Performance_Work_Statement.pdf
PDF 220 KB Posted
- Attached to
- Ops Desk
- Solicitation number
- FA487718R0077
About this file
See the attached document for updated PWS.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA487718R0077_Ops_Desk_Amendment_(SF30).pdf | ||
| FA487718R0077_Ops_Desk_Amendment.pdf | ||
| FA487718R0077_Ops_Desk.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement For
Operations Desk Rebuild Service
1.0. Description of Services. The contractor shall furnish all labor, parts, tools, materials, equipment, transportation, personnel, management, and supervision necessary to install all custom mill work, work surfaces, and hardware in building 4836, in support of the 79th Rescue Squadron (79 RQS), on Davis-Monthan AFB (DMAFB), AZ.
1.1. Basic Services. The contractor shall provide and install two (2) countertops to function as an operations desk (see appendix 1). The countertops will be of a high quality dark wood or veneer (walnut as an example) with a light gray granite countertop. The demolition of the current desk and countertop will be included in the work.
1.1.1 The first countertop (towards the back wall of the room) will measure approximately 168 inches in length, 44 inches in height and 30 inches in depth with three cabinets below it each measuring 55 inches in length. There shall be an inverted U-shape cabinetry on top of the countertop cabinet measuring 54 inches height, 17.5 inches wide and 30 inches in depth. The side of inverted U-shape cabinetry shall have three shelves approx. 18 inches in height. The top of the inverted U-shape cabinetry shall not have any cabinets but must connect the side cabinets with clean appearance. Additional cut outs need to be provided for existing wall outlets.
1.1.2 The second larger countertop will measure approximately 190 inches by 36 inches in length, 46 inches in height and 30.5 inches wide with top portion measuring 16 inches wide and 13 inches height with space divided into five sections. Swing door made of same material with built-in countertop shall be provided on the short length of the countertop measuring approx. 36 inches in length and equal in height to match rest of the desk. There shall be enough room for two computer work station with enough space for two monitors per station and the associated cables to go through the cutouts into the desk. Additional cut outs need to be provided for existing wall outlets. There shall be a cabinet approximately 63 inches in length 36 inches deep with two shelves that divides the two work stations.
1.1.3 Government personnel will empty bookshelves and remove other items susceptible to falling from the furniture including electronic, prior to the contractor commencing the work.
1.2. Design. Upon contract award and prior to installation, the contractor shall provide a formal design for government approval. The contractor is responsible for acquiring measurements to complete required scope of work for custom mill work requirements. The contractor will come view the room as it currently is to develop detailed plans prior to execution.
The contractor shall ensure that all services will be completed in a period not to exceed 60 days from when the contract is awarded.
1.3. Permits. The contractor shall ensure all permits, manifests, and environmental requirements, etc. are accomplished prior to beginning work. The contractor shall provide a copy of permits to the Government point of contact (POC) upon request.
1.4. Asbestos Containing Materials (ACM). There is no Asbestos Containing Materials (ACM) detected at the worksite.
1.5. Work Site Preparation. Prior to commencing any work the contractor shall coordinate the date and time and any set-up with the Government Point of Contact.
1.6. Waste Removal. The contractor shall remove all debris from the work site and place in contractor provided waste containers. The contractor shall dispose of waste at a permitted waste site. Upon completion of services, floor and surrounding area shall be completely free of the above-mentioned waste.
1.7. Warranty. The contractor shall provide a warranty for any products and labor that covers damage to cabinets, surfaces, hardware, mounting brackets, and damages to wall due to insufficient mounting support for a period of 1-year from the time of completion. Upon completion the contractor shall provide the Government POC with two copies of warranty documents.
1.8. Government Point of Contact. The Government POCs are Major Callahan and Captain Kryder from the 79 RQS, who can be reached at (520) 228-7979.
2.0. General Information
2.1. Contract Manager. The contractor shall designate a contract manager, who will be responsible for performance of services. Upon contract award, the contractor shall submit the name of the contract manager in writing to the Contracting Officer. The contract manager shall have full authority to act for the contractor on all matters relating to daily operation of this contract. The contract manager shall be available within 60 minutes, either in person or by telephone, during normal duty hours to discuss performance with Government personnel. The contract manager must be able to read, write, speak, and understand English fluently. The contract manager and alternate(s) contract manager shall have a minimum of three years’ experience in work related to that being performed.
2.2. Contractor Employee Restrictions. The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the Contracting Officer as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.
2.2.1. Conflict of Interest. The contractor shall not employ any individual who is an employee of the United States Government if the employment of that individual would create a conflict of interest, nor shall the contractor employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval of the employment in accordance with DODD 5500-7, Standards of Conduct. In addition, the contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies contained in AFI 64-106, Air Force Industrial Labor Relations Activities.
2.3. Government Hours of Operation. The official hours of operation at Davis-Monthan AFB are 7:30 a.m. – 4:30 p.m., Monday through Friday, excluding holidays. The contractor shall perform services during these hours.
