Statement_of_Work.pdf

PDF 276 KB Posted

Attached to
Burn House Repair Federal contract opportunity
Solicitation number
FA4897-18-Q-0030
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Burn House Repair, newest first.
File Type Posted
Second_Floor_1.jpg JPG image
Questions_and_Answers.pdf PDF
Second_Floor_2.jpg JPG image
Door_Damage.jpg JPG image
Top_Overview.jpg JPG image
Door_Damage_3.jpg JPG image
Door_Damage_1.jpg JPG image
Top_2.jpg JPG image
Window_Damage.jpg JPG image
Side.jpg JPG image
Door_Damage_4.jpg JPG image
Top_1.jpg JPG image
FA4897-18-Q-0030.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 14 August 2017

STATEMENT OF WORK

MOUNTAIN HOME AFB (MHAFB), IDAHO

BURN HOUSE REPAIR

1 August 2018

DESCRIPTION OF SERVICES.

The quoter shall provide all labor, materials, and equipment necessary, to remove and replace the the following:

Westec insulating system for lining half the ceiling of existing 1st floor annex burn room (14' x 11')

Westec insulating system for lining west exterior wall of existing 1st floor annex burn room (14' x

8'-5" high)

Westec insulating system for lining half of south interior wall of existing 1st floor annex burn room

(11' x 8'-5" high)

Replacement corner trims and ceiling trims for entire existing 1st floor annex burn room

Replacement corner trims and ceiling trims for entire existing 2nd floor residence burn room

(2) Audible/Visual External Alarm(s) Components For Use With The Existing Scout Temperature

Monitoring System

(1) Cellular Texting Alarm(s) For Use With The Existing Scout Temp. Meter (Two Inputs Allows

For Connection Of Two Scouts)

(10) Replacement 4'-0" x 4'-0" Westemp panels

Replacement brush seal for (6) 3'-0" wide door(s)

(2) Replacement 3'-0" x 7'-0" prehung Plyco door(s)

(1) Replacement 6'-0" x 7'-0" prehung Plyco door(s)

(10) Replacement slide bolt latches for shutters and burn room doors

(18) Replacement stainless steel hinges for burn room doors / shutters

(6) Replacement locksets and guard latches for non-burn room doors

Attachment hardware for all replacement parts listed above

All items of equipment and materials described in these specifications are to be furnished installed and placed into proper operating condition in accordance with good practice and manufacturer’s written or published instructions. The period of performance is 60 calendar days.

All workmanship and materials shall be in accordance with applicable codes and regulations.

The quoter is required to remove all solid waste. Waste shall be disposed off base at an approved location with exception of recyclables which may be taken to the base recycle center

STANDARD PRODUCTS:

Equipment and materials provided for the installation shall be a standard product of manufacturer’s currently engaged in the manufacturing. All items shall be the product of the manufacturer.

QUALITY ASSURANCE:

All workmanship, manufacturing procedures and materials shall be performance guaranteed. If any findings reveal improper materials, defective components or inadequate performance as outlined in the performance/technical specifications, the quoter shall remove and replace the materials in question.

EQUIPMENT WARRANTY:

The quoter shall guarantee all materials, equipment and workmanship for a period of one (1) year from the date of the final acceptance of the completed job against original defects of material and workmanship, or excessive wear or deterioration. Defects shall be made good at the quoter’s expense with no cost or obligation to the Government.

PRODUCT DELIVERY, STORAGE, AND HANDLING:

The quoter shall be solely responsible for the delivery, storage, and handling of all products. Any equipment placed in storage shall be protected from weather, humidity, temperature variations, dirt, dust, or other contaminants. Staging shall be located at the burn building

General Information:

Hours of Operation: Normal installation operating hours are 7:30 – 4:30 Monday through

Friday. The contractor may find it necessary to deviate from the normal base hours of operation, to ensure timely completion of work under this SOW at no additional cost to the government. Work scheduled but not accomplished due to base closure for adverse weather, exercise, alerts, or installation family and/or down days shall be accomplished

NLT 24 hours after the installation has been reopened.

Federal Holidays:

New Year’s Day, 1 January

Martin Luther King’s Jr’s Birthday, the third Monday in January

Washington’s Birthday, the third Monday in February

Memorial Day, the last Monday in May

Independence Day, 4 July

Labor Day, the first Monday in September

Columbus Day, the second Monday in October

Veterans Day, 11 November

Thanksgiving Day, the fourth Thursday in November

Christmas Day, 25 December

If these holidays fall on Saturday, the preceding Friday will be observed. If these holidays fall on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the Contractor will be responsible for rescheduling services for the first day after the holiday observance.

Contractor Employees: The contractor agrees to utilize only experienced, responsible and capable individuals in the performance of the work. The contracting officer (CO) may terminate the contract or require that the contractor remove employees who endanger persons or property, or whose continuity under this contract is inconsistent with the interests of military security. The contractor further agrees to not employ persons for work on this contract if such employee is identified to the contractor, by the CO, as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.

The contractor shall not employ any person who is an employee of the United States

Government if the employment of that person would create a conflict of interest, nor shall the contractor employ any person who is an employee of the Department of the Air

Force, either military or civilian, unless such person seeks and receives approval in accordance with DoD 5500.7-R, The Joint Ethics Regulation

(http://www.dod.gov/dodgc/defense_ethics/ethics_regulation/). If prior military, the employee must have been discharged under honorable conditions with no administrative discharge actions taken against them.

Contractor Appearance: All contractor personnel must present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing contractor-furnished clothing bearing the company name and/or logo