schedule of submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_5_-__2006_Asbestos_Survey.pdf | ||
| Attachment_7_-_Wage_Determination.pdf | ||
| Attachment_6_-_Interpretive_Rule_Governing_Roof_Removal_Operations.pdf | ||
| Attachment_8_-_Grand_View_Gate_Information.pdf | ||
| Attachment_1_-_Statement_of_Work.pdf | ||
| SOL-19RA016-B900_Roof_Repair.pdf | ||
| 366_SFS_FORM_30.pdf | ||
| Attachment_2_-_Specifications.pdf | ||
| Attachment_3_-_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).
Approved Disapproved
1 01 57 19 - Environmental Management Plan - Section 1.4.1 "Waste Management Plan" 2 NTP+10days
2 01 57 19 - Names of responsible parties (for contractor) 2 NTP+10days
3 01 57 19 - List of Hazardous Materials with SDS' 2 NTP+10days 4 01 57 19 - Non-Hazarous Disposal Procedures 2 NTP+10days
01 57 19 - Certifications: Provide a copy of any required certifications, including but not limited to Asbestos Building Inspector and Lead-Based Paint Inspector certifications.
2 NTP+10days
01 57 19 - Results of Asbestos Inspection conducted by an Asbestos Building Inspector, certified in accordance with 40 CFR 763 with copy of inspector’s certification.
2 2 2 Prior to Demolition
01 57 19 - Results of Lead-Based Paint Survey conducted by a Lead-Based Paint Inspector, certified in accordance with 40 CFR 745, with copy of inspector’s certification.
2 2 2 Prior to Demolition
8 01 57 19 - Weight tickets for solid waste and recycling, to include contaminated soils and asbestos-containing materials 1
Prior to Project
Closeout
01 32 16 SD-01 (Construction Schedule) 2 NTP+10days
12 01 35 26 SD-01 (Accident Preventation Plan) 2 NTP+10days
13 01 45 00 SD-01 (Quality Control Plan) 2 NTP+10days
14 01 45 35 - SD-07 (Special Inspector Qualifications), SD--11 (Comprehensive Final Report of Special Inspections) 2 NTP+ 10days
15 01 50 00 SD-01 (Construction site plan) 2 NTP
16 01 57 19 - MHAFB Environmental Specifications - Section 1.3 Submittals (See Statement of Work) 2 2 2 2
17 01 74 19, SD-01 (Waste Management Plan, SD-11 Records) 2 2
Plan - at NTP+15days, Records - at
Project Completion
18 01 78 00 - SD-11 (Operations and Maintainance Manuals), SD-11 (As-Built Drawings) 2 2
Prior to Project
Closeout
19 02 41 00 - SD-01 (Demolition Plan, SD-11 Receipts) 2 NTP+10days
05 51 33 - SD-02 (Ladders, Installation Drawings), SD-03 (Ladders, Ladder Safety Devices), SD-07 (Fabricator Certification for Ladder Assembly)
2 2 2 NTP + 10
days
21 07 22 00 - SD-01 (Insulation Board Layout and attachment), SD-02 (Insulation, Cover Board), SD-03 (Installer Qualifications) 2 2 2 2 2 NTP+10days
07 53 23 - SD-01 (Roof plan drawing), SD-02 (EPDM sheet, Protection Mat), SD-03 (Qualifications of Manufacturer and Applicator, Wind uplift resistance classification, fire resistance classification)
2 2 2 2 2 NTP+10days
23 07 60 00 - SD-02 (Gutters, Downspouts) 2 2 2 RE NTP+10 days
Date Contractor Notified
(To be completed by Contract Administrator)
Su bm itt al
N um be rs
C on tra ct or R es ub m itt al
Fi na l A pp ro va l
Number of Copies Required
D at e R ec ei ve d in C on tra ct in g
Fi el d R ep or ts
O pe ra tin g In st ru ct io ns
Sc he du le s, L is tin gs , R ep or ts , P la n s
Project Number:
QYZH 16-8504
Project Title:
Repair Roof, CMS HQ Fac 900
Solicitation / Contract Number:
Remarks
(To be completed by Project Engineer)
Li ne
N um be r
R eq ui re d Su bm is si on
D at e
Item or Description of Item, Contract Reference, Type of Submittal
C er tif ic at e of C om pl ia nc e
Sh op
D ra w in gs
R et ur n
Su sp en se
D at e
Te ch ni ca l D at a
Te st
R ep or ts
D at e to
C iv il En gi ne er in g
Sa m pl es
C ol or S el ec tio n
M an uf ac tu re r's R ec om m en da tio n
M an uf ac tu re r's W ar ra nt y
C at al og
D at a
File details come from the government source that posted it.