2.4. Recognized Federal Holidays. The following federal holidays are observed at Davis-Monthan AFB. The contractor shall not perform services on federal Holidays.
New Year’s Day Labor Day Martin Luther King's Birthday Columbus Day Presidents’ Day Veterans’ Day Memorial Day Thanksgiving Day Independence Day Christmas Day
2.5. Fire Prevention and Safety. Contractor employees shall comply with DMAFB Fire Protection Program, Air Force Occupational Safety and Health (OSHA), Air Force Occupational Safety, and the Fire Prevention and Health Program. Compliance with OSHA and other applicable laws and regulations for the protection of employees is exclusively the obligation of the contractor, and the government will assume no liability or responsibility for the contractor’s compliance or noncompliance with such responsibilities.
2.5.1. Safety Equipment. The contractor is responsible for providing all safety equipment for contractor employees. Contractor employees shall use proper safety equipment at all times during the performance of this contract, and shall perform all tasks in a safe manner.
The Government has the right to terminate cleanings if the contractor is practicing unsafe work practices or lacks proper safety equipment, at no cost to the Government. The Government may also terminate cleanings if unsafe weather conditions exist during the cleanings.
2.5.2. Work Areas. The contractor shall, at all times, keep work areas free from accumulations of waste material, rubbish, tools, scaffolding, equipment, and materials. Upon completion of the job or when away from the work site, the contractor shall leave the work area and premises in a clean, neat, safe and workmanlike condition. The contractor is responsible for removal and proper disposal of all job related waste material at a permitted site.
2.6. Inspection of Services. The contractor’s work shall be subject to inspection upon work completion. The presence or absence of the inspector shall not relieve the contractor from strict compliance with the requirements of this performance work statement, nor shall the presence of an inspector relieve the contractor from any deficiency that may be noted during the final inspection. Upon completion of work, the contractor shall notify the Government point of contact, so a joint inspection can be accomplished.
2.7. Smoking in Air Force Facilities. Contractors are advised that the Air Force has placed restrictions on the smoking of tobacco products in Air Force facilities. Air Force Instruction
40-102, Tobacco Use in the Air Force, outlines the procedures used by the commander to control smoking in our facilities. Contractor employees and visitors are subject to the same restrictions as Government personnel. Smoking is permitted only in designated smoking areas.
2.8. Security Requirements
2.8.1. Identification Badges. The contractor shall obtain identification badges for all employees requiring access to DMAFB. Applicants may obtain ID badges from the Security Forces Pass and Badge Section, at the Craycroft Visitor Center, Davis-Monthan AFB, during the hours of 7:00 a.m. to 4:00 p.m., Monday through Friday.
2.8.2. Listings of Employees. Upon contract award the contractor shall provide a listing of contractor employees that will perform services on DMAFB to the 79 RQS POC, so security checks can be performed. The list shall include contractor employee’s first and last name, date of birth, social security number, driver’s license number and state of issue. The contractor shall submit an updated listing to COR when an employee's status or information changes.
2.8.3. Traffic Laws. Contractor employees shall comply with all DMAFB traffic regulations.
Contractor employees are subject to random vehicle speed control checks. Contractor personnel cited for speeding on the installation may suffer loss of base driving privileges and debarment from the base. The use of cell phones is prohibited while driving on DMAFB, unless the phone is hands free phone. Seat belt use is mandatory for all vehicle occupants.
2.8.4. Random Personnel and Vehicle Searches. Contractor personnel are subject to random personnel and vehicle searches. If contractor personnel refuse to be searched, they will be denied entry to the base, and may result in loss of base driving privileges and debarment from the base.
2.8.5. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor owned vehicle or privately owned vehicle while on Davis-Monthan AFB.
2.8.6. For Official Use Only (FOUO). The contractor shall comply with DOD 5400.7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
2.8.7. Reporting Requirements. Contractor personnel shall immediately report to an appropriate Government authority any information or circumstances of which they are aware may pose a threat to the security of Department of Defense personnel, contractor personnel, resources, and classified or unclassified defense information.
2.8.8. Physical Security. The contractor shall safeguard all Government property, including controlled forms provided for contractor use. At the close of each work period, Government equipment, facilities, and other valuable materials shall be secured.
2.9. Environmental Protection Compliance
2.9.1. Environmental Protection Compliance. The contractor shall comply with all applicable Federal, State, and local laws, regulations, and requirements regarding environmental protection.
In the event environmental laws/regulations/requirements change during the term of the contract, the contractor shall comply with such law/regulation as changed. The contractor is responsible for any penalties, fines, etc. resulting from violations. The contractor shall immediately notify the CO when violations occur, and cooperate fully with fire department personnel and Government investigators.
2.9.1. Adherence to the Davis-Monthan Air Force Base Contractor Environmental Guide.
Adherence to this guide will help increase your company’s awareness of the installation’s Environmental Management System (EMS), and the environmental regulatory requirements that impact DMAFB.
