not finished within the scheduled performance period.

2.2 WORKSITE: The contractor shall limit the work to the areas indicated by the government. The contractor shall make every effort not to disturb or obstruct portions of the facilities still occupied by the government. The contractor shall make efforts to minimize interference to Government operations. The contractor shall coordinate and schedule work with the facility manager prior the start of any operation. The contractor shall dispose of all construction debris off base at an approved disposal facility.

2.3 SITE SECURITY AND PROTECTION: The contractor shall make every effort to secure the work site, allowing only authorized personnel to enter the work site. The contractor shall protect the site from damage from weather, vandalism, and/or theft.

2.4 DAMAGE TO EXISTING SITE CONDITIONS: The contractor shall be responsible to repair any and all damage incurred to existing Real Property/Grounds due to poor workmanship at no cost to the government.

2.5 HEALTH/SAFETY: The contractor shall be responsible for compliance with the regulations of the United Sates Environmental Protection Agency (EPA), Occupational Safety and Health Administration (OSHA) and Air Force Occupational and Environmental Safety, Fire Protection and Health Program (AFOSH) Publication. The contractor shall maintain a clean and debris free site at all times. The contractor shall keep driveways and entrances into and around the work site clear at all times. The contractor shall not use driveways or entrances as employee parking or storage of materials unless otherwise stated. The contractor shall minimize storage of materials and equipment on site.

SECTION 3: DESCRIPTION OF WORK AND SPECIAL INSTRUCTIONS

3.1 General Requirements

3.1.1. Remove GWB, framing, or fabric wall panel on each side of firewall where opening is required. Fabric wall board that is removed will be reattached to wall after opening is cut.

3.1.2. Cut opening in both CMU walls for new 6’ wide by 7’ high opening.

3.1.3. Install a C channel lintel across new openings that will be capable of carrying the load, and support firewall from collapsing.

3.1.4. Wrap opening with matching wood casement and finish as needed to have a finished appearance.

3.1.5. Tape, texture, and paint GWB for new openings as needed to have a finished appearance.

3.1.6. Provide and install rubber cove base trim to match existing cove base in each office.

3.1.7. Protect flooring, furniture, and any other materials during project to prevent damage.

3.1.8. The contractor shall dispose of all construction debris off base at an approved disposal facility.

3.1.9. Dispose of all demolition debris shall be in accordance with state and federal guidelines.