Answers_to_Hope_Drive_questions.pdf
PDF 237 KB Posted
- Attached to
- Repair Asphalt Paving, Hope Drive Federal contract opportunity
- Solicitation number
- FA4897-16-B-0005
About this file
Attachment 9 - Q A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4897-16-C-3008 _Abstract_Of_Bids.pdf | ||
| FA4897-16-B-0005-0003 _Drawing_Addendum__1.pdf | ||
| Attachment_2A_-_Drawings_-_Addendum__1.pdf | ||
| BID_OPENING_EXTENDED_TO_12_AUG_2016_AT_2.docx | DOCX document | |
| FA4897-16-B-0010 _Amendment_2.pdf | ||
| FA4897-16-B-0005-U0001 _Due_Date_Amendment.pdf | ||
| Attachment_6_-__Notification_of_Compliance.pdf | ||
| Attachment_2_-_Drawings.pdf | ||
| Attachment_1_-_Specifications.pdf | ||
| Attachment_3_-_Enviromental_Specification.pdf | ||
| FA4897-16-B-0005 _Repair_Asphalt_Paving _Hope_Drive.pdf | ||
| Attachment_8_-_Grandview_Gate_Information.pdf | ||
| Attachment_7_-_Schedule_of_Materials_Submittals.pdf | ||
| Attachment_3_-_Enviromental_Specifications_(2).pdf | ||
| Attachment_5_-__Determination_of_Responsibility.pdf | ||
| Attachment_4_-_Wage_Determination _Elmore.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q. There is an existing rail road crossing at Sta 3+50+/- on Hope Dr.
Yes there is.
Q. Is this an active rail road crossing? If so, will special RR insurance be required?
This is not an active railroad crossing. We attempted to include the removal of the rails crossing Hope Drive as part of this project, but were instructed by Base Administration that they are to remain in place.
Q. Will construction water be available within the Air Base. If so, are there any costs associated with purchasing the water?
There is a tap located next to Bldg 1400 where contractors can fill up their water trucks. Each contractor is responsible for bring their own equipment for connecting to this tap. There is no charge to the contractor for this water.
Q. There is a gas line in the area where we are supposed to construct a temporary 24 ft. wide road. Can someone tell us how deep this line is?
Gas lines are normally placed 35” to 48” below ground surface. After the location of the line is marked the contractor is responsible for determining the exact depth by excavating down by hand and shovel. The ground surface in that area is not even close to level. However, the gas line will be exposed by the contractor and depth verified before excavation begins.
Q. Will you be accepting an email bid or if you are requiring this bid to be hard copies?
We will NOT be accpting email bids, hard copy shall be submitted.
Q. Other than the government forms required to submit this bid, are any other past performance or capability statement required to accompany our bid?
There are no other requirements being added that are not already listed in Sections L and M
Q. Is there any grading information where the temporary 24 ft. access road goes?
The contractor is tasked to design the temporary 24’ road. Grading and drainage requirements will be discussed during the kick off meeting and enforced during construction.
FA4897-16-B-0005
Attachment 9
26 July 2016
MEMORANDUM FOR PROSPECTIVE OFFERORS
FROM: 366 Contracting Squadron/LGCB 366 Gunfighter Ave, Suite 498 Mountain Home AFB ID 83648-5296
SUBJECT: Preproposal Conference/Site Visit, Solicitation Number FA4897-16-B-0010, Repair Asphalt Hope Drive, Mountain Home AFB ID
1. The preproposal conference/site visit for subject solicitation convened at 0900, 12 July 2016, at the 366 FW front gate. After signing and getting passes from 366 SFS contractors followed the contracting team to AAFES Shoppette located adjacent to Hope Drive. The following representatives attended:
Shaun J. Cecil Contracting Officer Mathew Daub Contract Specialist Charles Kalina CENM James L Sterner Trinity Joshua Legg Trinity/Knife River Kevin Crocket Trinity/ID Sand&Gravel Tracy Malay Trinity/C&A Mark Owens Central Paving Preston Ellingford Brandon Wheeler Jesse G Geary
2. Tsgt Cecil stated that all questions are to be submitted in writing, by email. No questions will be answered during the preproposal conference/site visit. Questions received, with their responses, will be posted on www.fedbizopps.gov. as an Amendment to the solicitation.
3. The preproposal conference/site visit adjourned at 0937.
SHAUN J. CECIL
Contracting Officer
FA4897-16-B-0005
Attachment 9
File details come from the government source that posted it. Updated .