2.9.1. Environmental Management System (EMS) Awareness Training. The contractor shall comply with the DMAFB Contractor Environmental Guide in completing the required EMS Awareness Training prior to start of work. The Contractor Environmental Guide is available on the Environmental, Safety, Occupational Health (ESOH) Training Network at www.esohtn.com. Instructions for this site are found in PWS paragraph 4.9.
2.9.2. Environmental Laws and Regulations. The contractor shall comply with all applicable Federal, State, and local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations/requirements change during the term of the contract, the contractor shall comply with such law/regulation as changed. The contractor is responsible for any penalties, fines, etc. resulting from violations.
The contractor shall immediately notify the COR when violations occur, and cooperate fully with fire department personnel and Government investigators.
2.9.3. Environmental Permits. Contractors shall comply with all regulatory requirements to include permits if applicable. Pima County Department of Environmental Quality (PDEQ) and Arizona Department of Environmental Quality (ADEQ) require permits for asbestos removal or demolition as well as projects that require earth-moving or soil disturbance. These requirements may include storm protections. The contractor shall treat areas subject to dust producing activities with liquid palliatives which will not harm regrowth of vegetation, or other methods of dust control. The contractor shall also ensure methods to protect native plants, birds and wildlife are included in projects where required. All permit costs shall be considered as having been included as a factor in the contractor's bid price.
2.9.4. Hazardous Materials/Waste. The contractor shall be responsible for the proper management of both hazardous and non-hazardous waste. The contractor shall segregate hazardous or regulated materials and non- hazardous or non-regulated materials and handle, transport, store, and dispose of those materials, in accordance with the Resource Conservation and Recovery Act, all applicable federal, state, and local statutes and regulations, and IAW Appendix C, Hazardous, PCB, and Universal Waste: Proper Management and Disposal, of the Contractor Environmental Guide. The contractor shall coordinate all hazardous shipments http://www.esohtn.com/ with the 355 Civil Engineer Squadron Hazardous Waste Program Manager (355 CES/CEIE) at 228-4840.
2.9.5. Hazardous Material (HAZMAT) Handling. The contractor shall have approval from Hazardous Waste Program Manager (355 CES/CEIE) at 228-4840, in accordance with the Contractor Environmental Guide, prior to handling, using, and storing any chemicals, solvents, lubricants, and other products that require Safety Data Sheet (SDS) or Material Safety Data Sheet (MSDS) on the installation. The contractor shall plan, fill out, and submit a HAZMAT worksheet to the COR prior to bringing HAZMAT on the base - see Appendix A, Guidance For Submission Of Safety Data Sheets For Hazardous Material (HAZMAT) and Reporting of Hazmat Usage, and Attachment(s) A-1 to A-3 of the Contractor Environmental Guide for details. The contractor shall maintain one copy of the MSDS’s for each HAZMAT line item used within the work center.
2.9.6. Prohibited Substances/Chemicals. The contractor shall not use products that are, or contain Extremely Hazardous Substances (EHS), Ozone Depleting Substances (ODS), and/or Persistent Bio-accumulative and Toxic (PBT) chemicals. Any HAZMAT containing one of these banned substances will not be allowed on base. Contact the environmental office (355 CES/CEIE) at 228-7201 if you have any questions on materials.
2.9.7. Hazardous Materials/Waste Spills. The contractor shall take every reasonable precaution to prevent spills of HAZMAT, and immediately report any HAZMAT spills to the COR and base fire department by calling 228-3333, in accordance with Appendix J, HAZMAT Incident Response Procedures, of the DMAFB Spill Prevention, Control, and Countermeasure (SPCC) Plan. The contractor shall comply with this plan when handling and storing all oils and fuels. The SPCC Plan can be found on the ESOH Training Network. The contractor shall clean and dispose of all HAZMAT spills in accordance with local, state, and federal laws and regulations and the Contractor Environmental Guide. The contractor shall bear full financial obligation incurred from cleaning and disposing of HAZMAT spills, or release of HAZMAT within the confines of DMAFB by contractor employees.
2.9.8. Spill Containment Kits. The contractor shall ensure that all vehicles used for transport of HAZMAT on DMAFB, carry a spill containment kit capable of containing a spill, until first responders arrive. The contractor shall make spill containment kits available for inspection by Government personnel, upon request.
3.0. Government Provided Services
3.1. Utilities. The Government will provide water and electricity inside of facility.
3.1.1. Conservation of Utilities. The contractor shall practice utility conservation and is responsible for operating under conditions that prevent the waste of utilities.
3.2 Emergency Services. The Government will provide security forces services (call 228- 4444 for emergencies only), and fire protection services (call 228-3333). There are no emergency medical services available on DMAFB, therefore the contractor should call 911 for medical emergencies. If the contractor calls 911 from a Government phone, the contractor must tell the operator that they are calling from DMAFB.
4.0 APPENDICES
4.1 Appendix 1 – Sketch
| 2.0. General Information |
| 2.8. Security Requirements |
| 2.9. Environmental Protection Compliance |
File details come from the government source that posted it.