Attachment2.doc

DOC document 26 KB Posted

Attached to
Asbestos Abatement
Solicitation number
FA4897-08-T-0002
Issued by

About this file

Attachment 2

View the file

Other files

File Type Posted
Attachment3.doc DOC document
FA4897-08-T-0002.rtf RTF text file
Attatchment1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4897-08-T-0002

Attachment 2

Statement of Work Bldg 273 Asbestos Abatement

Jan 2008

1) Contractor to provide all labor, materials, services, oversight and direction for the complete abatement of asbestos in building 273.

2) Building will be abated for all asbestos in preparation for building demolition. Asbestos tests on file show asbestos exists in the building.

3) Test any suspected Asbestos Containing Material (ACM). Locations include:

a. Floor tiles and mastic (approximately 5980 square feet).

b. HVAC pipe and duct work isolation (Approximately 1350 length in feet).

4) Abate any proven ACM in accordance with Mountain Home AFB Environmental Standard 01061 “Environmental Protection”.

5) The Contractor shall identify and obtain all required permits from Mountain Home AFB, federal, state, and local agencies.

6) Material storage areas and contractor staging areas will be selected during the pre-performance meeting.

7) All ACM will be disposed of at an approved off base location.

8) All solid waste generated by this project will be trans ported to off-base landfills.

File details come from the government source that posted it. Updated .